About the project
Modern Warehouses Jeddah is a warehouse project in Jeddah. Facilities of this type usually hold goods in bulk for storage and distribution, often on high racking, with loading bays, forklift traffic and relatively few people spread across a large floor. Their fire protection has to be planned around how and how high goods are stored, not only around the size of the building.
Why fire and life safety matter in warehouses
In a warehouse, the stock is the fuel. Cartons, plastic packaging, pallets and stretch wrap form a continuous fire load, and tall storage lets flames climb quickly and jump across aisles. A fire that grows unnoticed in a large, lightly occupied building can overwhelm suppression and threaten the structure. Early detection, sprinklers matched to storage height and commodity, hose cabinets for first response and an alarm that reaches staff wherever they work are essential. Security systems matter too, since warehouses are often unattended outside working hours. The Saudi Building Code (SBC 801) and Civil Defense requirements govern storage buildings.
AZEIDK’s role
At the facility, AZEIDK supplied, installed, tested and commissioned fire protection, alarm and security systems in line with the project’s requirements.
Related reading: Warehouse and high-rack storage fire protection (ESFR) · Fire fighting systems
Project photos
Planning a similar project?
Our engineers can review your site and recommend the right fire protection, safety and security systems for it.




