{"id":30016,"date":"2026-11-27T12:20:29","date_gmt":"2026-11-27T09:20:29","guid":{"rendered":"https:\/\/azeidkgroup.com\/sa\/media-center\/"},"modified":"2026-11-27T12:20:30","modified_gmt":"2026-11-27T09:20:30","slug":"elv-risers-containment-telecom-rooms-construction","status":"publish","type":"post","link":"https:\/\/azeidkgroup.com\/en\/sa\/media-center\/elv-risers-containment-telecom-rooms-construction\/","title":{"rendered":"Preparing a Building for Low Current Systems During Construction: Conduits, Trays, Risers and Telecom Rooms"},"content":{"rendered":"\t\t<div data-elementor-type=\"wp-post\" data-elementor-id=\"30016\" class=\"elementor elementor-30016 elementor-30015 elementor-bc-flex-widget\" data-elementor-post-type=\"post\">\n\t\t\t\t<div class=\"elementor-element elementor-element-07b0335 e-con-full az-el-article e-flex e-con e-parent\" data-id=\"07b0335\" data-element_type=\"container\" data-e-type=\"container\">\n\t\t\t\t<div class=\"elementor-element elementor-element-8338438 elementor-widget elementor-widget-text-editor\" data-id=\"8338438\" data-element_type=\"widget\" data-e-type=\"widget\" data-widget_type=\"text-editor.default\">\n\t\t\t\t<div class=\"elementor-widget-container\">\n\t\t\t\t\t\t\t\t\t<p class=\"az-intro\"><strong>Low current containment<\/strong> is the part nobody sees after finishing, which is why it is the hardest to fix. Cameras, switches and access control devices can be changed in a day; embedded conduits, trays above false ceilings, risers between floors and telecom rooms are fixed once during construction. A building meant to be smart starts here, before any device is chosen. This article explains what the owner and main contractor should reserve for low current systems before casting and finishing.<\/p>\n<p>AZEIDK prepares <a href=\"\/en\/sa\/services\/shop-drawings-coordination\/\">shop drawings and coordination<\/a> for <a href=\"\/en\/sa\/solutions\/low-current-systems\/\">low current systems<\/a> with electrical and structural works, so routes are ready before finishing.<\/p>\t\t\t\t\t\t\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t\t\t<div class=\"elementor-element elementor-element-396aa33 elementor-widget elementor-widget-text-editor\" data-id=\"396aa33\" data-element_type=\"widget\" data-e-type=\"widget\" data-widget_type=\"text-editor.default\">\n\t\t\t\t<div class=\"elementor-widget-container\">\n\t\t\t\t\t\t\t\t\t<div class=\"az-keybox\"><h2>Key points<\/h2><ul><li>A main telecom room plus floor cabinets or rooms so no permanent copper link exceeds 90 m.<\/li><li>A dedicated low current riser between floors, separate from the power riser.<\/li><li>Dedicated trays above false ceilings, with separation from power cables.<\/li><li>Spare empty conduits with draw wire for future extensions.<\/li><li>Power, cooling and earthing for telecom rooms planned in the design, not after.<\/li><\/ul><\/div>\t\t\t\t\t\t\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t\t\t<div class=\"elementor-element elementor-element-8548125 elementor-widget elementor-widget-text-editor\" data-id=\"8548125\" data-element_type=\"widget\" data-e-type=\"widget\" data-widget_type=\"text-editor.default\">\n\t\t\t\t<div class=\"elementor-widget-container\">\n\t\t\t\t\t\t\t\t\t<h2>What to reserve during construction<\/h2>\n<div class=\"az-table-wrap\"><table><thead><tr><th>Item<\/th><th>When it is fixed<\/th><th>If it is forgotten<\/th><\/tr><\/thead><tbody>\n<tr><td>Main telecom room<\/td><td>Architectural design<\/td><td>A storeroom with no cooling or earthing is used and equipment overheats<\/td><\/tr>\n<tr><td>Riser and slab openings<\/td><td>Before slabs are cast<\/td><td>Core drilling, or cables pulled through the power riser<\/td><\/tr>\n<tr><td>Conduits in walls<\/td><td>Before plastering<\/td><td>Surface trunking or chasing finished walls<\/td><\/tr>\n<tr><td>Trays above false ceilings<\/td><td>Before ceilings are installed<\/td><td>Cables lying on ceiling tiles or tied to other services<\/td><\/tr>\n<tr><td>Outdoor camera and reader points<\/td><td>Before facade and boundary wall works<\/td><td>Exposed cabling on the facade and poor camera positions<\/td><\/tr>\n<tr><td>Power and cooling for telecom rooms<\/td><td>Electrical and HVAC design<\/td><td>No dedicated circuit and equipment running hot<\/td><\/tr>\n<\/tbody><\/table><\/div>\t\t\t\t\t\t\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t\t\t<div class=\"elementor-element elementor-element-bcc1dc3 elementor-widget elementor-widget-text-editor\" data-id=\"bcc1dc3\" data-element_type=\"widget\" data-e-type=\"widget\" data-widget_type=\"text-editor.default\">\n\t\t\t\t<div class=\"elementor-widget-container\">\n\t\t\t\t\t\t\t\t\t<h2>Telecom rooms and floor cabinets<\/h2>\n<p>Copper network cabling has a practical limit: 90 m for the permanent link from patch panel to outlet and 100 m for the full channel with patch cords under ANSI\/TIA-568. Large or spread-out buildings therefore use floor cabinets linked to the main room by fibre, as covered in <a href=\"\/en\/sa\/media-center\/fiber-optic-backbone-buildings\/\">fibre backbone in buildings<\/a>. Each room needs space for cabinets and a maintenance aisle, a dedicated circuit, cooling, an earth point and, where needed, room for a UPS. See <a href=\"\/en\/sa\/media-center\/server-room-network-room-preparation\/\">server and network room preparation<\/a>.<\/p>\t\t\t\t\t\t\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t\t\t<div class=\"elementor-element elementor-element-52be3da elementor-widget elementor-widget-text-editor\" data-id=\"52be3da\" data-element_type=\"widget\" data-e-type=\"widget\" data-widget_type=\"text-editor.default\">\n\t\t\t\t<div class=\"elementor-widget-container\">\n\t\t\t\t\t\t\t\t\t<h2>Risers, trays and separation from power<\/h2>\n<p>A dedicated low current riser is preferred, or at least a separate tray inside a shared riser with spacing from power cables to limit interference. Above false ceilings, dedicated cable trays such as the wire mesh trays in <a href=\"\/en\/sa\/media-center\/wire-mesh-cable-tray-legrand-cablofil\/\">Legrand Cablofil wire mesh tray<\/a> are used, sized with spare capacity. Cable penetrations through floors and fire-rated walls must be sealed with approved firestop materials after cabling.<\/p>\t\t\t\t\t\t\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t\t\t<div class=\"elementor-element elementor-element-fe2b15c elementor-widget elementor-widget-text-editor\" data-id=\"fe2b15c\" data-element_type=\"widget\" data-e-type=\"widget\" data-widget_type=\"text-editor.default\">\n\t\t\t\t<div class=\"elementor-widget-container\">\n\t\t\t\t\t\t\t\t\t<h2>A smart building starts with pathways<\/h2>\n<p>Smart building systems, from lighting and HVAC control to cameras, access and parking, all need routes, cables and data points in defined places. A coordination drawing combining low current with electrical, HVAC and ceilings is prepared before installation, as explained in <a href=\"\/en\/sa\/media-center\/elv-shop-drawings-cctv-network-access-control\/\">ELV shop drawings<\/a>. For how the systems integrate, see <a href=\"\/en\/sa\/media-center\/smart-buildings-low-current-integration\/\">smart buildings and low current integration<\/a>.<\/p>\t\t\t\t\t\t\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t\t\t<div class=\"elementor-element elementor-element-c007971 elementor-widget elementor-widget-text-editor\" data-id=\"c007971\" data-element_type=\"widget\" data-e-type=\"widget\" data-widget_type=\"text-editor.default\">\n\t\t\t\t<div class=\"elementor-widget-container\">\n\t\t\t\t\t\t\t\t\t<h2>Repeated site mistakes<\/h2>\n<ul><li>A telecom room under toilets or next to water tanks.<\/li><li>Small conduits with no room after new points are added.<\/li><li>Low current and power cables in the same conduit.<\/li><li>Spare conduits left without a draw wire.<\/li><li>Camera points on the boundary wall and gate forgotten before external works.<\/li><\/ul>\t\t\t\t\t\t\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t\t\t<div class=\"elementor-element elementor-element-e45d551 elementor-widget elementor-widget-text-editor\" data-id=\"e45d551\" data-element_type=\"widget\" data-e-type=\"widget\" data-widget_type=\"text-editor.default\">\n\t\t\t\t<div class=\"elementor-widget-container\">\n\t\t\t\t\t\t\t\t\t<div class=\"az-faq\"><h2>FAQ<\/h2>\n<details class=\"az-faq__item\"><summary><h3>When should the low current contractor join the project?<\/h3><\/summary><p>Ideally at design stage, or at least before casting, so openings and conduits are reserved. Joining at finishing usually means surface cabling or breaking finishes.<\/p><\/details>\n<details class=\"az-faq__item\"><summary><h3>Does Wi-Fi replace wired data points?<\/h3><\/summary><p>No. Access points themselves, cameras and readers need cable; Wi-Fi serves mobile devices only.<\/p><\/details>\n<details class=\"az-faq__item\"><summary><h3>How many spare conduits should be left?<\/h3><\/summary><p>The designer decides based on building size and expected growth; the rule of thumb is at least one empty conduit on each main route.<\/p><\/details>\n<\/div>\t\t\t\t\t\t\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t\t\t<div class=\"elementor-element elementor-element-48a3004 elementor-widget elementor-widget-text-editor\" data-id=\"48a3004\" data-element_type=\"widget\" data-e-type=\"widget\" data-widget_type=\"text-editor.default\">\n\t\t\t\t<div class=\"elementor-widget-container\">\n\t\t\t\t\t\t\t\t\t<p class=\"az-cta\"><strong>Is your project under construction?<\/strong> AZEIDK can review low current routes and telecom rooms before casting and finishing. <a href=\"\/en\/sa\/contact\/\">Contact AZEIDK<\/a><\/p>\t\t\t\t\t\t\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t\t\t<div class=\"elementor-element elementor-element-f03041f elementor-widget elementor-widget-text-editor\" data-id=\"f03041f\" data-element_type=\"widget\" data-e-type=\"widget\" data-widget_type=\"text-editor.default\">\n\t\t\t\t<div class=\"elementor-widget-container\">\n\t\t\t\t\t\t\t\t\t<div class=\"az-source\"><strong>References:<\/strong> ANSI\/TIA-568 (cable lengths), ANSI\/TIA-569 (telecommunications pathways and spaces).<\/div>\t\t\t\t\t\t\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t","protected":false},"excerpt":{"rendered":"<p>What owners and contractors should reserve for low current systems before casting and finishing: telecom rooms, floor cabinets, risers, trays and spare conduits.<\/p>\n","protected":false},"author":0,"featured_media":29952,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"_acf_changed":false,"footnotes":""},"categories":[221,323,322],"tags":[],"azeidk_region":[223],"class_list":["post-30016","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-azeidk-articles","category-systems-guides-en","category-systems-guides-ar"],"acf":[],"_links":{"self":[{"href":"https:\/\/azeidkgroup.com\/en\/wp-json\/wp\/v2\/posts\/30016","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/azeidkgroup.com\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/azeidkgroup.com\/en\/wp-json\/wp\/v2\/types\/post"}],"replies":[{"embeddable":true,"href":"https:\/\/azeidkgroup.com\/en\/wp-json\/wp\/v2\/comments?post=30016"}],"version-history":[{"count":0,"href":"https:\/\/azeidkgroup.com\/en\/wp-json\/wp\/v2\/posts\/30016\/revisions"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/azeidkgroup.com\/en\/wp-json\/wp\/v2\/media\/29952"}],"wp:attachment":[{"href":"https:\/\/azeidkgroup.com\/en\/wp-json\/wp\/v2\/media?parent=30016"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/azeidkgroup.com\/en\/wp-json\/wp\/v2\/categories?post=30016"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/azeidkgroup.com\/en\/wp-json\/wp\/v2\/tags?post=30016"},{"taxonomy":"azeidk_region","embeddable":true,"href":"https:\/\/azeidkgroup.com\/en\/wp-json\/wp\/v2\/azeidk_region?post=30016"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}