{"id":28602,"date":"2026-11-21T16:04:27","date_gmt":"2026-11-21T13:04:27","guid":{"rendered":"https:\/\/azeidkgroup.com\/sa\/media-center\/"},"modified":"2026-11-21T16:04:28","modified_gmt":"2026-11-21T13:04:28","slug":"civil-defense-technical-affairs-plans-review","status":"publish","type":"post","link":"https:\/\/azeidkgroup.com\/en\/sa\/media-center\/civil-defense-technical-affairs-plans-review\/","title":{"rendered":"Civil Defense Technical Affairs: How Fire Safety Drawings Are Reviewed and Approved in Saudi Arabia"},"content":{"rendered":"\t\t<div data-elementor-type=\"wp-post\" data-elementor-id=\"28602\" class=\"elementor elementor-28602 elementor-28601 elementor-bc-flex-widget\" data-elementor-post-type=\"post\">\n\t\t\t\t<div class=\"elementor-element elementor-element-ed37dc2 e-con-full az-el-article e-flex e-con e-parent\" data-id=\"ed37dc2\" data-element_type=\"container\" data-e-type=\"container\">\n\t\t\t\t<div class=\"elementor-element elementor-element-a8da271 elementor-widget elementor-widget-text-editor\" data-id=\"a8da271\" data-element_type=\"widget\" data-e-type=\"widget\" data-widget_type=\"text-editor.default\">\n\t\t\t\t<div class=\"elementor-widget-container\">\n\t\t\t\t\t\t\t\t\t<p class=\"az-intro\">When owners and contractors search for <strong>civil defense technical affairs<\/strong>, they usually mean the technical side of Civil Defense work: reviewing fire safety drawings against the Saudi Fire Code SBC 801 and Civil Defense requirements before approval, then checking on site that what was built matches what was approved. This stage decides whether a project moves smoothly to licensing or comes back with comments that cost weeks.<\/p>\n<p>This guide covers what reviewers look at, what the drawing package should contain, the approval steps in order, and the most common reasons drawings are returned. AZEIDK provides <a href=\"\/en\/sa\/services\/drawings-specifications-review\/\">drawings and specifications review<\/a> and <a href=\"\/en\/sa\/services\/civil-defense-approval-support\/\">Civil Defense approval support<\/a> to prepare the file before submission.<\/p>\t\t\t\t\t\t\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t\t\t<div class=\"elementor-element elementor-element-cac4a3d elementor-widget elementor-widget-text-editor\" data-id=\"cac4a3d\" data-element_type=\"widget\" data-e-type=\"widget\" data-widget_type=\"text-editor.default\">\n\t\t\t\t<div class=\"elementor-widget-container\">\n\t\t\t\t\t\t\t\t\t<div class=\"az-keybox\"><h2>Key points<\/h2><ul><li>The technical review compares drawings with SBC 801, SBC 201 and the Civil Defense requirements for the activity.<\/li><li>A complete package includes architectural plans with egress, fire alarm and fire fighting drawings, hydraulic calculations and equipment datasheets.<\/li><li>Most comments come from missing calculations or drawings that do not match the specification, not from a wrong design concept.<\/li><li>An internal review before submission costs far less than changes after installation.<\/li><\/ul><\/div>\t\t\t\t\t\t\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t\t\t<div class=\"elementor-element elementor-element-460a0dc elementor-widget elementor-widget-text-editor\" data-id=\"460a0dc\" data-element_type=\"widget\" data-e-type=\"widget\" data-widget_type=\"text-editor.default\">\n\t\t\t\t<div class=\"elementor-widget-container\">\n\t\t\t\t\t\t\t\t\t<h2>What civil defense technical affairs means in practice<\/h2>\n<p>The technical question is whether the life safety systems suit the occupancy classification, floor area, height and occupant load. Work starts with occupancy classification under SBC 201, because it decides which systems are mandatory: sprinklers, fire alarm, voice evacuation, smoke control and standpipes.<\/p>\n<p>Then comes detailed checking: detector positions and spacing, sprinkler coverage and design density, fire pump and tank capacity, exit width, number and travel distance, and the location of hose cabinets and the fire department connection. All of this must appear on the drawings and in the attached calculations.<\/p>\t\t\t\t\t\t\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t\t\t<div class=\"elementor-element elementor-element-b216ad8 elementor-widget elementor-widget-text-editor\" data-id=\"b216ad8\" data-element_type=\"widget\" data-e-type=\"widget\" data-widget_type=\"text-editor.default\">\n\t\t\t\t<div class=\"elementor-widget-container\">\n\t\t\t\t\t\t\t\t\t<h2>What is checked on fire safety drawings<\/h2>\n<div class=\"az-table-wrap\"><table><thead><tr><th>Item<\/th><th>What is looked at<\/th><\/tr><\/thead><tbody>\n<tr><td>Occupancy classification<\/td><td>Activity, areas and storeys, which set the required systems<\/td><\/tr>\n<tr><td>Means of egress<\/td><td>Number and width of exits, travel distance, emergency lighting and exit signs<\/td><\/tr>\n<tr><td>Fire alarm<\/td><td>Panel type, detector, call point and sounder layout, zones or loops<\/td><\/tr>\n<tr><td>Fire fighting<\/td><td>Sprinkler network, standpipes, hose cabinets and hydraulic calculations<\/td><\/tr>\n<tr><td>Pump room and tank<\/td><td>Pump flow and pressure, diesel and jockey pumps, fire water tank volume<\/td><\/tr>\n<tr><td>Special systems<\/td><td>Gas suppression for electrical and server rooms, commercial kitchen systems<\/td><\/tr>\n<tr><td>Fire apparatus access<\/td><td>Fire lanes, outdoor hydrants and the fire department connection<\/td><\/tr>\n<\/tbody><\/table><\/div>\n<p>Symbols should be consistent and explained in a legend. See our guide to <a href=\"\/en\/sa\/media-center\/fire-fighting-drawing-symbols\/\">fire fighting drawing symbols<\/a>.<\/p>\t\t\t\t\t\t\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t\t\t<div class=\"elementor-element elementor-element-d107e88 elementor-widget elementor-widget-text-editor\" data-id=\"d107e88\" data-element_type=\"widget\" data-e-type=\"widget\" data-widget_type=\"text-editor.default\">\n\t\t\t\t<div class=\"elementor-widget-container\">\n\t\t\t\t\t\t\t\t\t<h2>The drawing package before submission<\/h2>\n<ul>\n<li><strong>Architectural plans<\/strong> for each floor showing egress routes, exits and fire-rated doors.<\/li>\n<li><strong>Fire alarm drawings<\/strong> with the riser diagram, device schedule and main panel location.<\/li>\n<li><strong>Fire fighting drawings<\/strong> for sprinklers, hose cabinets and standpipes, with the water riser diagram.<\/li>\n<li><strong>Hydraulic calculations<\/strong> proving that the pump and network deliver the required flow and pressure at the most remote area.<\/li>\n<li><strong>Pump room details<\/strong>, the fire water tank and controllers.<\/li>\n<li><strong>Specifications and datasheets<\/strong> that match the drawings exactly in model, capacity and listing.<\/li>\n<\/ul>\t\t\t\t\t\t\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t\t\t<div class=\"elementor-element elementor-element-1d87961 elementor-widget elementor-widget-text-editor\" data-id=\"1d87961\" data-element_type=\"widget\" data-e-type=\"widget\" data-widget_type=\"text-editor.default\">\n\t\t\t\t<div class=\"elementor-widget-container\">\n\t\t\t\t\t\t\t\t\t<h2>Approval steps in order<\/h2>\n<ol>\n<li><strong>Confirm the occupancy classification<\/strong> and mandatory systems before detailed design.<\/li>\n<li><strong>Design through an approved engineering office<\/strong> that prepares and stamps the drawings and calculations.<\/li>\n<li><strong>Review internally<\/strong> against SBC 801 and the activity requirements, and check that specifications match the drawings.<\/li>\n<li><strong>Submit<\/strong> through the channel set by the competent authority and follow up on comments.<\/li>\n<li><strong>Close comments<\/strong> by revising drawings and calculations together, then resubmit.<\/li>\n<li><strong>Install as approved<\/strong>; any site change must be reflected in the drawings before inspection.<\/li>\n<li><strong>Inspection and licensing<\/strong> after testing and commissioning, then the required documents through the <a href=\"\/en\/sa\/media-center\/salamah-certificate-civil-defense-guide\/\">Salamah platform<\/a>.<\/li>\n<\/ol>\n<p>At licensing the facility may need the technical report. AZEIDK handles the technical report through an approved engineering consultancy office and issues the safety equipment installation certificate itself. See the <a href=\"\/en\/sa\/media-center\/salamah-technical-report-civil-defense\/\">Salamah technical report guide<\/a>.<\/p>\t\t\t\t\t\t\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t\t\t<div class=\"elementor-element elementor-element-69e65e9 elementor-widget elementor-widget-text-editor\" data-id=\"69e65e9\" data-element_type=\"widget\" data-e-type=\"widget\" data-widget_type=\"text-editor.default\">\n\t\t\t\t<div class=\"elementor-widget-container\">\n\t\t\t\t\t\t\t\t\t<h2>Common reasons drawings are returned<\/h2>\n<ul>\n<li>Hydraulic calculations missing or not covering the most remote and highest area.<\/li>\n<li>Detector or sprinkler spacing that ignores beams, low ceilings and obstructions.<\/li>\n<li>Datasheets for a different model from the equipment schedule.<\/li>\n<li>No fire pump curve, or a curve that does not match the calculated duty point.<\/li>\n<li>Exits that no longer suit the occupant load after a change of use.<\/li>\n<li>Electrical or server rooms without suitable protection, or with a system but no agent quantity calculation.<\/li>\n<\/ul>\t\t\t\t\t\t\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t\t\t<div class=\"elementor-element elementor-element-c9c5938 elementor-widget elementor-widget-text-editor\" data-id=\"c9c5938\" data-element_type=\"widget\" data-e-type=\"widget\" data-widget_type=\"text-editor.default\">\n\t\t\t\t<div class=\"elementor-widget-container\">\n\t\t\t\t\t\t\t\t\t<h2>How AZEIDK supports civil defense technical affairs<\/h2>\n<p>AZEIDK reviews drawings and specifications, prepares <a href=\"\/en\/sa\/services\/engineering-design-calculations\/\">engineering design and calculations<\/a> for alarm and fire fighting systems where needed, and follows the approval requirements through <a href=\"\/en\/sa\/services\/civil-defense-approval-support\/\">Civil Defense approval support<\/a>. For the difference between code and Civil Defense requirements, read <a href=\"\/en\/sa\/media-center\/sbc-801-vs-sbc-201-vs-civil-defense-requirements\/\">SBC 801 vs SBC 201 vs Civil Defense requirements<\/a>.<\/p>\t\t\t\t\t\t\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t\t\t<div class=\"elementor-element elementor-element-0d37a7a elementor-widget elementor-widget-text-editor\" data-id=\"0d37a7a\" data-element_type=\"widget\" data-e-type=\"widget\" data-widget_type=\"text-editor.default\">\n\t\t\t\t<div class=\"elementor-widget-container\">\n\t\t\t\t\t\t\t\t\t<div class=\"az-faq\"><h2>Frequently asked questions<\/h2>\n<details class=\"az-faq__item\"><summary><h3>What does civil defense technical affairs refer to?<\/h3><\/summary><p>The technical side of Civil Defense work: reviewing life safety drawings and systems against the code and activity requirements before approval and after installation.<\/p><\/details>\n<details class=\"az-faq__item\"><summary><h3>Who submits fire drawings for approval?<\/h3><\/summary><p>An approved engineering office prepares and stamps them, and they are submitted through the channel set by the competent authority.<\/p><\/details>\n<details class=\"az-faq__item\"><summary><h3>What is the main reference for the review?<\/h3><\/summary><p>The Saudi Fire Code SBC 801 together with SBC 201, plus Civil Defense requirements for the activity.<\/p><\/details>\n<details class=\"az-faq__item\"><summary><h3>Are hydraulic calculations needed for every sprinkler project?<\/h3><\/summary><p>Yes. They prove the pump and network serve the most remote design area, and missing calculations are a frequent cause of comments.<\/p><\/details>\n<details class=\"az-faq__item\"><summary><h3>What if something changes on site after approval?<\/h3><\/summary><p>Update the drawings and calculations to match the installation before inspection, because inspection compares the site with the approved set.<\/p><\/details>\n<details class=\"az-faq__item\"><summary><h3>Can AZEIDK review drawings prepared by another office?<\/h3><\/summary><p>Yes, through the drawings and specifications review service, with comments sent before submission.<\/p><\/details>\n<\/div>\t\t\t\t\t\t\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t\t\t<div class=\"elementor-element elementor-element-0889910 elementor-widget elementor-widget-text-editor\" data-id=\"0889910\" data-element_type=\"widget\" data-e-type=\"widget\" data-widget_type=\"text-editor.default\">\n\t\t\t\t<div class=\"elementor-widget-container\">\n\t\t\t\t\t\t\t\t\t<p class=\"az-cta\"><strong>Drawings ready to submit?<\/strong> Send them to AZEIDK for a check against the code and your activity requirements before they reach the technical review. <a href=\"\/en\/sa\/contact\/\">Contact AZEIDK<\/a><\/p>\t\t\t\t\t\t\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t\t\t<div class=\"elementor-element elementor-element-bd47ced elementor-widget elementor-widget-text-editor\" data-id=\"bd47ced\" data-element_type=\"widget\" data-e-type=\"widget\" data-widget_type=\"text-editor.default\">\n\t\t\t\t<div class=\"elementor-widget-container\">\n\t\t\t\t\t\t\t\t\t<div class=\"az-source\"><strong>References:<\/strong> <a href=\"https:\/\/www.iccsafe.org\/?p=240998\" rel=\"noopener\" target=\"_blank\">Saudi Arabia and the International Codes<\/a> (International Code Council), <a href=\"https:\/\/elm.sa\/ar\/our-business\/digital-products\/Documents\/En\/Salamah%20EN.pdf\" rel=\"noopener\" target=\"_blank\">Salamah platform overview<\/a> (Elm)<\/div>\t\t\t\t\t\t\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t","protected":false},"excerpt":{"rendered":"<p>Civil defense technical affairs in Saudi Arabia: what reviewers check in fire alarm, fire fighting and egress drawings, the drawing package, and approval steps.<\/p>\n","protected":false},"author":0,"featured_media":28573,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"_acf_changed":false,"footnotes":""},"categories":[221,321,323,322],"tags":[],"azeidk_region":[223],"class_list":["post-28602","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-azeidk-articles","category-codes-certifications-en","category-systems-guides-en","category-systems-guides-ar"],"acf":[],"_links":{"self":[{"href":"https:\/\/azeidkgroup.com\/en\/wp-json\/wp\/v2\/posts\/28602","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/azeidkgroup.com\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/azeidkgroup.com\/en\/wp-json\/wp\/v2\/types\/post"}],"replies":[{"embeddable":true,"href":"https:\/\/azeidkgroup.com\/en\/wp-json\/wp\/v2\/comments?post=28602"}],"version-history":[{"count":0,"href":"https:\/\/azeidkgroup.com\/en\/wp-json\/wp\/v2\/posts\/28602\/revisions"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/azeidkgroup.com\/en\/wp-json\/wp\/v2\/media\/28573"}],"wp:attachment":[{"href":"https:\/\/azeidkgroup.com\/en\/wp-json\/wp\/v2\/media?parent=28602"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/azeidkgroup.com\/en\/wp-json\/wp\/v2\/categories?post=28602"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/azeidkgroup.com\/en\/wp-json\/wp\/v2\/tags?post=28602"},{"taxonomy":"azeidk_region","embeddable":true,"href":"https:\/\/azeidkgroup.com\/en\/wp-json\/wp\/v2\/azeidk_region?post=28602"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}