The safety equipment installation certificate (شهادة تركيبات أدوات السلامة), often called the civil defense installation certificate, is issued by a qualified safety company approved on the Civil Defense Salamah platform. It confirms that the safety tools required for a facility were actually installed by that company. It is not the Civil Defense licence (Salamah certificate) and it is not the technical report. The technical report is issued by engineering service offices approved on the platform for some activities, not by supply and installation companies. AZEIDK issues the safety equipment installation certificate after supply and installation, as part of its Civil Defense approval support service.
Key takeaways
- The installation certificate is issued by a qualified safety company on Salamah and proves installation.
- The technical report is issued by an approved engineering or technical services office, for some low to medium risk activities.
- Invoices, reports, contracts and certificates are supporting documents. The final licence is issued by Civil Defense through the platform.
- High-risk (indirect) activities need a contract with a safety company, maintenance contracts and a Civil Defense inspection before the licence.
- Check any safety company against the qualified companies list on Salamah before you sign.
In this article
- What is the civil defense installation certificate?
- Who issues the installation certificate and who issues the technical report?
- How do the Salamah documents differ?
- Where does the installation certificate fit in the licence journey?
- Which tools does the installation certificate cover?
- What should the owner prepare before requesting the certificate?
- How do you check a safety company before signing?
- Does the installation certificate replace a maintenance contract?
- Common mistakes that delay the licence
- Frequently asked questions
- Conclusion
What is the civil defense installation certificate?
Salamah (salamah.998.gov.sa) is the General Directorate of Civil Defense portal for issuing and renewing Civil Defense licences for facilities. It was developed by Elm. Elm’s product overview of the portal lists the services of safety companies clearly: issuing the safety tools installation certificate, providing maintenance contracts, and issuing safety tools invoices for some direct activities.
The idea is simple. The facility owner has to show that the safety tools required for the activity are in place and installed. When a safety company supplies and installs them, it issues this certificate on the platform and it becomes part of the application file. Some people call it the “Civil Defense installation completion certificate” because it comes after installation and before the licence is completed.
Who issues the installation certificate and who issues the technical report?
This is where most confusion happens. The platform separates two types of providers:
- Qualified safety companies: supply and installation of safety tools, the installation certificate, safety tools invoices for some direct activities, and maintenance contracts.
- Approved engineering or technical services offices: technical reports for some low to medium risk activities, after inspecting the facility.
AZEIDK is a supply, installation and maintenance company. It issues the safety equipment installation certificate and does not issue the technical report. If your activity needs a technical report, that is the job of an engineering office approved on the platform, and our team can coordinate with that office on any works needed before its visit.
How do the Salamah documents differ?
| Document | Issued by | When it is needed |
|---|---|---|
| Civil Defense licence (Salamah certificate) | General Directorate of Civil Defense through the platform | The final document for the facility and its activity, valid one year from issue according to Elm |
| Safety equipment installation certificate | Qualified safety company on the platform | When safety tools are installed by a safety company |
| Safety tools invoice | Qualified safety company on the platform | For some direct activities |
| Technical report | Approved engineering or technical services office | For some low to medium risk activities |
| Maintenance contract | Qualified safety company on the platform | For indirect (high-risk) activities |
The platform decides the documents for each activity. You can check how your activity is classified through the investor journey service on Salamah. Licence details are in our Salamah certificate guide.
Where does the installation certificate fit in the licence journey?
- Apply on Salamah: the owner enters the facility and activity data, and the platform sets the classification and requirements.
- Choose a safety company: from the list of qualified and approved companies on the platform. According to Elm, after initial approval the owner receives a text message with a verification code and gives it to the company so it can complete the requirements and start installation.
- Survey, supply and installation: the company surveys the site, supplies the required tools and installs them to suit the activity, area and layout.
- Installation certificate: once installation is complete, the company issues the certificate on the platform.
- Other requirements: the technical report from the engineering office where required, or maintenance contracts and inspection for indirect activities.
- Licence: issued by Civil Defense once the file is complete.
We do not quote fees or timelines here, because they depend on the activity and on what the platform shows at the time of the application.
Which tools does the installation certificate cover?
The certificate covers what was actually installed from the tools the platform requires for the activity. The list differs between a small shop, a warehouse and a restaurant, and depending on the activity can include:
- Fire extinguishers of the right type and size for the hazard, located and mounted correctly. Details are in our NFPA 10 fire extinguisher guide.
- A fire blanket and first aid kit where the activity requires them.
- Fire alarm devices: smoke or heat detectors, a control panel and sounders, where the activity or area requires them.
- Kitchen fire suppression for restaurants and cafes that need it.
The certificate is not issued for tools that were not installed, and it does not replace repairing a faulty existing system. If the facility already has an old alarm or suppression system, it is checked first and the repairs are defined.
What should the owner prepare before requesting the certificate?
- Facility details and commercial registration, matching the municipal licence.
- The Salamah application number and the verification code when it arrives.
- A simple layout or the facility dimensions and room arrangement, plus the actual activity and stored materials.
- Site access for survey and installation at an agreed time.
- Details of any existing systems: alarm panel, last extinguisher service date, any earlier Civil Defense remarks.
Before the inspection you can go through our Salamah inspection checklist to see what is usually checked on site.
How do you check a safety company before signing?
According to Elm, Salamah shows a report of the companies qualified and approved by Civil Defense. Look up the company there before you pay or hand over the verification code. Also ask for:
- A written offer listing the tools, quantities and types.
- Datasheets or product details for the extinguishers and devices.
- A clear statement of what the price covers: supply, installation, issuing the certificate, any follow-up visit.
- Clarity on the maintenance contract if your activity needs one, and who will carry it.
The maintenance contract for fire, safety and alarm systems is separate from the contract for low current and CCTV systems. Maintenance details are on our preventive maintenance page.
Does the installation certificate replace a maintenance contract?
No. The installation certificate only shows the condition of the tools on the day they were installed. Extinguishers need periodic inspection and recharging by type, the alarm panel and detectors need periodic testing, and batteries weaken over time. That is why the platform asks for maintenance contracts for indirect activities, and any facility is better off with a written maintenance programme even where the platform does not ask for one. Keep the maintenance log in the same file as the installation certificate, because it is usually among the first things requested at inspection or renewal.
Common mistakes that delay the licence
- Assuming the installation company issues the technical report, then finding the activity needs an approved engineering office.
- Installing tools through a company that is not qualified on the platform, so the certificate is not accepted.
- Changing the activity or extending the area after installation without updating the tools.
- Extinguishers that do not suit the hazard, such as a water extinguisher in an electrical room.
- Application data that does not match the municipal licence or the lease.
Frequently asked questions
Is the installation certificate the same as the Civil Defense Salamah certificate?
No. The installation certificate is issued by the safety company and proves installation. The Salamah certificate (Civil Defense licence) is issued by Civil Defense through the platform once all requirements are met.
Who issues the civil defense installation certificate?
A safety company qualified and approved on Salamah, after it supplies and installs the required tools at the facility.
Does AZEIDK issue the Salamah technical report?
No. The technical report is issued by engineering or technical services offices approved on the platform. AZEIDK issues the safety equipment installation certificate and carries out supply, installation and maintenance.
Does every activity need an installation certificate?
The platform decides the documents for each activity. Some direct activities only need a safety tools invoice or a technical report, while indirect activities need a contract with a safety company and maintenance contracts.
How long is the Civil Defense licence valid?
According to Elm’s overview of Salamah, the licence is valid for a full year from the issue date, which is the date of final Civil Defense approval.
Do I need a new installation certificate when I renew?
It depends on what the platform asks for at renewal and on any change in activity, area or tools. If any of these changed, update the tools before renewing.
Conclusion
The safety equipment installation certificate proves that a qualified safety company installed the tools your activity needs. The technical report is a different document from an approved engineering office, and the final licence comes from Civil Defense. Check your activity classification on the platform, verify the company on the qualified list, and keep the documents with your handover file. AZEIDK carries out supply and installation, issues the installation certificate and hands over the documentation and final handover file.
Need safety tools supplied and installed, with the installation certificate issued? Send your Salamah application number, activity and area, and the AZEIDK team will define the tools you need. Talk to the AZEIDK team
Related guides
- iVMS Meaning in CCTV: NVR, IPC, PTZ, CMS, PoE and IP Address Explained
- Are Sprinklers Mandatory? Civil Defense Sprinkler Requirements Under Saudi Fire Code SBC 801
- CCTV Camera Price in Saudi Arabia (KSA): What Drives CCTV System Cost for Facilities and How to Compare Installation Quotes
- Context Plus Reflective Beam Detectors: Installation, Alignment and Testing







