{"id":28024,"date":"2026-11-20T16:39:27","date_gmt":"2026-11-20T13:39:27","guid":{"rendered":"https:\/\/azeidkgroup.com\/sa\/media-center\/"},"modified":"2026-11-20T16:39:40","modified_gmt":"2026-11-20T13:39:40","slug":"warehouse-mezzanine-fire-protection","status":"publish","type":"post","link":"https:\/\/azeidkgroup.com\/en\/sa\/media-center\/warehouse-mezzanine-fire-protection\/","title":{"rendered":"Warehouse Mezzanine Fire Protection: Sprinklers Below the Deck, Detectors and Exits"},"content":{"rendered":"\t\t<div data-elementor-type=\"wp-post\" data-elementor-id=\"28024\" class=\"elementor elementor-28024 elementor-28023 elementor-bc-flex-widget\" data-elementor-post-type=\"post\">\n\t\t\t\t<div class=\"elementor-element elementor-element-9f4d473 e-con-full az-el-article e-flex e-con e-parent\" data-id=\"9f4d473\" data-element_type=\"container\" data-e-type=\"container\">\n\t\t\t\t<div class=\"elementor-element elementor-element-96b5d70 elementor-widget elementor-widget-text-editor\" data-id=\"96b5d70\" data-element_type=\"widget\" data-e-type=\"widget\" data-widget_type=\"text-editor.default\">\n\t\t\t\t<div class=\"elementor-widget-container\">\n\t\t\t\t\t\t\t\t\t<p class=\"az-intro\">A <strong>warehouse mezzanine<\/strong> is a quick way to add storage, offices or packing rooms without new construction. It also changes how the fire systems work: ceiling sprinklers cannot reach what sits below the deck, a beam detector path may be blocked, and people working on the mezzanine need safe exits. The mezzanine should therefore enter the fire protection design before it is installed, not after an inspector notices it.<\/p>\n<p>This guide covers what changes in <a href=\"\/en\/sa\/solutions\/fire-fighting-systems\/\">fire fighting systems<\/a> and <a href=\"\/en\/sa\/solutions\/fire-alarm-systems\/\">fire alarm systems<\/a> when a mezzanine is added, what the International Building Code and NFPA 13 say about it, and how AZEIDK handles projects in the <a href=\"\/en\/sa\/industries\/warehouses-logistics\/\">warehouses and logistics<\/a> sector.<\/p>\t\t\t\t\t\t\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t\t\t<div class=\"elementor-element elementor-element-ec2a13a elementor-widget elementor-widget-text-editor\" data-id=\"ec2a13a\" data-element_type=\"widget\" data-e-type=\"widget\" data-widget_type=\"text-editor.default\">\n\t\t\t\t<div class=\"elementor-widget-container\">\n\t\t\t\t\t\t\t\t\t<div class=\"az-keybox\"><h2>Key points<\/h2><ul><li>In the International Building Code (IBC), on which the Saudi Building Code SBC 201 is based, a mezzanine is an intermediate level between floor and ceiling, and its area is limited to a share of the room it sits in.<\/li><li>NFPA 13 requires sprinklers below fixed obstructions wider than 1.2 m (4 ft), and a mezzanine deck is the clearest example.<\/li><li>Open grating floors do not remove the need for sprinklers below in most cases.<\/li><li>Smoke and beam detectors need to be re-laid to cover the space above and below the mezzanine.<\/li><li>Exits and escape routes from the mezzanine follow SBC 201 and Civil Defense requirements.<\/li><\/ul><\/div>\t\t\t\t\t\t\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t\t\t<div class=\"elementor-element elementor-element-f560c61 elementor-widget elementor-widget-text-editor\" data-id=\"f560c61\" data-element_type=\"widget\" data-e-type=\"widget\" data-widget_type=\"text-editor.default\">\n\t\t\t\t<div class=\"elementor-widget-container\">\n\t\t\t\t\t\t\t\t\t<h2>What is a mezzanine in the code?<\/h2>\n<p>In its explanation of the IBC, the National Fire Sprinkler Association (NFSA) describes a mezzanine as an intermediate level or levels between the floor and ceiling of a story. It does not count as an additional story, but its area is included in the fire area. The basic allowance is one-third of the floor area of the room or space, which can rise to one-half under conditions that include automatic sprinklers, and a minimum clear height of 7 ft (about 2.1 m) applies.<\/p>\n<p>In Saudi Arabia, the binding references are SBC 201 and the fire code SBC 801, and their adopted text gives the final figures. A mezzanine that exceeds the allowed limits may be treated as a full story, with all the extra requirements that brings.<\/p>\t\t\t\t\t\t\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t\t\t<div class=\"elementor-element elementor-element-030c448 elementor-widget elementor-widget-text-editor\" data-id=\"030c448\" data-element_type=\"widget\" data-e-type=\"widget\" data-widget_type=\"text-editor.default\">\n\t\t\t\t<div class=\"elementor-widget-container\">\n\t\t\t\t\t\t\t\t\t<h2>Sprinklers under a warehouse mezzanine<\/h2>\n<p>A ceiling sprinkler is designed to cover a defined area below it without obstruction. When a mezzanine deck several metres wide sits underneath, it becomes the ceiling for everything below and shields stock or offices from the water. A technical article in Consulting-Specifying Engineer explains that NFPA 13 requires additional sprinklers below fixed obstructions wider than 4 ft (1.2 m), such as cable trays and large ducts, and a mezzanine follows the same logic.<\/p>\n<p>The design usually needs:<\/p>\n<ul><li>Sprinklers below the deck covering the area underneath, with a hazard classification that suits what is stored or done there.<\/li><li>A review of ceiling sprinklers above the mezzanine, since the distance between sprinkler and storage surface has changed.<\/li><li>A new hydraulic calculation, as water demand may rise and the existing pump or main may not cope.<\/li><li>A defined feed for the new branch, with a control valve and flow switch where zoning requires it.<\/li><\/ul>\t\t\t\t\t\t\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t\t\t<div class=\"elementor-element elementor-element-1ef0d54 elementor-widget elementor-widget-text-editor\" data-id=\"1ef0d54\" data-element_type=\"widget\" data-e-type=\"widget\" data-widget_type=\"text-editor.default\">\n\t\t\t\t<div class=\"elementor-widget-container\">\n\t\t\t\t\t\t\t\t\t<h2>What about open grating floors?<\/h2>\n<p>Some owners assume an open metal grating lets water through, so no sprinklers are needed below. In a technical discussion among designers on MeyerFire, several treated open grating as a full obstruction needing sprinklers designed for the height from floor to grating, while others suggested covering it permanently or using sprinklers with water shields beneath. The final decision rests with the designer under the adopted NFPA 13 edition, but the safe assumption is that the space below a grating should not be left unprotected.<\/p>\t\t\t\t\t\t\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t\t\t<div class=\"elementor-element elementor-element-fc8c56e elementor-widget elementor-widget-text-editor\" data-id=\"fc8c56e\" data-element_type=\"widget\" data-e-type=\"widget\" data-widget_type=\"text-editor.default\">\n\t\t\t\t<div class=\"elementor-widget-container\">\n\t\t\t\t\t\t\t\t\t<h2>Storage mezzanine or office mezzanine?<\/h2>\n<p>The use changes the design. A storage mezzanine carries goods, so the fire load rises and the storage height on top and the clearance to the roof affect the choice and density of ceiling sprinklers. An office or packing mezzanine carries people, so exits, emergency lighting and audible alarms come first, and it may need separation from the storage area depending on classification. The area under a mezzanine is often used for dispatch or packing, with cartons and plastic wrap, so it should not be treated as light hazard.<\/p>\t\t\t\t\t\t\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t\t\t<div class=\"elementor-element elementor-element-5afa183 elementor-widget elementor-widget-text-editor\" data-id=\"5afa183\" data-element_type=\"widget\" data-e-type=\"widget\" data-widget_type=\"text-editor.default\">\n\t\t\t\t<div class=\"elementor-widget-container\">\n\t\t\t\t\t\t\t\t\t<h2>Detectors above and below the mezzanine<\/h2>\n<p>A mezzanine splits the warehouse into two spaces for detection as well. Smoke produced below the deck can collect under it and reach ceiling detectors late, and a beam detector spanning two walls may pass above the mezzanine or be blocked once it is built. So:<\/p>\n<ul><li>Add smoke detectors below the mezzanine according to area and use.<\/li><li>Check the beam path and height so it does not cross obstructions or tall goods on the mezzanine.<\/li><li>Add sounders and beacons that can be heard and seen both above and below.<\/li><\/ul>\n<p>Detector selection for warehouses is covered in <a href=\"\/en\/sa\/media-center\/warehouse-smoke-detectors-beam-vs-point\/\">warehouse smoke detectors: beam or point<\/a>, and reflective beam detectors in <a href=\"\/en\/sa\/media-center\/context-plus-reflective-beam-detectors\/\">Context Plus beam detectors<\/a>.<\/p>\t\t\t\t\t\t\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t\t\t<div class=\"elementor-element elementor-element-333b8e9 elementor-widget elementor-widget-text-editor\" data-id=\"333b8e9\" data-element_type=\"widget\" data-e-type=\"widget\" data-widget_type=\"text-editor.default\">\n\t\t\t\t<div class=\"elementor-widget-container\">\n\t\t\t\t\t\t\t\t\t<h2>Exits and escape routes<\/h2>\n<p>People on a mezzanine need a safe way down in a fire. The number of stairs, travel distance and corridor widths follow SBC 201 and Civil Defense requirements based on area and occupant load, completed by emergency lighting and exit signs. General guidance is in our article on <a href=\"\/en\/sa\/media-center\/emergency-exits-requirements-saudi\/\">emergency exit requirements<\/a>.<\/p>\t\t\t\t\t\t\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t\t\t<div class=\"elementor-element elementor-element-305aee4 elementor-widget elementor-widget-text-editor\" data-id=\"305aee4\" data-element_type=\"widget\" data-e-type=\"widget\" data-widget_type=\"text-editor.default\">\n\t\t\t\t<div class=\"elementor-widget-container\">\n\t\t\t\t\t\t\t\t\t<h2>What changes when a mezzanine is added?<\/h2>\n<div class=\"az-table-wrap\"><table><thead><tr><th>System<\/th><th>What changes<\/th><th>What to review<\/th><\/tr><\/thead><tbody>\n<tr><td>Sprinklers<\/td><td>A new area below the deck that ceiling sprinklers cannot reach<\/td><td>Sprinklers below the mezzanine, hydraulic calculation, pump<\/td><\/tr>\n<tr><td>Detection and alarm<\/td><td>A new space below the deck and an obstruction for beam detectors<\/td><td>Extra detectors, beam path, sounders<\/td><\/tr>\n<tr><td>Evacuation<\/td><td>People at a raised level<\/td><td>Stairs, exits, emergency lighting<\/td><\/tr>\n<tr><td>Approval<\/td><td>A change to approved drawings<\/td><td>Updated drawings submitted to the authority<\/td><\/tr>\n<\/tbody><\/table><\/div>\t\t\t\t\t\t\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t\t\t<div class=\"elementor-element elementor-element-20c44a1 elementor-widget elementor-widget-text-editor\" data-id=\"20c44a1\" data-element_type=\"widget\" data-e-type=\"widget\" data-widget_type=\"text-editor.default\">\n\t\t\t\t<div class=\"elementor-widget-container\">\n\t\t\t\t\t\t\t\t\t<h2>Adding a mezzanine to an existing warehouse<\/h2>\n<p>Most mezzanines are added after the warehouse opens, often by the racking or steel supplier without involving the fire system designer. The safer route is to send the mezzanine drawings before fabrication for a <a href=\"\/en\/sa\/services\/drawings-specifications-review\/\">drawings and specifications review<\/a>, then prepare <a href=\"\/en\/sa\/services\/shop-drawings-coordination\/\">shop drawings and coordination<\/a> for sprinklers and alarms. We describe phased work in an operating building in <a href=\"\/en\/sa\/media-center\/sprinkler-system-retrofit-existing-building\/\">sprinkler retrofit in an existing building<\/a>.<\/p>\t\t\t\t\t\t\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t\t\t<div class=\"elementor-element elementor-element-d4255d2 elementor-widget elementor-widget-text-editor\" data-id=\"d4255d2\" data-element_type=\"widget\" data-e-type=\"widget\" data-widget_type=\"text-editor.default\">\n\t\t\t\t<div class=\"elementor-widget-container\">\n\t\t\t\t\t\t\t\t\t<h2>FAQ<\/h2>\n<div class=\"az-faq\"><details class=\"az-faq__item\"><summary><h3>Does a warehouse mezzanine need sprinklers underneath?<\/h3><\/summary><p>In most cases, yes. NFPA 13 requires sprinklers below fixed obstructions wider than 1.2 m, and a mezzanine deck is usually wider than that.<\/p><\/details><details class=\"az-faq__item\"><summary><h3>Does an open grating floor replace sprinklers under the mezzanine?<\/h3><\/summary><p>Usually not. Many designers treat open grating as a full obstruction, and the decision rests with the designer under the NFPA 13 edition adopted for the project.<\/p><\/details><details class=\"az-faq__item\"><summary><h3>What is the maximum mezzanine area?<\/h3><\/summary><p>In the IBC, on which SBC 201 is based, the basic limit is one-third of the space, rising to one-half under conditions that include sprinklers. Check the adopted SBC 201 text for the project.<\/p><\/details><details class=\"az-faq__item\"><summary><h3>Do Civil Defense drawings need updating after a mezzanine is installed?<\/h3><\/summary><p>Yes, it changes the building and its systems. Updating and submitting the drawings avoids inspection findings at licence renewal.<\/p><\/details><details class=\"az-faq__item\"><summary><h3>Is the existing pump enough after adding sprinklers under the mezzanine?<\/h3><\/summary><p>Only a hydraulic calculation can say. A new sprinkler area may raise water demand, so the calculation is redone and pump and main performance are checked.<\/p><\/details><details class=\"az-faq__item\"><summary><h3>Does AZEIDK carry out mezzanine fire works in an operating warehouse?<\/h3><\/summary><p>Yes. AZEIDK reviews the drawings, prepares the design and shop drawings, and installs sprinklers and alarms in phases that fit warehouse operations.<\/p><\/details><\/div>\t\t\t\t\t\t\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t\t\t<div class=\"elementor-element elementor-element-75b9753 elementor-widget elementor-widget-text-editor\" data-id=\"75b9753\" data-element_type=\"widget\" data-e-type=\"widget\" data-widget_type=\"text-editor.default\">\n\t\t\t\t<div class=\"elementor-widget-container\">\n\t\t\t\t\t\t\t\t\t<h2>Summary<\/h2>\n<p>A mezzanine adds space, and with it a new area that needs sprinklers, detectors and exits. Reviewing its design with the fire systems before fabrication avoids costly changes and inspection findings later.<\/p>\t\t\t\t\t\t\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t\t\t<div class=\"elementor-element elementor-element-cb5d821 elementor-widget elementor-widget-text-editor\" data-id=\"cb5d821\" data-element_type=\"widget\" data-e-type=\"widget\" data-widget_type=\"text-editor.default\">\n\t\t\t\t<div class=\"elementor-widget-container\">\n\t\t\t\t\t\t\t\t\t<p class=\"az-cta\"><strong>Planning a mezzanine in your warehouse?<\/strong> Send us the mezzanine drawings and current fire drawings, and we will review the sprinklers, detectors and exits you need. <a href=\"\/en\/sa\/contact\/\">Contact the AZEIDK team<\/a><\/p>\t\t\t\t\t\t\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t\t\t<div class=\"elementor-element elementor-element-2e87e47 elementor-widget elementor-widget-text-editor\" data-id=\"2e87e47\" data-element_type=\"widget\" data-e-type=\"widget\" data-widget_type=\"text-editor.default\">\n\t\t\t\t<div class=\"elementor-widget-container\">\n\t\t\t\t\t\t\t\t\t<div class=\"az-source\"><strong>References:<\/strong> <a href=\"https:\/\/nfsa.org\/2021\/03\/30\/mezzanines-and-fire-sprinkler-allowances\/\" rel=\"noopener\" target=\"_blank\">Mezzanines and Fire Sprinkler Allowances<\/a> (NFSA), <a href=\"https:\/\/www.csemag.com\/sprinkler-installations-and-obstructions\/\" rel=\"noopener\" target=\"_blank\">Sprinkler installations and obstructions<\/a> (Consulting-Specifying Engineer), <a href=\"https:\/\/meyerfire.com\/daily\/does-a-mezzanine-change-ceiling-level-density\" rel=\"noopener\" target=\"_blank\">Does sprinkler protection beneath an open grated mezzanine change the ceiling level sprinkler design density?<\/a> (MeyerFire)<\/div>\t\t\t\t\t\t\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t","protected":false},"excerpt":{"rendered":"<p>Warehouse mezzanine fire protection: when NFPA 13 needs sprinklers below the deck, open grating floors, re-laying detectors, and exits under SBC 201.<\/p>\n","protected":false},"author":0,"featured_media":27985,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"_acf_changed":false,"footnotes":""},"categories":[221,323,327,322],"tags":[],"azeidk_region":[223],"class_list":["post-28024","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-azeidk-articles","category-systems-guides-en","category-by-facility-en","category-systems-guides-ar"],"acf":[],"_links":{"self":[{"href":"https:\/\/azeidkgroup.com\/en\/wp-json\/wp\/v2\/posts\/28024","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/azeidkgroup.com\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/azeidkgroup.com\/en\/wp-json\/wp\/v2\/types\/post"}],"replies":[{"embeddable":true,"href":"https:\/\/azeidkgroup.com\/en\/wp-json\/wp\/v2\/comments?post=28024"}],"version-history":[{"count":1,"href":"https:\/\/azeidkgroup.com\/en\/wp-json\/wp\/v2\/posts\/28024\/revisions"}],"predecessor-version":[{"id":28041,"href":"https:\/\/azeidkgroup.com\/en\/wp-json\/wp\/v2\/posts\/28024\/revisions\/28041"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/azeidkgroup.com\/en\/wp-json\/wp\/v2\/media\/27985"}],"wp:attachment":[{"href":"https:\/\/azeidkgroup.com\/en\/wp-json\/wp\/v2\/media?parent=28024"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/azeidkgroup.com\/en\/wp-json\/wp\/v2\/categories?post=28024"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/azeidkgroup.com\/en\/wp-json\/wp\/v2\/tags?post=28024"},{"taxonomy":"azeidk_region","embeddable":true,"href":"https:\/\/azeidkgroup.com\/en\/wp-json\/wp\/v2\/azeidk_region?post=28024"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}