{"id":29968,"date":"2026-11-27T12:10:36","date_gmt":"2026-11-27T09:10:36","guid":{"rendered":"https:\/\/azeidkgroup.com\/sa\/media-center\/"},"modified":"2026-11-27T12:10:37","modified_gmt":"2026-11-27T09:10:37","slug":"elv-handover-documents-ip-list-passwords","status":"publish","type":"post","link":"https:\/\/azeidkgroup.com\/en\/sa\/media-center\/elv-handover-documents-ip-list-passwords\/","title":{"rendered":"Low Current Systems Handover Documents: As-Built Drawings, IP Address Table, Passwords and Test Reports"},"content":{"rendered":"\t\t<div data-elementor-type=\"wp-post\" data-elementor-id=\"29968\" class=\"elementor elementor-29968 elementor-29967 elementor-bc-flex-widget\" data-elementor-post-type=\"post\">\n\t\t\t\t<div class=\"elementor-element elementor-element-1fa4fb2 e-con-full az-el-article e-flex e-con e-parent\" data-id=\"1fa4fb2\" data-element_type=\"container\" data-e-type=\"container\">\n\t\t\t\t<div class=\"elementor-element elementor-element-ab09178 elementor-widget elementor-widget-text-editor\" data-id=\"ab09178\" data-element_type=\"widget\" data-e-type=\"widget\" data-widget_type=\"text-editor.default\">\n\t\t\t\t<div class=\"elementor-widget-container\">\n\t\t\t\t\t\t\t\t\t<p class=\"az-intro\"><strong>Low current systems handover<\/strong> does not end when the cameras record and the doors open with a card. The owner is really taking over a network of devices, each with an IP address, an admin account, a password and saved settings. If that information is not handed over in an organised file, every later repair or extension depends on the contractor who installed the system. This article explains what the handover file for CCTV, networks, access control, PA and intercom should contain, and how an owner can check it before signing.<\/p>\n<p>AZEIDK delivers <a href=\"\/en\/sa\/solutions\/low-current-systems\/\">low current systems<\/a> from design to handover and offers <a href=\"\/en\/sa\/services\/documentation-final-handover\/\">documentation and final handover<\/a> to collect drawings, test results and manuals in one file.<\/p>\t\t\t\t\t\t\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t\t\t<div class=\"elementor-element elementor-element-cf2e277 elementor-widget elementor-widget-text-editor\" data-id=\"cf2e277\" data-element_type=\"widget\" data-e-type=\"widget\" data-widget_type=\"text-editor.default\">\n\t\t\t\t<div class=\"elementor-widget-container\">\n\t\t\t\t\t\t\t\t\t<div class=\"az-keybox\"><h2>Key points<\/h2><ul><li>The handover file has four parts: as-built drawings, device and address tables, configuration backups and test results.<\/li><li>Passwords go to a named person in a sealed envelope or protected file, never inside the general file.<\/li><li>The IP address table links every device to its location, switch port and cable number on the patch panel.<\/li><li>Temporary contractor accounts are deleted or disabled on handover day, and an admin account is created for the owner.<\/li><li>Fire systems have their own handover documents; this file covers low current systems.<\/li><\/ul><\/div>\t\t\t\t\t\t\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t\t\t<div class=\"elementor-element elementor-element-81029a7 elementor-widget elementor-widget-text-editor\" data-id=\"81029a7\" data-element_type=\"widget\" data-e-type=\"widget\" data-widget_type=\"text-editor.default\">\n\t\t\t\t<div class=\"elementor-widget-container\">\n\t\t\t\t\t\t\t\t\t<h2>Why low current handover is different<\/h2>\n<p>For fire systems the owner receives drawings, test results and manuals, as covered in <a href=\"\/en\/sa\/media-center\/fire-systems-handover-documents-as-built-om\/\">fire systems handover documents<\/a>. Low current systems add a layer that never appears on a drawing: software configuration. The recorder holds the recording schedule, retention and user rights; the switch holds VLANs and PoE settings; the access control panel holds the card database and time schedules. If these settings are lost, or the owner does not know one device password, the device may have to be factory reset and programmed again.<\/p>\t\t\t\t\t\t\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t\t\t<div class=\"elementor-element elementor-element-aa52afa elementor-widget elementor-widget-text-editor\" data-id=\"aa52afa\" data-element_type=\"widget\" data-e-type=\"widget\" data-widget_type=\"text-editor.default\">\n\t\t\t\t<div class=\"elementor-widget-container\">\n\t\t\t\t\t\t\t\t\t<h2>What the handover file contains<\/h2>\n<div class=\"az-table-wrap\"><table><thead><tr><th>Part<\/th><th>Content<\/th><th>Reviewed by<\/th><\/tr><\/thead><tbody>\n<tr><td>As-built drawings<\/td><td>Actual positions of cameras, readers, speakers and data points, cable routes, telecom rooms and risers<\/td><td>Consultant or owner&#8217;s engineer<\/td><\/tr>\n<tr><td>Device schedule<\/td><td>Model, serial number, firmware version and location of every device<\/td><td>IT or security lead<\/td><\/tr>\n<tr><td>IP address table<\/td><td>Address, subnet, gateway, VLAN, switch port and cable number for each device<\/td><td>Network administrator<\/td><\/tr>\n<tr><td>Cable schedule and labels<\/td><td>Each cable number at both ends and on the patch panel, with its test result<\/td><td>Network administrator<\/td><\/tr>\n<tr><td>Configuration backups<\/td><td>Backup files from recorders, switches, access control panels and the PBX<\/td><td>IT team<\/td><\/tr>\n<tr><td>Test results<\/td><td>Reports for cameras, recording, doors, fire alarm door release and PA intelligibility<\/td><td>Consultant and owner<\/td><\/tr>\n<tr><td>Manuals and warranties<\/td><td>Manufacturer manuals, warranty certificates and a proposed maintenance schedule<\/td><td>Facility management<\/td><\/tr>\n<\/tbody><\/table><\/div>\t\t\t\t\t\t\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t\t\t<div class=\"elementor-element elementor-element-8295c31 elementor-widget elementor-widget-text-editor\" data-id=\"8295c31\" data-element_type=\"widget\" data-e-type=\"widget\" data-widget_type=\"text-editor.default\">\n\t\t\t\t<div class=\"elementor-widget-container\">\n\t\t\t\t\t\t\t\t\t<h2>The IP address table<\/h2>\n<p>A good table answers one question fast: if camera 27 stops, where is it, which switch and port feed it, and what is its address? Each row holds the device name as shown in the VMS, its floor and room, IP address, switch and port, and the cable number matching the patch panel label. It is handed over in an editable format, not just a PDF, because the owner will add to it at every extension. Where the network is split for cameras, doors and phones as described in <a href=\"\/en\/sa\/media-center\/elv-network-vlan-design\/\">ELV network VLAN design<\/a>, the VLAN of each device is listed.<\/p>\t\t\t\t\t\t\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t\t\t<div class=\"elementor-element elementor-element-83880ba elementor-widget elementor-widget-text-editor\" data-id=\"83880ba\" data-element_type=\"widget\" data-e-type=\"widget\" data-widget_type=\"text-editor.default\">\n\t\t\t\t<div class=\"elementor-widget-container\">\n\t\t\t\t\t\t\t\t\t<h2>Passwords and accounts<\/h2>\n<ul><li>Every recorder, controller and managed switch has at least one admin account in the owner&#8217;s name.<\/li><li>Temporary technician accounts are deleted or disabled, and any password used during installation is changed.<\/li><li>Passwords are not written in the address table or the printed manual; they go to a person the owner names in writing.<\/li><li>Cloud accounts for mobile viewing are registered with a company email, not a technician&#8217;s.<\/li><\/ul>\n<p>These steps reduce the risks covered in <a href=\"\/en\/sa\/media-center\/cctv-hacking-protection\/\">CCTV hacking protection<\/a> and stop the contractor keeping access after the contract ends.<\/p>\t\t\t\t\t\t\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t\t\t<div class=\"elementor-element elementor-element-ec012dc elementor-widget elementor-widget-text-editor\" data-id=\"ec012dc\" data-element_type=\"widget\" data-e-type=\"widget\" data-widget_type=\"text-editor.default\">\n\t\t\t\t<div class=\"elementor-widget-container\">\n\t\t\t\t\t\t\t\t\t<h2>How the owner checks the file before signing<\/h2>\n<p>A practical sample is enough: pick three cameras, two doors and one data point and trace them from drawing to table to site. If the sample matches, the file is usually sound. Then log in with the owner account on the recorder and the access controller, and confirm the backup files open. Open items go on the <a href=\"\/en\/sa\/media-center\/fire-security-snag-list-handover-saudi\/\">pre-handover snag list<\/a> with a closing date for each.<\/p>\t\t\t\t\t\t\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t\t\t<div class=\"elementor-element elementor-element-0c9d048 elementor-widget elementor-widget-text-editor\" data-id=\"0c9d048\" data-element_type=\"widget\" data-e-type=\"widget\" data-widget_type=\"text-editor.default\">\n\t\t\t\t<div class=\"elementor-widget-container\">\n\t\t\t\t\t\t\t\t\t<h2>Common mistakes in handover files<\/h2>\n<ul><li>Design drawings handed over instead of as-built drawings.<\/li><li>Address table missing devices added through variation orders.<\/li><li>Patch panel labels that do not match the labels at the device.<\/li><li>A configuration backup taken before the last change made during testing.<\/li><li>The viewing app registered to a technician&#8217;s personal account.<\/li><\/ul>\t\t\t\t\t\t\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t\t\t<div class=\"elementor-element elementor-element-bedcacb elementor-widget elementor-widget-text-editor\" data-id=\"bedcacb\" data-element_type=\"widget\" data-e-type=\"widget\" data-widget_type=\"text-editor.default\">\n\t\t\t\t<div class=\"elementor-widget-container\">\n\t\t\t\t\t\t\t\t\t<div class=\"az-faq\"><h2>FAQ<\/h2>\n<details class=\"az-faq__item\"><summary><h3>Can the owner ask for every device password?<\/h3><\/summary><p>Yes. The devices belong to the facility after handover, and this should be a clear clause in the supply and installation contract.<\/p><\/details>\n<details class=\"az-faq__item\"><summary><h3>When is the final configuration backup taken?<\/h3><\/summary><p>After acceptance tests and their corrections. The backup is dated so the owner knows it is the latest.<\/p><\/details>\n<details class=\"az-faq__item\"><summary><h3>Is an electronic file enough?<\/h3><\/summary><p>It is easier to update. A short printed copy of the address and cable tables in the telecom room still helps the technician on site.<\/p><\/details>\n<details class=\"az-faq__item\"><summary><h3>Who updates the file after handover?<\/h3><\/summary><p>The maintenance provider. The <a href=\"\/en\/sa\/media-center\/low-current-maintenance-contract\/\">low current maintenance contract<\/a> should require every device or address change to be recorded.<\/p><\/details>\n<\/div>\t\t\t\t\t\t\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t\t\t<div class=\"elementor-element elementor-element-4d7ca40 elementor-widget elementor-widget-text-editor\" data-id=\"4d7ca40\" data-element_type=\"widget\" data-e-type=\"widget\" data-widget_type=\"text-editor.default\">\n\t\t\t\t<div class=\"elementor-widget-container\">\n\t\t\t\t\t\t\t\t\t<p class=\"az-cta\"><strong>Taking over a low current project soon?<\/strong> AZEIDK can review the handover file and check it against the site before you sign. <a href=\"\/en\/sa\/contact\/\">Contact AZEIDK<\/a><\/p>\t\t\t\t\t\t\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t\t\t<div class=\"elementor-element elementor-element-f2393ae elementor-widget elementor-widget-text-editor\" data-id=\"f2393ae\" data-element_type=\"widget\" data-e-type=\"widget\" data-widget_type=\"text-editor.default\">\n\t\t\t\t<div class=\"elementor-widget-container\">\n\t\t\t\t\t\t\t\t\t<div class=\"az-source\"><strong>References:<\/strong> TIA-606 (administration and labelling of telecommunications infrastructure), manufacturer manuals for recorders and access controllers.<\/div>\t\t\t\t\t\t\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t","protected":false},"excerpt":{"rendered":"<p>What an owner should receive at low current systems handover: as-built drawings, IP address table, configuration backups, passwords and test reports.<\/p>\n","protected":false},"author":0,"featured_media":29950,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"_acf_changed":false,"footnotes":""},"categories":[221,323,329,322],"tags":[],"azeidk_region":[223],"class_list":["post-29968","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-azeidk-articles","category-systems-guides-en","category-operation-maintenance-en","category-systems-guides-ar"],"acf":[],"_links":{"self":[{"href":"https:\/\/azeidkgroup.com\/en\/wp-json\/wp\/v2\/posts\/29968","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/azeidkgroup.com\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/azeidkgroup.com\/en\/wp-json\/wp\/v2\/types\/post"}],"replies":[{"embeddable":true,"href":"https:\/\/azeidkgroup.com\/en\/wp-json\/wp\/v2\/comments?post=29968"}],"version-history":[{"count":0,"href":"https:\/\/azeidkgroup.com\/en\/wp-json\/wp\/v2\/posts\/29968\/revisions"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/azeidkgroup.com\/en\/wp-json\/wp\/v2\/media\/29950"}],"wp:attachment":[{"href":"https:\/\/azeidkgroup.com\/en\/wp-json\/wp\/v2\/media?parent=29968"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/azeidkgroup.com\/en\/wp-json\/wp\/v2\/categories?post=29968"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/azeidkgroup.com\/en\/wp-json\/wp\/v2\/tags?post=29968"},{"taxonomy":"azeidk_region","embeddable":true,"href":"https:\/\/azeidkgroup.com\/en\/wp-json\/wp\/v2\/azeidk_region?post=29968"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}