{"id":27225,"date":"2026-11-20T13:48:52","date_gmt":"2026-11-20T10:48:52","guid":{"rendered":"https:\/\/azeidkgroup.com\/sa\/media-center\/"},"modified":"2026-11-20T13:48:54","modified_gmt":"2026-11-20T10:48:54","slug":"fire-pipe-mill-test-certificate","status":"publish","type":"post","link":"https:\/\/azeidkgroup.com\/en\/sa\/media-center\/fire-pipe-mill-test-certificate\/","title":{"rendered":"Mill Test Certificate for Fire Pipes: How to Read It and Match It to the Shipment"},"content":{"rendered":"\t\t<div data-elementor-type=\"wp-post\" data-elementor-id=\"27225\" class=\"elementor elementor-27225 elementor-27224 elementor-bc-flex-widget\" data-elementor-post-type=\"post\">\n\t\t\t\t<div class=\"elementor-element elementor-element-68f8772 e-con-full az-el-article e-flex e-con e-parent\" data-id=\"68f8772\" data-element_type=\"container\" data-e-type=\"container\">\n\t\t\t\t<div class=\"elementor-element elementor-element-393dca6 elementor-widget elementor-widget-text-editor\" data-id=\"393dca6\" data-element_type=\"widget\" data-e-type=\"widget\" data-widget_type=\"text-editor.default\">\n\t\t\t\t<div class=\"elementor-widget-container\">\n\t\t\t\t\t\t\t\t\t<p class=\"az-intro\">A <strong>mill test certificate<\/strong> (MTC) for fire pipes is a document issued by the pipe mill confirming that the supplied batch meets the required standard, with test results such as chemical composition, mechanical tests and the hydrostatic test. On fire protection projects it is usually part of the submittal and receiving file, and its real value lies in tying it to the pipes actually delivered to site.<\/p>\n<p>This guide explains the inspection document types in EN 10204, what ASTM A795 says about fire protection pipe, and how to read a certificate and match it to the shipment before installation. AZEIDK supplies <a href=\"\/en\/sa\/products\/kdi-ul-listed-and-fm-approved-fire-sprinkler-pipes-schedule-10-and-schedule-40\/\">KDI UL Listed and FM Approved fire sprinkler pipes<\/a> through our <a href=\"\/en\/sa\/services\/technical-supply-of-fire-safety-systems\/\">technical supply<\/a> service, with their documents.<\/p>\t\t\t\t\t\t\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t\t\t<div class=\"elementor-element elementor-element-0c90dae elementor-widget elementor-widget-text-editor\" data-id=\"0c90dae\" data-element_type=\"widget\" data-e-type=\"widget\" data-widget_type=\"text-editor.default\">\n\t\t\t\t<div class=\"elementor-widget-container\">\n\t\t\t\t\t\t\t\t\t<div class=\"az-keybox\"><h2>Key takeaways<\/h2><ul><li>EN 10204 defines four inspection document types: 2.1, 2.2, 3.1 and 3.2. They differ in whether test results are included and who validates them.<\/li><li>Type 3.1 is common in project specifications: specific inspection results validated by an inspection representative independent of the manufacturing department.<\/li><li>ASTM A795 covers black and galvanized, welded steel pipe and steel pipe made without a weld seam for fire protection use, NPS 1\/2 to NPS 10.<\/li><li>ASTM A795 requires a hydrostatic test on each length of pipe, with non-destructive electric testing allowed as an alternative if the purchaser accepts it.<\/li><li>A certificate without a heat or lot number that matches the marking on the pipes proves nothing about the shipment.<\/li><\/ul><\/div>\t\t\t\t\t\t\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t\t\t<div class=\"elementor-element elementor-element-c966066 elementor-widget elementor-widget-text-editor\" data-id=\"c966066\" data-element_type=\"widget\" data-e-type=\"widget\" data-widget_type=\"text-editor.default\">\n\t\t\t\t<div class=\"elementor-widget-container\">\n\t\t\t\t\t\t\t\t\t<h2>What is a mill test certificate for pipes?<\/h2>\n<p>A mill test certificate is a quality document that travels with the pipe from the mill. It names the manufacturer, the standard the pipe was made to, sizes and schedules, the heat number or lot number, and the test results. On Saudi sites it is also called the &#8220;mill cert&#8221; or &#8220;factory certificate&#8221;, and specifications often ask for it as an EN 10204 type 3.1 certificate.<\/p>\n<p>It is different from product certifications such as a UL listing or FM approval. A product certification says the pipe model was evaluated and is produced under the certifier&#8217;s follow-up. A mill test certificate says this specific batch was tested and its results fall within the standard. A project needs both when the specification calls for both.<\/p>\t\t\t\t\t\t\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t\t\t<div class=\"elementor-element elementor-element-8e0303e elementor-widget elementor-widget-text-editor\" data-id=\"8e0303e\" data-element_type=\"widget\" data-e-type=\"widget\" data-widget_type=\"text-editor.default\">\n\t\t\t\t<div class=\"elementor-widget-container\">\n\t\t\t\t\t\t\t\t\t<h2>EN 10204 certificate types<\/h2>\n<div class=\"az-table-wrap\"><table><thead><tr><th>Type<\/th><th>Inspection<\/th><th>Issued and validated by<\/th><th>Test results included?<\/th><\/tr><\/thead><tbody><tr><td>2.1<\/td><td>Non-specific<\/td><td>Manufacturer: declaration of compliance with the order<\/td><td>No<\/td><\/tr><tr><td>2.2<\/td><td>Non-specific<\/td><td>Manufacturer<\/td><td>Yes, non-specific inspection results<\/td><\/tr><tr><td>3.1<\/td><td>Specific<\/td><td>Manufacturer, validated by an authorized inspection representative independent of manufacturing<\/td><td>Yes<\/td><\/tr><tr><td>3.2<\/td><td>Specific<\/td><td>The manufacturer&#8217;s independent inspection representative together with the purchaser&#8217;s representative or an officially designated inspector<\/td><td>Yes<\/td><\/tr><\/tbody><\/table><\/div>\n<p>&#8220;Specific inspection&#8221; means tests on the test unit defined by the product specification, regulation or order, not general results from earlier production. For 3.1 and 3.2, the standard lets the manufacturer carry over results from inspection of primary products if it operates traceability procedures. That is why the heat or lot number is the link between the paper and the pipe.<\/p>\t\t\t\t\t\t\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t\t\t<div class=\"elementor-element elementor-element-2a7e9a6 elementor-widget elementor-widget-text-editor\" data-id=\"2a7e9a6\" data-element_type=\"widget\" data-e-type=\"widget\" data-widget_type=\"text-editor.default\">\n\t\t\t\t<div class=\"elementor-widget-container\">\n\t\t\t\t\t\t\t\t\t<h2>What ASTM A795 says about fire protection pipe<\/h2>\n<p>ASTM A795 covers black and hot-dipped zinc-coated (galvanized) welded steel pipe and steel pipe made without a weld seam for fire protection use, in NPS 1\/2 to NPS 10 (DN 15 to DN 250), with wall thicknesses given in its tables. Requirements listed in the standard&#8217;s summary include:<\/p>\n<ul><li>A hydrostatic test on each length of pipe without leakage through the wall, with non-destructive electric testing allowed as an alternative if the purchaser accepts it.<\/li><li>A flattening test.<\/li><li>Steel conforming to the required chemical composition.<\/li><li>The pipe is not intended for cold bending where the inside diameter of the bend is less than twelve times the outside diameter.<\/li><\/ul>\n<p>So on a certificate for pipe made to ASTM A795 you would expect chemical analysis, the hydrostatic test result or its alternative, and the mechanical results the mill reports. Required values depend on grade and edition, so the reference is the standard text and edition named in the specification.<\/p>\n<p>For pipe types, schedules and grooved joints, see <a href=\"\/en\/sa\/media-center\/fire-pipes-types-saudi\/\">Fire Pipes: Types, Schedules, Grooved Joints and Delivery Inspection<\/a>.<\/p>\t\t\t\t\t\t\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t\t\t<div class=\"elementor-element elementor-element-44b895d elementor-widget elementor-widget-text-editor\" data-id=\"44b895d\" data-element_type=\"widget\" data-e-type=\"widget\" data-widget_type=\"text-editor.default\">\n\t\t\t\t<div class=\"elementor-widget-container\">\n\t\t\t\t\t\t\t\t\t<h2>How to read a mill certificate and match it to the shipment<\/h2>\n<h3>Header data<\/h3>\n<ul><li>Mill name and address, certificate number and date.<\/li><li>Standard and edition (ASTM A795 or whatever the specification names) and the EN 10204 certificate type.<\/li><li>Buyer name and purchase order number where given.<\/li><\/ul>\n<h3>Product data<\/h3>\n<ul><li>Nominal size and schedule (Schedule 10 or 40, for example), length, finish (black or galvanized) and end type.<\/li><li>Heat number, lot number and number of lengths or weight.<\/li><\/ul>\n<h3>Results and signature<\/h3>\n<ul><li>Chemical analysis, mechanical tests and the hydrostatic test or its alternative.<\/li><li>Signature and stamp of the inspection representative, with name and function for type 3.1.<\/li><\/ul>\n<h3>Matching on site<\/h3>\n<p>Take a sample of the delivered pipes and read the marking: manufacturer, standard, size and heat or lot number. You should find the same numbers on the certificate. Then match quantities to the delivery note and packing list. If the specification calls for a UL listing or FM approval, also check the certification mark on the pipe and the model record in the official database.<\/p>\t\t\t\t\t\t\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t\t\t<div class=\"elementor-element elementor-element-5de55a8 elementor-widget elementor-widget-text-editor\" data-id=\"5de55a8\" data-element_type=\"widget\" data-e-type=\"widget\" data-widget_type=\"text-editor.default\">\n\t\t\t\t<div class=\"elementor-widget-container\">\n\t\t\t\t\t\t\t\t\t<h2>Warning signs in pipe certificates<\/h2>\n<ul><li>No heat or lot number, or numbers that do not appear on any pipe in the shipment.<\/li><li>Only a type 2.1 document while the specification asks for 3.1.<\/li><li>A different standard from the one in the specification or the material submittal.<\/li><li>An unclear scanned copy without signature or stamp, or one issued by a party other than the mill with nothing linking it to the original mill certificate.<\/li><li>Sizes or schedules on the certificate that do not match what was received.<\/li><\/ul>\n<p>These are among the most common reasons receiving is put on hold. To prepare a complete file before supply, see our guide to the <a href=\"\/en\/sa\/media-center\/material-submittal-fire-security-equipment\/\">material submittal for fire and security equipment<\/a>.<\/p>\t\t\t\t\t\t\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t\t\t<div class=\"elementor-element elementor-element-3cb2a9b elementor-widget elementor-widget-text-editor\" data-id=\"3cb2a9b\" data-element_type=\"widget\" data-e-type=\"widget\" data-widget_type=\"text-editor.default\">\n\t\t\t\t<div class=\"elementor-widget-container\">\n\t\t\t\t\t\t\t\t\t<h2>When is a mill test certificate requested on a fire project?<\/h2>\n<p>The certificate appears at three points. In the material submittal, the consultant may ask for a sample mill certificate to confirm its type and standard before approving the source. When each shipment arrives, the certificates for that shipment are requested, not an old sample. In the final handover file, certificates are kept with as-built drawings and O&amp;M manuals as part of the project record.<\/p>\n<p>So agree with the supplier from the start on the certificate type required (3.1, for example), that it accompanies every shipment, and how it is delivered: original, certified copy or an electronic file from the mill.<\/p>\t\t\t\t\t\t\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t\t\t<div class=\"elementor-element elementor-element-473cb62 elementor-widget elementor-widget-text-editor\" data-id=\"473cb62\" data-element_type=\"widget\" data-e-type=\"widget\" data-widget_type=\"text-editor.default\">\n\t\t\t\t<div class=\"elementor-widget-container\">\n\t\t\t\t\t\t\t\t\t<h2>What a mill test certificate does not prove<\/h2>\n<p>The certificate proves test results for a batch as it left the mill. It does not prove the pipes were not damaged in transport or storage, that grooves or threads cut on site were done correctly, or that the installed network is sound. Those are checked by visual inspection at receiving and then by network tests on site. Nor does the certificate prove that the supplier is authorized, which is a matter for other documents.<\/p>\t\t\t\t\t\t\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t\t\t<div class=\"elementor-element elementor-element-b32ee9d elementor-widget elementor-widget-text-editor\" data-id=\"b32ee9d\" data-element_type=\"widget\" data-e-type=\"widget\" data-widget_type=\"text-editor.default\">\n\t\t\t\t<div class=\"elementor-widget-container\">\n\t\t\t\t\t\t\t\t\t<h2>Frequently asked questions<\/h2><div class=\"az-faq\"><details class=\"az-faq__item\"><summary><h3>What is a mill test certificate for pipes?<\/h3><\/summary><p>A document from the pipe mill confirming the batch meets the standard, with test results and the heat or lot number that ties it to the delivered pipes.<\/p><\/details><details class=\"az-faq__item\"><summary><h3>What is the difference between a 3.1 and a 3.2 certificate?<\/h3><\/summary><p>A 3.1 is validated by the manufacturer&#8217;s inspection representative independent of production. A 3.2 is prepared jointly with the purchaser&#8217;s representative or an officially designated inspector.<\/p><\/details><details class=\"az-faq__item\"><summary><h3>Does a mill certificate replace a UL listing or FM approval?<\/h3><\/summary><p>No. The mill certificate covers one batch, while UL and FM certify the product model. If the specification asks for both, both are needed.<\/p><\/details><details class=\"az-faq__item\"><summary><h3>Does ASTM A795 require a pressure test on every pipe?<\/h3><\/summary><p>Yes, a hydrostatic test on each length, with non-destructive electric testing allowed as an alternative if the purchaser accepts it.<\/p><\/details><details class=\"az-faq__item\"><summary><h3>How do I know the certificate belongs to the pipes I received?<\/h3><\/summary><p>Match the heat or lot number, size and standard marked on the pipes with the certificate, then match quantities with the delivery note.<\/p><\/details><details class=\"az-faq__item\"><summary><h3>Does the mill hydrostatic test replace the site pressure test?<\/h3><\/summary><p>No. The mill test covers individual pipes. The installed network is tested on site under the design and acceptance requirements.<\/p><\/details><\/div>\t\t\t\t\t\t\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t\t\t<div class=\"elementor-element elementor-element-aeb5740 elementor-widget elementor-widget-text-editor\" data-id=\"aeb5740\" data-element_type=\"widget\" data-e-type=\"widget\" data-widget_type=\"text-editor.default\">\n\t\t\t\t<div class=\"elementor-widget-container\">\n\t\t\t\t\t\t\t\t\t<h2>Summary<\/h2>\n<p>A mill test certificate is not paperwork for show. Its value rests on three points: its EN 10204 type, the manufacturing standard it cites, and a heat or lot number that matches the pipes on site. Check them before installation, because finding a mismatch after the pipes are hung and covered costs far more.<\/p>\t\t\t\t\t\t\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t\t\t<div class=\"elementor-element elementor-element-14961e8 elementor-widget elementor-widget-text-editor\" data-id=\"14961e8\" data-element_type=\"widget\" data-e-type=\"widget\" data-widget_type=\"text-editor.default\">\n\t\t\t\t<div class=\"elementor-widget-container\">\n\t\t\t\t\t\t\t\t\t<p class=\"az-cta\"><strong>Need fire pipes with complete documents?<\/strong> Send us sizes, schedules and quantities and we will prepare a supply offer with datasheets and available certificates. <a href=\"\/en\/sa\/contact\/\">Contact the AZEIDK team<\/a><\/p>\t\t\t\t\t\t\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t\t\t<div class=\"elementor-element elementor-element-1dac4da elementor-widget elementor-widget-text-editor\" data-id=\"1dac4da\" data-element_type=\"widget\" data-e-type=\"widget\" data-widget_type=\"text-editor.default\">\n\t\t\t\t<div class=\"elementor-widget-container\">\n\t\t\t\t\t\t\t\t\t<div class=\"az-source\"><strong>Sources:<\/strong> <a href=\"https:\/\/store.astm.org\/a0795_a0795m-21.html\" rel=\"noopener\" target=\"_blank\">ASTM A795\/A795M-21, standard specification for black and galvanized steel pipe for fire protection use<\/a> (ASTM International), <a href=\"https:\/\/www.vanleeuwen.com\/services\/testing-and-material-inspections\/en10204\" rel=\"noopener\" target=\"_blank\">EN 10204 inspection documents<\/a> (Van Leeuwen Pipe and Tube)<\/div>\t\t\t\t\t\t\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t","protected":false},"excerpt":{"rendered":"<p>Mill test certificate for fire pipes: EN 10204 types 2.1 to 3.2, ASTM A795 requirements, and matching heat numbers to delivered pipes on site.<\/p>\n","protected":false},"author":0,"featured_media":27050,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"_acf_changed":false,"footnotes":""},"categories":[221,323,329,322],"tags":[],"azeidk_region":[223],"class_list":["post-27225","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-azeidk-articles","category-systems-guides-en","category-operation-maintenance-en","category-systems-guides-ar"],"acf":[],"_links":{"self":[{"href":"https:\/\/azeidkgroup.com\/en\/wp-json\/wp\/v2\/posts\/27225","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/azeidkgroup.com\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/azeidkgroup.com\/en\/wp-json\/wp\/v2\/types\/post"}],"replies":[{"embeddable":true,"href":"https:\/\/azeidkgroup.com\/en\/wp-json\/wp\/v2\/comments?post=27225"}],"version-history":[{"count":0,"href":"https:\/\/azeidkgroup.com\/en\/wp-json\/wp\/v2\/posts\/27225\/revisions"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/azeidkgroup.com\/en\/wp-json\/wp\/v2\/media\/27050"}],"wp:attachment":[{"href":"https:\/\/azeidkgroup.com\/en\/wp-json\/wp\/v2\/media?parent=27225"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/azeidkgroup.com\/en\/wp-json\/wp\/v2\/categories?post=27225"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/azeidkgroup.com\/en\/wp-json\/wp\/v2\/tags?post=27225"},{"taxonomy":"azeidk_region","embeddable":true,"href":"https:\/\/azeidkgroup.com\/en\/wp-json\/wp\/v2\/azeidk_region?post=27225"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}