{"id":35014,"date":"2026-11-16T10:00:00","date_gmt":"2026-11-16T07:00:00","guid":{"rendered":"https:\/\/azeidkgroup.com\/sa\/media-center\/"},"modified":"2026-11-28T21:00:39","modified_gmt":"2026-11-28T18:00:39","slug":"momah-80775-construction-permits-2026-fire-systems-news-en","status":"publish","type":"post","link":"https:\/\/azeidkgroup.com\/en\/sa\/media-center\/momah-80775-construction-permits-2026-fire-systems-news-en\/","title":{"rendered":"80,775 Construction Permits in 9 Months: What It Means for Fire Systems in New Saudi Projects"},"content":{"rendered":"\t\t<div data-elementor-type=\"wp-post\" data-elementor-id=\"35014\" class=\"elementor elementor-35014 elementor-35013 elementor-bc-flex-widget\" data-elementor-post-type=\"post\">\n\t\t\t\t<div class=\"elementor-element elementor-element-4dfd080 e-con-full az-el-article e-flex e-con e-parent\" data-id=\"4dfd080\" data-element_type=\"container\" data-e-type=\"container\">\n\t\t\t\t<div class=\"elementor-element elementor-element-533769a elementor-widget elementor-widget-text-editor\" data-id=\"533769a\" data-element_type=\"widget\" data-e-type=\"widget\" data-widget_type=\"text-editor.default\">\n\t\t\t\t<div class=\"elementor-widget-container\">\n\t\t\t\t\t\t\t\t\t<div class=\"azn-head\"><div class=\"azn-brand\"><span class=\"azn-tag\">AZEIDK Radar<\/span><span class=\"azn-line\">We track the update before it reaches your site<\/span><\/div><div class=\"azn-meta\"><span>Saudi market<\/span><span>Design and approval<\/span><\/div><\/div>\t\t\t\t\t\t\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t\t\t<div class=\"elementor-element elementor-element-36d49a4 elementor-widget elementor-widget-text-editor\" data-id=\"36d49a4\" data-element_type=\"widget\" data-e-type=\"widget\" data-widget_type=\"text-editor.default\">\n\t\t\t\t<div class=\"elementor-widget-container\">\n\t\t\t\t\t\t\t\t\t<p class=\"az-intro\">On 16 November 2026 the Saudi Ministry of Municipalities and Housing announced that it issued <strong>80,775 construction permits<\/strong> across the Kingdom between January and the end of September 2026. The ministry linked the figure to the development of the municipal licensing system and the expansion of digital services on the Balady platform, with municipalities following up applications and checking that requirements are met.<\/p>\n<p>Below is what the ministry announced, followed by what this volume of new projects means for building owners and contractors planning fire protection and low current systems.<\/p>\t\t\t\t\t\t\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t\t\t<div class=\"elementor-element elementor-element-d5fe62e elementor-widget elementor-widget-text-editor\" data-id=\"d5fe62e\" data-element_type=\"widget\" data-e-type=\"widget\" data-widget_type=\"text-editor.default\">\n\t\t\t\t<div class=\"elementor-widget-container\">\n\t\t\t\t\t\t\t\t\t<div class=\"az-keybox\"><h2>Key points<\/h2><ul><li>80,775 construction permits were issued in nine months, January to the end of September 2026, according to the Ministry of Municipalities and Housing.<\/li><li>The ministry attributes the growth to simpler procedures and digital services on Balady.<\/li><li>Municipalities follow up applications and verify requirements before permits are issued.<\/li><li>The announcement gives no breakdown by region or building type.<\/li><li>Every new building needs a safety systems design that complies with the Saudi Building Code before construction, and a Civil Defense licence before operation.<\/li><\/ul><\/div>\t\t\t\t\t\t\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t\t\t<div class=\"elementor-element elementor-element-beefc9d elementor-widget elementor-widget-text-editor\" data-id=\"beefc9d\" data-element_type=\"widget\" data-e-type=\"widget\" data-widget_type=\"text-editor.default\">\n\t\t\t\t<div class=\"elementor-widget-container\">\n\t\t\t\t\t\t\t\t\t<h2>What did the ministry announce?<\/h2><p>According to the news item published on Balady, the ministry issued 80,775 construction permits in the first nine months of 2026, as part of its work to regulate construction, simplify licensing and keep pace with urban growth in cities and governorates. It said the development of the licensing system and digital services helped speed up application processing and improve the applicant journey.<\/p><p>The ministry added that it continues to work with municipalities on the construction licensing system and on integration between the entities involved in construction and urban development.<\/p>\t\t\t\t\t\t\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t\t\t<div class=\"elementor-element elementor-element-9392489 elementor-widget elementor-widget-text-editor\" data-id=\"9392489\" data-element_type=\"widget\" data-e-type=\"widget\" data-widget_type=\"text-editor.default\">\n\t\t\t\t<div class=\"elementor-widget-container\">\n\t\t\t\t\t\t\t\t\t<h2>What does it mean for project owners and contractors?<\/h2><p>A construction permit is the start of the process, not the end. A building permitted today will need fire alarm, fire fighting and emergency exit systems designed to the <a href=\"\/en\/sa\/media-center\/saudi-building-code-sbc-801-fire-protection\/\">SBC 801 fire code<\/a> during construction, and then <a href=\"\/en\/sa\/media-center\/civil-defense-fire-safety-approval-saudi-arabia\/\">Civil Defense approval<\/a> before operation. With this many new projects, three practical points stand out:<\/p><ul><li><strong>Start the design early:<\/strong> putting fire systems into the drawings before slabs are cast and services are routed avoids costly changes later. Our article on the <a href=\"\/en\/sa\/media-center\/civil-defense-fire-design-drawings-package\/\">Civil Defense fire drawings package<\/a> explains what the file needs.<\/li><li><strong>Review drawings before construction:<\/strong> design errors usually surface at the final inspection, so a <a href=\"\/en\/sa\/media-center\/fire-drawings-specifications-review-checklist\/\">fire drawings and specifications review checklist<\/a> helps catch them early.<\/li><li><strong>Plan equipment supply:<\/strong> many projects running at the same time can lengthen lead times for some equipment, so approving the equipment list early protects the schedule.<\/li><\/ul><p>New buildings also need telecom rooms, CCTV and access control, as explained in our article on <a href=\"\/en\/sa\/media-center\/mdf-idf-telecom-room-new-buildings\/\">telecom rooms in new buildings<\/a>.<\/p>\t\t\t\t\t\t\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t\t\t<div class=\"elementor-element elementor-element-b36e62b elementor-widget elementor-widget-text-editor\" data-id=\"b36e62b\" data-element_type=\"widget\" data-e-type=\"widget\" data-widget_type=\"text-editor.default\">\n\t\t\t\t<div class=\"elementor-widget-container\">\n\t\t\t\t\t\t\t\t\t<div class=\"azn-take\"><h2>AZEIDK expert view<\/h2><p>The announced figure points to a wave of projects that will reach the safety systems stage in the coming months, and a project that settles its systems design early reaches approval with fewer changes. AZEIDK provides <a href=\"\/en\/sa\/services\/drawings-specifications-review\/\">drawings and specifications review<\/a>, <a href=\"\/en\/sa\/services\/engineering-design-calculations\/\">engineering design and calculations<\/a> and <a href=\"\/en\/sa\/services\/civil-defense-approval-support\/\">Civil Defense approval support<\/a>, and installs <a href=\"\/en\/sa\/solutions\/fire-alarm-systems\/\">fire alarm systems<\/a>, <a href=\"\/en\/sa\/solutions\/fire-fighting-systems\/\">fire fighting systems<\/a> and <a href=\"\/en\/sa\/solutions\/low-current-systems\/\">low current systems<\/a>. To discuss your new project, <a href=\"\/en\/sa\/contact\/\">contact the AZEIDK team<\/a>.<\/p><\/div>\t\t\t\t\t\t\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t\t\t<div class=\"elementor-element elementor-element-d70bae8 elementor-widget elementor-widget-text-editor\" data-id=\"d70bae8\" data-element_type=\"widget\" data-e-type=\"widget\" data-widget_type=\"text-editor.default\">\n\t\t\t\t<div class=\"elementor-widget-container\">\n\t\t\t\t\t\t\t\t\t<div class=\"azn-sources\"><h2>Sources<\/h2><ol><li><a href=\"https:\/\/balady.gov.sa\/ar\/about-balady\/news\/%D9%88%D8%B2%D8%A7%D8%B1%D8%A9-%D8%A7%D9%84%D8%A8%D9%84%D8%AF%D9%8A%D8%A7%D8%AA-%D9%88%D8%A7%D9%84%D8%A5%D8%B3%D9%83%D8%A7%D9%86-%D8%AA%D8%B5%D8%AF%D8%B1-%D8%A3%D9%83%D8%AB%D8%B1-%D9%85%D9%86-80-%D8%A3%D9%84%D9%81-%D8%B1%D8%AE%D8%B5%D8%A9-%D8%A5%D9%86%D8%B4%D8%A7%D8%A6%D9%8A%D8%A9-%D9%81%D9%8A-%D9%85%D8%AE%D8%AA%D9%84%D9%81-%D9%85%D9%86%D8%A7%D8%B7%D9%82-%D8%A7%D9%84%D9%85%D9%85%D9%84%D9%83%D8%A9\" rel=\"nofollow noopener\" target=\"_blank\">Ministry of Municipalities and Housing issues more than 80,000 construction permits across the Kingdom in 9 months<\/a> (Arabic), Balady platform, Ministry of Municipalities and Housing, 16 November 2026<\/li><\/ol><\/div>\t\t\t\t\t\t\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t","protected":false},"excerpt":{"rendered":"<p>Saudi Arabia issued 80,775 construction permits from January to September 2026. What it means for fire system design and Civil Defense approval on new projects.<\/p>\n","protected":false},"author":0,"featured_media":35003,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"_acf_changed":false,"footnotes":""},"categories":[258],"tags":[],"azeidk_region":[223],"class_list":["post-35014","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-news"],"acf":[],"_links":{"self":[{"href":"https:\/\/azeidkgroup.com\/en\/wp-json\/wp\/v2\/posts\/35014","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/azeidkgroup.com\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/azeidkgroup.com\/en\/wp-json\/wp\/v2\/types\/post"}],"replies":[{"embeddable":true,"href":"https:\/\/azeidkgroup.com\/en\/wp-json\/wp\/v2\/comments?post=35014"}],"version-history":[{"count":1,"href":"https:\/\/azeidkgroup.com\/en\/wp-json\/wp\/v2\/posts\/35014\/revisions"}],"predecessor-version":[{"id":35016,"href":"https:\/\/azeidkgroup.com\/en\/wp-json\/wp\/v2\/posts\/35014\/revisions\/35016"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/azeidkgroup.com\/en\/wp-json\/wp\/v2\/media\/35003"}],"wp:attachment":[{"href":"https:\/\/azeidkgroup.com\/en\/wp-json\/wp\/v2\/media?parent=35014"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/azeidkgroup.com\/en\/wp-json\/wp\/v2\/categories?post=35014"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/azeidkgroup.com\/en\/wp-json\/wp\/v2\/tags?post=35014"},{"taxonomy":"azeidk_region","embeddable":true,"href":"https:\/\/azeidkgroup.com\/en\/wp-json\/wp\/v2\/azeidk_region?post=35014"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}