Fire Protection Drawings in Egypt: What Alarm and Fire Fighting Sheets Contain and How to Review Them Before Submission

Fire Protection Drawings in Egypt: What Alarm and Fire Fighting Sheets Contain and How to Review Them Before Submission

Before any fire system is built in Egypt there is a set of sheets: the site plan and hydrant network, floor plans with hose cabinets and sprinklers, the riser diagram, the pump room details, and alarm plans with detectors and call points. Fire protection drawings are what Civil Protection reviews, what the supplier prices from and what the contractor builds from, and any error in them travels to site. This guide explains what each sheet contains and how an owner or project manager can review them before submission, even without being a fire engineer.

AZEIDK Egypt offers technical consulting, product selection and submittal files under AZEIDK Egypt services, and supplies components for fire fighting systems and fire alarm systems.

Quick summary

  • A fire drawing set usually includes a legend and notes sheet, a site plan, fire fighting floor plans, a riser diagram, the pump room, alarm floor plans, a cause and effect matrix and calculations.
  • Civil Protection reviews and approves fire system drawings, then inspects before occupancy through the governorate departments.
  • What the owner should check most: match with the architectural drawings, coverage of cabinets and detectors, the pump duty point, and the location of the Siamese fire department connection.
  • Design drawings are not shop drawings, and neither is the as-built set.
  • Every symbol on the sheets should match a product with a datasheet in the submittal file.
In this article
  1. What do fire protection drawings usually contain?
  2. How can an owner review fire drawings before submission?
  3. Design, shop and as-built drawings
  4. Common mistakes in fire drawings
  5. Frequently asked questions
  6. Conclusion

What do fire protection drawings usually contain?

The number of sheets depends on project size, but the usual content in Egyptian building and facility projects includes the following:

SheetContentWhat to check
Legend and general notesSymbol legend, reference codes, design criteriaEvery symbol used on the sheets is defined here
Site planExternal hydrant network, water tank, pump room, Siamese connectionFire engine access to the Siamese and hydrants
Fire fighting floor plansHose cabinets, sprinklers, pipe sizes, valvesHose coverage of every point on the floor
Riser diagramVertical pipes, floor outlets, zone valvesFloors and outlets match the floor plans
Pump roomElectric, diesel and jockey pumps, valves, test headerDuty point matches the hydraulic calculation
Alarm floor plansDetectors, call points, sounders, panelRight detector type and spacing for each room
Alarm schematicLoops or zones, isolators, modulesNumber of devices per loop or zone
Cause and effect matrixWhat happens on each alarm: lifts, HVAC, doorsLogical interfaces with other systems
CalculationsHydraulics, batteries, clean agent quantityPresent and matched to the selected products

How can an owner review fire drawings before submission?

The owner is not expected to redesign anything, but a short review with these questions catches many errors before they become expensive:

1. Do they match the latest architectural drawings?

The most common mistake is drawing the fire systems on an old architectural version. A room became a store, a wall was added, or a false ceiling height changed, and detector and cabinet spacing is now wrong.

2. Does the hose reach every point?

A cabinet with a 30 m hose does not cover a 30 m radius circle on plan, because the hose has to run around walls and furniture. See where to place hose cabinets in a building. AZEIDK Egypt supplies the Falcon Gold FG-1001S cabinet, made locally with genuine Falcon Gold components.

3. Is the pump duty point based on a calculation?

Ask for the hydraulic calculation that set the flow and pressure, and check the drawn pump matches it. 3PUMP sets available in Egypt have defined duty points from 500 to 1500 GPM. See friction loss calculation for fire networks.

4. Is the detector type right for each room?

A smoke detector in a kitchen or boiler room means false alarms, and a point detector in a very high hall may need replacing with a beam detector. See smoke and heat detector spacing. Context Plus panels and detectors are available from AZEIDK Egypt.

5. Is there a cause and effect matrix?

Without one, the links between the alarm and lifts, HVAC and gas shut-off will be improvised on site. See addressable panel programming and the cause and effect matrix.

6. Are the calculations attached?

Battery calculations for the alarm panel, agent quantity for rooms protected by gas suppression, and the hydraulic calculation. See fire alarm battery calculation.

Design, shop and as-built drawings

  • Design drawings: prepared by the consultant and submitted for approval.
  • Shop drawings: prepared by the contractor after products are selected, showing real dimensions, mounting positions and exact pipe and cable routes.
  • As-built drawings: showing what was actually installed; maintenance needs them after handover, and they are the reference for any later modification or change of use.

The drawings come with a submittal file containing datasheets and certificates for every product. See technical documents for fire equipment in Egypt.

Common mistakes in fire drawings

  • Symbols on the plans that are not defined in the legend, or one symbol used for two different products.
  • The Siamese connection drawn on a facade fire engines cannot reach.
  • Pipe sizes on the floor plan that do not match the riser diagram.
  • A pump drawn with a flow and pressure but no calculation attached.
  • An electrical or server room with no suitable protection, or with a detector only and no extinguisher specified.
  • Drawings not updated after site changes, so the as-built set does not match reality.

Frequently asked questions

Who prepares fire drawings in Egypt?

A consultant or qualified engineer prepares them under the Egyptian fire code, and Civil Protection reviews them as part of the approval process.

What is the difference between shop drawings and as-built drawings?

Shop drawings are prepared by the contractor before the work, while as-built drawings record what was actually installed once the work is finished.

Is one plan enough for both alarm and fire fighting?

Small projects sometimes combine them, but separating them makes review and installation easier, and calculations and the cause and effect matrix remain separate sheets.

What is the single most important check for an owner?

That the drawings match the latest architectural set, that cabinets and detectors cover the space, that calculations are attached, and where the Siamese connection sits.

Conclusion

Fire drawings are the basis for approval, pricing and installation. A short owner review before submission, with six questions on consistency, coverage, calculations and the cause and effect matrix, saves costly changes later. To avoid installation errors as well, see fire system installation mistakes.

Have fire drawings ready for submission or pricing? Send them to the AZEIDK Egypt team to match the components with available products and prepare the submittal file. Contact AZEIDK Egypt

Share this article