In a warehouse with a 12 m roof, good beam detector spacing comes down to three decisions made on the drawing: which way the beams run, how far apart they are, and how far below the roof they sit. One wrong call leaves a strip of roof uncovered or inflates the BOQ.

This guide sets out the BS 5839-1 and manufacturer layout rules, then works an example with two beam detectors AZEIDK GROUP supplies in Egypt through its fire detection and alarm solutions: the TANDA TX7130 reflective beam detector and the Context Plus 55000-268 intelligent reflective beam detector. Fixing, alignment and site testing are covered separately in TANDA TX7130 Beam Detector in Egypt.

Key takeaways

  • A beam covers 7.5 m on each side, so adjacent beams are at most 15 m apart and the outer beam at most 7.5 m from the wall.
  • The beam runs 0.3 to 0.6 m below the ceiling, with both ends on solid structure.
  • Under a pitched roof, the beam at the apex only may cover 1% more on each side per degree of pitch, up to 25%.
  • A pocket guide to BS 5839-1 (2017 edition) gives a maximum ceiling height of 25 m for a beam at normal sensitivity and 40 m at enhanced sensitivity.
  • Path length sets the reflector count: the TX7130 uses one reflector up to 40 m and four reflectors from 40 to 100 m; the 55000-268 uses one reflector for paths of 5 to 50 m.
  • Beam direction changes quantities: a 60 x 36 m hall needs 3 detectors and 12 reflectors, or 4 and 4.
In this article
  1. What is mandatory and what is a design reference
  2. Beam detector spacing under a flat ceiling
  3. Mounting height and ceiling height limits
  4. Pitched and gable roofs
  5. Path length and reflector count: TX7130 vs 55000-268
  6. Worked example: a 60 x 36 m storage hall
  7. Common beam detector layout mistakes
  8. Beam detectors from AZEIDK GROUP in Egypt
  9. Frequently asked questions
  10. Conclusion

What is mandatory and what is a design reference

The legally binding document in Egypt is the Egyptian Code for the Design and Implementation of Fire Protection for Buildings, 2026 edition (Ministerial Decree No. 355 of 2026), whose third part covers electrical requirements and detection and alarm. The General Directorate of Civil Protection (Ministry of Interior) reviews drawings and inspects before occupancy.

The spacing figures here come from a pocket guide to BS 5839-1 (2017 edition), the 55000-268 installation guide, and the TX7130 datasheet, which cites BS 5839-1:2002. The current edition is 2025, so check values against your project’s edition. On an NFPA 72 project, apply NFPA 72 and the manufacturer’s instructions instead; never mix the two on one drawing.

Beam detector spacing under a flat ceiling

Lateral coverage and distance between beams

A beam detector covers a strip, not a circle. The 55000-268 installation guide gives a maximum lateral detection range of 7.5 m on each side of the beam, and a typical maximum of 15 m between adjacent detectors under a flat ceiling. That gives one detector a maximum coverage of about 1,500 m² (15 x 100 m).

So: number of beams = hall width across the beams ÷ 15, rounded up, with the outer beams no more than 7.5 m from the wall.

Distance from walls and minimum spacing between detectors

The same guide puts the beam between 0.5 m and 7.5 m from a wall, and allows no more than 3 m of the beam path to run within 500 mm of any wall or partition.

It also sets a minimum spacing between two adjacent detectors: path length x 0.0875. For a 40 m path that is 3.5 m; for a 50 m path, about 4.4 m. This matters when beams run close together.

Mounting height and ceiling height limits

Depth below the ceiling

Fix the detector and reflector to solid structure so the beam runs 0.3 to 0.6 m below ceiling level. Hot smoke collects under the roof first, so a low beam sees it later. The installation guide rules out cladding and purlins.

Maximum ceiling height

The BS 5839-1 pocket guide (2017 edition) height limits show why high halls move to beam detection:

Detector typeMaximum height (general)Allowed in 10% of the area
Fixed-temperature heat detector7.5 m10.5 m
Point smoke detector10.5 m12.5 m
Beam detector, normal sensitivity25 m28 m
Beam detector, enhanced sensitivity40 m43 m

At 40 m the guide notes that supplementary detection is recommended unless the risk of stratification is minimal. Stratification is a hot air layer under an uninsulated metal roof that stops cooler smoke reaching the beam. If the design relies on 40 m, agree with the manufacturer which setting counts as “enhanced” and record it at commissioning.

Pitched and gable roofs

Under a gable roof smoke collects at the apex first, so one beam runs along it. The 55000-268 installation guide allows the apex beam only to cover 1% more on each side per degree of roof pitch, up to 25%. The guide’s example: a 20 degree pitch widens the strip from 15 m to 18 m.

Other beams follow the normal 15 m and 7.5 m rule.

Path length and reflector count: TX7130 vs 55000-268

Both are reflective, but connection and path length differ:

ItemTANDA TX7130Context Plus 55000-268
ConnectionConventional: fire relay and fault relay (normally open, 2 A at 30 V DC)Intelligent addressable, loop-powered, with short-circuit isolator
Supply20 to 28 V DCFrom the addressable panel loop
Path length8 to 100 m in four spans5 to 50 m
ReflectorsOne reflector from 8 to 40 m, four reflectors from 40 to 100 mOne reflector
Sensitivity2.6, 3.8 or 5.8 dB25%, 35% (default) or 50% obscuration, i.e. 2.50, 3.74 or 6.02 dB
ComplianceEN 54-12:2015, with LPCB and CE-CPRCheck the datasheet for this model

So a 45 m path with the TX7130 needs four reflectors, while a 38 m path needs one. For the 55000-268, the installation guide recommends no more than ten beam detectors per loop unless a loop voltage drop calculation shows otherwise. For loop capacity, see addressable loop design.

Worked example: a 60 x 36 m storage hall

Take a storage hall in 10th of Ramadan or 6th of October: 60 x 36 m, a near-flat metal roof at 12 m, no structural beams dividing the ceiling. That is above the 10.5 m point smoke limit and within the 25 m beam limit. The reference is BS 5839-1.

Option 1: beams along the length (60 m)

  1. The width across the beams is 36 m, and 36 ÷ 15 = 2.4, so 3 beam lines.
  2. Place them at 6, 18 and 30 m from the long wall: 12 m apart, outer beams 6 m from each wall (between 0.5 and 7.5 m).
  3. The path is about 60 m. That is outside the 55000-268 range (up to 50 m) and inside span 3 of the TX7130 (40 to 70 m).
  4. Quantities with the TX7130: 3 detectors and 3 x 4 = 12 reflectors.

Option 2: beams across the width (36 m)

  1. The width across the beams is 60 m, and 60 ÷ 15 = exactly 4 beam lines.
  2. Place them at 7.5, 22.5, 37.5 and 52.5 m: 15 m apart, outer beams 7.5 m from the wall, at the limit. Consider a fifth line if obstructions or vents affect smoke movement.
  3. The path is about 36 m: span 2 of the TX7130 with one reflector, and within the 55000-268 range.
  4. Quantities: 4 detectors and 4 reflectors, with either model. Minimum spacing for a 36 m path is about 3.15 m; actual spacing is 15 m.
ItemOption 1 (lengthwise)Option 2 (across)
Beam lines34
Path lengthAbout 60 mAbout 36 m
Suitable modelTX7130 onlyTX7130 or 55000-268
Reflectors124
Distance from wall6 m (1.5 m margin)7.5 m (no margin)
Mounting level11.4 to 11.7 m (0.3 to 0.6 m below the roof)

Count alone does not decide it: option 1 has fewer detectors but more reflectors; option 2 allows the addressable model but has no side margin. Either way, check crane paths, future racking height, and fixing to main columns, not cladding.

Common beam detector layout mistakes

  • Dividing the floor area by 1,500 m² instead of drawing the lines and wall distances.
  • Applying the pitch allowance to every line under a gable roof, when it applies at the apex only.
  • Allowing one reflector per TX7130 without measuring the path; any path over 40 m needs four.
  • Selecting the 55000-268 for a path longer than 50 m.
  • Dropping the beam more than 0.6 m below the ceiling to clear an obstruction without reworking the layout.
  • Relying on the 40 m enhanced-sensitivity limit in an uninsulated hangar without supplementary detection for stratification.
  • Running the beam along a wall for a long stretch, or where doors or cranes cross it.

Beam detectors from AZEIDK GROUP in Egypt

AZEIDK GROUP supplies the conventional TX7130 from TANDA and the addressable 55000-268 from Context Plus, and helps choose beam direction, model and reflector count from the drawings. For choosing a detector type, see the smoke and heat detector selection guide; for point detectors in lower spaces, see smoke and heat detector spacing. See also fire protection for warehouses in Egypt and fire alarm system cost in Egypt.

Frequently asked questions

How many square metres does one beam detector cover?

Up to about 1,500 m² (15 x 100 m) per the 55000-268 installation guide, but the count comes from drawing the beam lines, not dividing the area.

How far below the ceiling should a beam detector be mounted?

0.3 to 0.6 m below the ceiling per the 55000-268 installation guide, fixed to solid structure.

What is the maximum ceiling height for a beam detector?

The BS 5839-1 pocket guide (2017 edition) gives 25 m at normal sensitivity and 40 m at enhanced sensitivity, where supplementary detection is recommended unless stratification risk is minimal.

How many reflectors does a TX7130 need?

Per the datasheet: one reflector for paths of 8 to 40 m, and four reflectors for paths of 40 to 100 m.

Can the 55000-268 cover a 60 m path?

No. Its datasheet range is 5 to 50 m with one reflector. Turn the beams to shorten the path, or use the TX7130.

How are beam detectors laid out under a gable roof?

Run one beam along the apex. That beam may cover 1% more on each side per degree of pitch, up to 25%. The other beams follow the normal rule.

Conclusion

Beam detector layout is a short calculation: hall width sets the number of beam lines, path length sets the model and reflector count, and the roof sets the mounting level. Drawing both options before the BOQ is approved often reveals a simpler layout or fewer reflectors.

Planning a warehouse or hall with a high roof? Send us the floor plan, roof height and shape, and we will propose a beam layout and model with its datasheet. Talk to the AZEIDK GROUP Egypt team

References: TX7130 Conventional Reflective Beam Detector Datasheet (TANDA UK), TX7130 Datasheet (tandauk.com), Addressable Specialist Detectors (Context Plus), Intelligent Reflective Beam Detector 55000-268 Installation Guide (Apollo Fire Detectors), Pocket Guide to Fire Detection and Fire Alarm Systems for Buildings, BS 5839-1:2017 (Apollo Fire Detectors)
Share this article
This site is registered on wpml.org as a development site. Switch to a production site key to remove this banner.