Building Materials Shop Requirements in Saudi Arabia: Civil Defense Approval, Paint Storage and Sprinkler Clearance

Building Materials Shop Requirements in Saudi Arabia: Civil Defense Approval, Paint Storage and Sprinkler Clearance

The building materials shop requirements issued by the Ministry of Municipalities and Housing (Ministerial Decision 4500708915/1 dated 11/2/1446 AH) govern how these shops are licensed on Balady. On safety they require Civil Defense approval before the licence is issued, refer to all requirements of the Saudi Fire Protection Code SBC 801, and set specific rules for displaying and storing paints and thinners.

For the steps to obtain the Salamah certificate from Civil Defense on the Salamah platform, see our guide; our page on Saudi Civil Defense requirements covers the general requirements for buildings and facilities.

This article summarises the fire and safety clauses of the document as published on the Ministry website and what a shop owner needs before applying. AZEIDK can design and install fire fighting systems for paint display areas and follow up the Civil Defense requirements.

Key points

  • Civil Defense approval is required before the municipal licence, with a valid commercial registration covering the activity.
  • The fire protection clause refers to all SBC 801 requirements.
  • Paint is displayed and stored only in areas with approved automatic fire protection, in containers of 5 gallons or less.
  • Aisles between display units must be at least 120 cm wide.
  • An ancillary store may not exceed 25% of the licensed area or 150 m², whichever is less, and holds low hazard materials only.
In this article
  1. Why do building materials shop requirements focus on fire?
  2. Licensing and Civil Defense approval
  3. Displaying and storing paints and thinners
  4. Shelving, aisles and clearance below the ceiling
  5. Ancillary store and mezzanine
  6. Electrical work, lighting and CCTV
  7. Municipality and Civil Defense: who checks what?
  8. Renewing the licence or adding a paint section
  9. Common mistakes in building materials and paint shops
  10. Checklist before inspection
  11. FAQ

Why do building materials shop requirements focus on fire?

A building materials shop puts non-combustible goods such as cement, blocks and steel next to higher risk goods such as paints, thinners, timber and plastic packaging. The document therefore separates storage by material, links paint display to automatic fire protection and keeps storage out of aisles, stairs and electrical rooms.

It does not design the fire systems itself. Whether a shop needs sprinklers or an alarm system, and how many extinguishers, follows from SBC 801 by area, occupancy and quantities, and the engineering office reviews this before Civil Defense approval is requested.

Licensing and Civil Defense approval

  1. Civil Defense approval before the licence is issued.
  2. A valid commercial registration that includes the activity.
  3. Approval of the supervising authority, where one exists, and any operating permit it requires.
  4. The municipal licence before operation starts.
  5. The unified QR code displayed on the facade or shop sign so licences and government documents can be checked.

Issue, renewal and the other licence actions follow the Municipal Licensing Procedures Law and its executive regulation. Civil Defense licensing for shops and its link to the Balady licence is covered in Salamah certificate for retail shops.

Displaying and storing paints and thinners

  • Paint is displayed and stored in areas equipped with approved automatic fire protection systems.
  • Display shelving is spaced at least 120 cm apart.
  • Paint may not be stored on stairs or in staff circulation areas.
  • Paint is kept in containers of 5 gallons or less.

In practice, “approved automatic fire protection” means the paint area needs an automatic system designed to SBC 801, such as sprinklers covering the display and storage zone, with density and sprinkler type chosen by the designer for the goods and shelf height. For when sprinklers are mandatory see are sprinklers mandatory under SBC 801?

Shelving, aisles and clearance below the ceiling

ItemWhat the document says
Aisles between display unitsAt least 120 cm
Space between top of stacks and ceilingNo more than 60 cm without sprinklers, no more than 40 cm with sprinklers
Display shelvingRaised at least 15 cm above the floor
Electrical and mechanical roomsNot to be used for display or storage
Stairs, external walkways and rampsFree of anything that hinders entry, exit or quick evacuation
Goods unrelated to the activityMay not be stored in the shop

Where sprinklers are installed, clearance between stacks and the sprinklers is also set by the code, so it is checked against the sprinkler design and not against the municipal document alone.

Ancillary store and mezzanine

An ancillary store inside the shop is allowed for low hazard materials related to the activity, up to 25% of the licensed area or 150 m², whichever is less, and not on the shop front.

A mezzanine may not exceed one third of the floor it sits on, or one half where the floor has an approved automatic suppression system and audible alarm. A larger mezzanine is therefore a design decision that includes fire systems, best settled before construction. AZEIDK can install the fire alarm system together with the suppression network.

Electrical work, lighting and CCTV

  • Electrical work to the Saudi Electrical Code SBC 401.
  • No exposed wiring, plumbing or outdoor AC units on the building facade.
  • Gas lighting prohibited inside and outside the shop.
  • Security cameras installed under the security camera law and its executive regulation.
  • A first aid kit in the shop.

Municipality and Civil Defense: who checks what?

The municipal document regulates the activity itself: location, area, facade, shelving, aisles and storage, and it makes Civil Defense approval a licensing condition. Civil Defense reviews fire protection and safety against the code and its regulations and issues its licence on Salamah. A shop can therefore meet the municipal shelving and aisle rules and still be delayed because the paint area has no automatic protection or an exit is blocked. Municipal licence steps are covered in Balady licence issue and renewal.

Renewing the licence or adding a paint section

The municipal licensing procedures apply to renewal and amendment as they do to issue. An existing shop that adds a paint section or enlarges its display area changes the fire risk inside, so the fire systems should be reviewed before the change, not after. Update the layout with the new paint area, check whether it needs automatic protection or an extension of the existing network, then test and update the safety documents before applying to amend the licence. AZEIDK’s existing systems assessment service is a practical starting point.

Common mistakes in building materials and paint shops

  • Extending the paint area into aisles or corners outside the automatic protection.
  • Stacking solvent containers larger than 5 gallons for wholesale.
  • Using the electrical room or stair core as a temporary store.
  • Building a mezzanine larger than one third of the floor without approved suppression and alarm.
  • Growing the ancillary store beyond the limit, or storing goods unrelated to the activity.

Checklist before inspection

  1. Define the paint and thinner area and confirm it is covered by an approved automatic system.
  2. Check aisle widths, ceiling clearance and shelf spacing.
  3. Clear electrical rooms, stairs and walkways.
  4. Keep the ancillary store within the permitted area.
  5. Install extinguishers and signs to the safety design and prepare for the visit described in Civil Defense inspection visit.

FAQ

Does a building materials shop need Civil Defense approval?

Yes. Civil Defense approval is required before the municipal licence is issued.

Are sprinklers needed in the paint display area?

Paint must be displayed and stored in areas with approved automatic fire protection; the system type and design follow SBC 801.

What is the largest paint container allowed?

Paint must be in containers of 5 gallons or less.

How wide must aisles between shelves be?

At least 120 cm between display units.

Can the shop have an ancillary store?

Yes, for low hazard materials related to the activity, up to 25% of the licensed area or 150 m², whichever is less.

Does the document set the number of extinguishers?

No. It refers fire protection to SBC 801 and Civil Defense requirements.

Can the electrical room be used for storage?

No. Electrical and mechanical rooms may not be used for display or storage, and stairs and walkways must stay clear.

Fitting out a building materials or paint shop? Send us the layout and paint area, and AZEIDK will review the protection needed, install it and follow up Civil Defense requirements. Contact AZEIDK

Sources: Building Materials Shops Requirements (Arabic PDF) (Ministry of Municipalities and Housing, 2024)
Share this article
This site is registered on wpml.org as a development site. Switch to a production site key to remove this banner.