Value Engineering for Fire and Low Current Systems: Where to Save Without Breaking Code or Approvals

Value Engineering for Fire and Low Current Systems: Where to Save Without Breaking Code or Approvals

Value engineering for fire protection systems is a structured review of the design and specification that looks for a cheaper, easier-to-build or easier-to-maintain way to deliver the same function, without falling short of the Saudi Fire Protection Code SBC 801, equipment approvals or Civil Defense acceptance. The best time is the design stage; the later it happens, the less it returns. This article covers what can be reviewed in fire and low current systems, what must not be touched, and how to present a value engineering proposal to the consultant.

Key takeaways

  • The Whole Building Design Guide (WBDG) defines value engineering as disciplined procedures to seek optimum value for both initial and long-term investment.
  • Typical phases: information, speculation (creative), evaluation, development and presentation.
  • Value engineering keeps the function and changes the means; cost cutting by deletion can break the code.
  • Required approvals (UL, FM or LPCB per the specification), SBC 801 and Civil Defense requirements, fire-rated alarm cabling and secondary power are not areas for savings.
  • Every proposed item needs the consultant’s written approval before execution.
In this article
  1. What is value engineering in fire protection?
  2. Value engineering or cost cutting?
  3. Where are value engineering opportunities in fire fighting systems?
  4. Value engineering opportunities in fire alarm and low current
  5. What must not be touched?
  6. How is a value engineering proposal presented to the consultant?
  7. When is it too late for value engineering?
  8. An illustrative value engineering item
  9. Frequently asked questions
  10. Conclusion

What is value engineering in fire protection?

The Whole Building Design Guide, published by the US National Institute of Building Sciences, defines value engineering as a conscious and explicit set of disciplined procedures designed to seek out optimum value for both initial and long-term investment, and notes that the earlier it is applied, the higher the return on time and effort.

In fire systems the practical meaning is simple: the function is fixed, namely detecting fire, warning occupants and extinguishing or controlling it in line with the code. What changes is the means: pipe routing, joint type, loop arrangement, equivalent equipment, or the pump room layout. That is why our value engineering starts from the drawings and specifications review service, not from a price list.

Value engineering or cost cutting?

ComparisonValue engineeringCost cutting by deletion
Core questionHow do we deliver the same function better?What can we remove or reduce?
BasisFunction, code and life-cycle cost analysisPurchase price only
ApprovalSubmitted to the consultant with justification and documentsMay be rejected at handover or Civil Defense inspection
Maintenance costConsideredUsually ignored
OutcomeLasting savingsSavings that may turn into rework cost

Where are value engineering opportunities in fire fighting systems?

Hydraulic calculations and the fire pump

Designing on general assumptions can produce a pump larger than needed and a bigger pump room. Accurate hydraulic calculations on the final layout set the real flow and pressure, and may allow smaller pipe sizes on some branches. This is done within engineering design and calculations and approved by the consultant.

Pipe routes and riser positions

Reviewing riser positions with the architect and structural engineer can cut pipe lengths, elbows and hangers, and prevent clashes with HVAC and electrical services that cost rework later.

Joining method

Grooved couplings instead of welding in suitable locations can reduce installation time and site welding. The decision considers listing, pressure and pipe type. See sprinkler valve and grooved fitting brands in Saudi Arabia.

Choice of special suppression system

Electrical and server rooms may have more than one acceptable option. The comparison should include refill cost and room integrity over the system’s life, as in our clean agent suppression comparison.

Value engineering opportunities in fire alarm and low current

  • Addressable loop arrangement: grouping devices by floor, zone and cable route can reduce loop count and cable length while keeping required isolators. See addressable fire alarm loop design.
  • Battery calculation: calculate actual loads instead of assuming the largest capacity, as in fire alarm battery calculation, without going below the required duration.
  • Camera count: a coverage study defining each camera’s field of view can reduce the count or change the lens instead of duplicating cameras.
  • Storage: size recording capacity from resolution, frame rate and retention, as in NVR storage calculation.
  • Network: one physical network split into VLANs for cameras, access control and phones instead of fully separate networks, where the consultant accepts it.

What must not be touched?

  • Equipment approvals required by the specification, such as UL, FM or LPCB. Any alternative must carry the same level of approval.
  • SBC 801 and Civil Defense requirements for system type and coverage.
  • Design density and operating area resulting from the hazard classification.
  • Fire resistance of alarm and evacuation cabling where the design requires it.
  • Secondary power for panels and pumps.
  • Access for maintenance and testing.

If a saving touches any of these items, it is not value engineering.

How is a value engineering proposal presented to the consultant?

Proposals that get accepted are usually a clear table per item:

ColumnContent
Current itemWhat the drawing or specification shows now
ProposalThe alternative, clearly stated, with model where relevant
Technical justificationWhy it delivers the same function
Code and approval impactReference clause in the code or standard, and attached approvals
Installation and maintenance impactTime, spare parts and access
DocumentsDatasheet, revised calculations, revised drawing
DecisionConsultant’s written approval or rejection

We attach datasheets and calculations to each proposal under our technical selection of systems and equipment service, and check drawings against a list such as our fire drawings and specifications review checklist.

When is it too late for value engineering?

Once shop drawings are approved and materials ordered, every change becomes a variation needing time and approvals. After installation most alternatives turn into rework. So the review is best done before tender or at contractor award. A late review is not worthless: items such as pump room layout or storage sizing can still be possible during construction if submitted quickly with complete documents. In existing buildings it starts from an assessment of existing systems and scope definition.

An illustrative value engineering item

Take a hypothetical commercial building designed with two sprinkler risers at opposite ends, each feeding a long main through corridors crowded with HVAC ducts. Reviewing the layout with the architect might show that moving one riser to a central services room would:

  • Shorten the mains and reduce elbows and hangers.
  • Move pipework away from the worst clash areas with HVAC.
  • Make the floor control station easier to reach for maintenance.

The item goes to the consultant with a revised drawing and new hydraulic calculations showing that pressure and flow at the most remote area still meet the design. Sprinkler type, density and approvals do not change; only the route does. That is the difference between value engineering and deleting items.

Frequently asked questions

How much does value engineering save on a fire systems project?

There is no fixed percentage. Savings depend on the quality of the original design and the project stage, and are only known after actually reviewing the drawings and specifications.

Can the brand named in the specification be changed?

Only with the consultant’s approval of an equivalent alternative with the same approvals and performance, backed by a complete technical submittal.

Who proposes value engineering: the contractor or the consultant?

The contractor, owner or consultant may propose it, but the final decision rests with the consultant and the approving authority. The contractor presents alternatives with documents and calculations.

Does value engineering cover electrical and HVAC works?

Where electrical, plumbing and HVAC works are delivered as an integrated MEP package, they are reviewed together to coordinate routes and plant rooms.

Does value engineering affect the Civil Defense certificate?

Not if it stays within code and approval requirements. Any change in system type or coverage must appear on the approved drawings submitted for licensing.

Is value engineering useful on a small project?

Yes, with a smaller scope. In a small building it usually focuses on equivalent equipment, routing, battery and storage calculations, and a single drawing review before tender may be enough.

What is the difference between value engineering and an approved equal?

An approved equal is a request to replace one product with an equivalent one. Value engineering is broader: it reviews the whole design, including routes, calculations, system choice, installation method and maintenance.

Conclusion

Value engineering for fire and low current systems means keeping the function and the code while choosing a better means in design, equipment, installation and maintenance. Start early, present each item with justification and documents, and stay away from approvals and code requirements. Real savings are the ones that pass the consultant and the Civil Defense inspection without rework.

Have fire or low current drawings you want reviewed before tender or construction? Send them to the AZEIDK team for drawings and specifications review and documented value engineering proposals with calculations. Talk to the AZEIDK team