A fire pressure reducing valve (PRV) lowers water pressure to a safe value before it reaches sprinklers or hose outlets on the lower floors of towers and tall buildings. It is usually needed when system pressure exceeds the rating of the components (175 psi for most sprinkler components) or the limit allowed at a hose outlet, and it must be set correctly at commissioning and tested afterwards.

For a comparison of fire pump types (electric, diesel, jockey, end suction, split case and vertical turbine), see our full guide.

This guide explains how a pressure reducing valve differs from a pressure restricting valve and a relief valve, when designers call for one, what NFPA 13 and NFPA 14 say about installation, and how NFPA 25 inspection and testing works. The subject sits at the core of fire fighting systems design for high-rise buildings.

Key takeaways

  • A PRV is used when supply pressure exceeds the pressure rating of system components. NFPA 13 then limits its outlet setting to 165 psi.
  • NFPA 14 limits hose valve outlet pressure to 175 psi and residual pressure at Class II and III outlets to 100 psi.
  • A pressure restricting valve limits pressure only while water flows. A pressure reducing valve limits it under flow and no-flow conditions.
  • Each PRV needs inlet and outlet gauges, a downstream relief valve and a means to test it at system demand.
  • A common programme is quarterly inspection, an annual partial flow test and a full flow test every 5 years.
In this article
  1. What is a pressure reducing valve in a fire network?
  2. Pressure reducing, pressure restricting or relief valve?
  3. When does a sprinkler system need a fire pressure reducing valve?
  4. Pressure reducing hose valves in standpipe systems
  5. How is a PRV set at commissioning?
  6. NFPA 25 inspection and testing
  7. Common project mistakes
  8. How AZEIDK supports high-pressure networks
  9. Frequently asked questions
  10. Conclusion

What is a pressure reducing valve in a fire network?

In a 30-storey tower the fire pump is sized to deliver the required pressure at the highest outlet. The lower floors therefore see much more, because the water column adds pressure with height and the pump churn pressure adds to that. The pressure reducing valve takes the high pressure at its inlet and delivers a controlled pressure at its outlet that does not exceed the value set by the designer.

It is installed in two common places: on the floor branch before the sprinkler zone control station, or inside the fire hose cabinet as a pressure reducing hose valve. Some towers group several valves into one station on the main to feed a whole pressure zone.

Pressure reducing, pressure restricting or relief valve?

These names are often mixed up in bills of quantities, but the difference matters at submittal stage:

ValveWhen it actsTypical use
Pressure restrictingLimits pressure only during flowHose outlets where static pressure does not exceed 175 psi but residual pressure must be limited
Pressure reducingLimits pressure under flow and no-flowFloors where pressure exceeds 175 psi and high-pressure sprinkler branches
Pressure reliefOpens and discharges on unexpected overpressureDownstream of a PRV to protect components if the PRV fails

Consulting-Specifying Engineer also separates non-pilot-operated PRVs, which suit lower flows and have a noticeable pressure drop, from pilot-operated PRVs, which cover a wider flow range with less residual loss. The flow range of the zone the valve feeds drives the choice.

When does a sprinkler system need a fire pressure reducing valve?

Under NFPA 13 (2019 edition, as summarised by CSE), components must be rated for at least 175 psi or the maximum working pressure, whichever is greater. Where supply pressure exceeds the component rating, a PRV is installed with its outlet set at no more than 165 psi. The standard also requires:

  • A gauge on the PRV inlet and outlet. The downstream system gauge can serve as the outlet gauge, but a dedicated inlet gauge is needed.
  • A relief valve of at least ½ inch downstream of the PRV and upstream of the protected components, set no higher than their rating and piped to a suitable drain.
  • An indicating control valve on the PRV inlet, unless the PRV listing already covers this.
  • A downstream means of testing the PRV at system demand flow.

The alternative some designers study is splitting the tower into pressure zones with separate pumps or risers. That decision belongs to the engineering design and hydraulic calculations stage, not to site improvisation.

Pressure reducing hose valves in standpipe systems

NFPA 14 (2019 edition, per the same source) sets specific limits at hose outlets:

  • Pressure at a hose valve outlet must not exceed 175 psi.
  • Class I outlets (2½ inch, for fire department use) require 100 psi.
  • Class II and III outlets (1½ inch) have their residual pressure limited to 100 psi with a restricting device.
  • On floors above 175 psi, use pressure reducing hose valves, an in-line PRV serving no more than two hose valves, or a full PRV assembly where more than two are served.

The source describes a PRV assembly (PRVA) as two PRVs in series for redundancy, each with isolation valves, inlet and outlet gauges, a supervised high-pressure switch and a relief valve, plus a normally closed bypass of equal size. The fire department connection must feed the system downstream of the assembly. For standpipe classes in general, see our NFPA 14 standpipe guide.

How is a PRV set at commissioning?

Factory settings are not left as they are. Typical steps during testing and commissioning:

  1. Review the setting schedule on the drawings: expected inlet pressure on each floor, required outlet pressure and design flow.
  2. Check flow direction against the arrow on the body, and confirm gauges, relief valve and test outlet are in place.
  3. Set and record outlet pressure under static and flowing conditions, since a PRV must hold pressure in both.
  4. Confirm the relief valve stays closed in normal operation and the high-pressure switch signals the fire alarm panel when simulated.
  5. Record the setting of every valve in the handover file and tag it at the valve.

Jensen Hughes notes that at the 1991 One Meridian Plaza fire the standpipe PRVs were not properly set and did not provide the pressure firefighters needed, a case still cited on the effect of wrong settings.

NFPA 25 inspection and testing

A PRV stays idle for most of its life, and deposits or corrosion can lock the seat. As summarised by Jensen Hughes with reference to NFPA 25, a maintenance programme typically includes:

TaskFrequencyWhat to record
Visual check of readings, valve position and handwheelsQuarterlyInlet and outlet pressure, condition
Partial flow test to move the seatAnnuallyPressure before and during opening
Full flow test of each PRVEvery 5 yearsOutlet pressure at full flow against the set value

Older buildings may lack the outlets and drains needed for full flow testing, and the gap often shows up only at the first five-year test. Adding them at design stage costs far less.

Common project mistakes

  • Specifying a standard hose valve on a floor above 175 psi because the bill of quantities did not separate floors.
  • Installing a PRV with no downstream relief valve, or piping the relief to a point that cannot take the discharge.
  • No test outlet or adequately sized drain riser, so full flow testing is impossible.
  • Setting every PRV to one value although inlet pressure changes from floor to floor.
  • Forgetting that the fire department connection must feed downstream of the PRV assembly.

How AZEIDK supports high-pressure networks

The AZEIDK team reviews hydraulic calculations for towers, identifies floors that need pressure reducing or restricting devices, sets and tests the valves at handover and adds them to the maintenance schedule. AZEIDK supplies the Cla-Val 90G-21 fire protection pressure reducing valve, the Giacomini A201 field-adjustable pressure reducing valve, along with the Cla-Val fire pump valves covered in our article on Cla-Val fire pump valves. The topic matters most for residential towers and developments and hotels.

Frequently asked questions

When do I need a pressure reducing valve on a sprinkler system?

When supply pressure exceeds the component rating, which is 175 psi for most components. NFPA 13 then limits the PRV outlet setting to 165 psi.

What is the difference between a pressure reducing and a pressure restricting valve?

A restricting valve limits pressure only during flow. A reducing valve limits it under flow and no-flow, so it is needed where static pressure exceeds 175 psi.

What is the maximum pressure at a fire hose cabinet outlet?

Under NFPA 14 it must not exceed 175 psi at the hose valve outlet, and residual pressure at 1½ inch outlets is limited to 100 psi.

Does a PRV need a relief valve?

In sprinkler systems, yes. A relief valve of at least ½ inch goes downstream to protect components if the PRV fails, piped to a suitable drain.

How often should a PRV be tested?

A common NFPA 25 programme is quarterly inspection, an annual partial flow test and a full flow test every 5 years, plus any local authority requirements.

Can a tower avoid PRVs altogether?

Sometimes, by splitting the building into pressure zones with separate pumps or risers. Hydraulic calculations and the cost of each option decide it.

Conclusion

A pressure reducing valve is a small symbol on a drawing, yet it decides whether a firefighter gets a usable hose stream on the fifth floor of a tall building. Three things protect it: the right type for the pressure and flow, a documented setting for each valve at commissioning, and periodic testing that is never postponed. In Saudi Arabia the binding references are the Saudi Fire Protection Code SBC 801 and Civil Defense requirements, with NFPA standards used as technical references adopted by the designer.

Reviewing pressures in a tower or tall building? Send us the drawings and pump schedule, and our team will review pressure zones, PRV locations and their testing. Contact the AZEIDK team

Share this article