{"id":23097,"date":"2026-11-11T15:55:21","date_gmt":"2026-11-11T12:55:21","guid":{"rendered":"https:\/\/azeidkgroup.com\/sa\/media-center\/"},"modified":"2026-11-11T22:21:57","modified_gmt":"2026-11-11T19:21:57","slug":"sbc-801-vs-sbc-201-vs-civil-defense-requirements","status":"publish","type":"post","link":"https:\/\/azeidkgroup.com\/en\/sa\/media-center\/sbc-801-vs-sbc-201-vs-civil-defense-requirements\/","title":{"rendered":"Saudi Fire Code SBC 801 vs SBC 201 vs Civil Defense Requirements: What Each Covers and Who Applies It"},"content":{"rendered":"\t\t<div data-elementor-type=\"wp-post\" data-elementor-id=\"23097\" class=\"elementor elementor-23097 elementor-23096 elementor-bc-flex-widget\" data-elementor-post-type=\"post\">\n\t\t\t\t<div class=\"elementor-element elementor-element-9914034 e-con-full az-el-article e-flex e-con e-parent\" data-id=\"9914034\" data-element_type=\"container\" data-e-type=\"container\">\n\t\t\t\t<div class=\"elementor-element elementor-element-f137376 elementor-widget elementor-widget-text-editor\" data-id=\"f137376\" data-element_type=\"widget\" data-e-type=\"widget\" data-widget_type=\"text-editor.default\">\n\t\t\t\t<div class=\"elementor-widget-container\">\n\t\t\t\t\t\t\t\t\t<p class=\"az-intro\">The <strong>Saudi Fire Code<\/strong> (SBC 801) and the Saudi General Building Code (SBC 201) are two parts of the Saudi Building Code. Civil Defense requirements are something else: the oversight role the General Directorate of Civil Defense plays in enforcing fire protection, with facility licences issued through the Salamah platform. The codes say what the building must be. Civil Defense checks it and licenses the facility.<\/p>\n<p>This article sets out what each one covers, who applies which part at each project stage, and where owners, designers and contractors usually get confused. If your project is at the approval or licensing stage, AZEIDK&#8217;s <a href=\"\/en\/sa\/services\/civil-defense-approval-support\/\">Civil Defense approval support<\/a> service follows this same split.<\/p>\t\t\t\t\t\t\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t\t\t<div class=\"elementor-element elementor-element-8132958 elementor-widget elementor-widget-text-editor\" data-id=\"8132958\" data-element_type=\"widget\" data-e-type=\"widget\" data-widget_type=\"text-editor.default\">\n\t\t\t\t<div class=\"elementor-widget-container\">\n\t\t\t\t\t\t\t\t\t<div class=\"az-keybox\"><h2>Key takeaways<\/h2><ul><li>SBC 201 is the general building code: occupancy classification, heights and areas, construction types, fire-resistance-rated separation, means of egress and systems.<\/li><li>SBC 801 is the fire protection code: systems and their upkeep, emergency planning, operations, storage and hazardous materials over the life of the building.<\/li><li>Both belong to the 2024 Saudi Building Code, mandatory since 30 June 2025 after a 180-day transition.<\/li><li>The implementing regulations of the Saudi Building Code Law give Civil Defense the job of monitoring code compliance for fire prevention and protection systems, and give municipalities building permits and occupancy certificates.<\/li><li>Salamah is Civil Defense&#8217;s licensing portal for facilities. It is not a technical code in its own right.<\/li><\/ul><\/div>\t\t\t\t\t\t\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t\t\t<div class=\"elementor-element elementor-element-2b9fc16 elementor-widget elementor-widget-text-editor\" data-id=\"2b9fc16\" data-element_type=\"widget\" data-e-type=\"widget\" data-widget_type=\"text-editor.default\">\n\t\t\t\t<div class=\"elementor-widget-container\">\n\t\t\t\t\t\t\t\t\t<h2>Saudi Fire Code vs SBC 201 vs Civil Defense: a quick comparison<\/h2>\n<p>The most common mistake is to treat the three as competing technical references. Two of them are technical codes issued within one system. The third is an authority with its own tools and portal.<\/p>\n<div class=\"az-table-wrap\"><table><thead><tr><th>Item<\/th><th>SBC 201 (General Building Code)<\/th><th>SBC 801 (Fire Protection Code)<\/th><th>Civil Defense and Salamah<\/th><\/tr><\/thead><tbody><tr><td>Nature<\/td><td>Technical code<\/td><td>Technical code<\/td><td>Oversight and licensing authority<\/td><\/tr><tr><td>Issued by<\/td><td>Saudi Building Code National Committee<\/td><td>Saudi Building Code National Committee<\/td><td>General Directorate of Civil Defense<\/td><\/tr><tr><td>Focus<\/td><td>Building design and construction<\/td><td>Fire protection during construction, operation and maintenance<\/td><td>Verifying compliance and issuing licences<\/td><\/tr><tr><td>When it applies<\/td><td>From concept design to building permit and occupancy<\/td><td>From design to the last day the facility operates<\/td><td>Drawing approval, inspection, licence issue and renewal<\/td><\/tr><tr><td>Main user<\/td><td>Design office and contractor<\/td><td>Designer, contractor, owner and operator<\/td><td>Owner or business operator<\/td><\/tr><\/tbody><\/table><\/div>\t\t\t\t\t\t\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t\t\t<div class=\"elementor-element elementor-element-aa0f5b6 elementor-widget elementor-widget-text-editor\" data-id=\"aa0f5b6\" data-element_type=\"widget\" data-e-type=\"widget\" data-widget_type=\"text-editor.default\">\n\t\t\t\t<div class=\"elementor-widget-container\">\n\t\t\t\t\t\t\t\t\t<h2>What does SBC 201 cover?<\/h2>\n<p>Every project starts with SBC 201. It sets the occupancy classification (residential, business, educational, industrial, storage and so on), and that classification drives everything else, including fire requirements. The ICC study material for the 2018 edition lists topics including:<\/p>\n<ul><li>Occupancy classification and use, plus special requirements for certain uses.<\/li><li>Allowable building heights and areas.<\/li><li>Construction types and fire-resistance ratings.<\/li><li>Fire and smoke protection features: separating walls and floors, openings in them, and compartmentation.<\/li><li>Fire protection and life safety systems.<\/li><li>Means of egress and accessibility.<\/li><li>Interior finishes, structural requirements, elevators and more.<\/li><\/ul>\n<p>Many fire decisions are made in SBC 201 before a single sprinkler is drawn: construction type, fire areas, and the number and width of exits. For exits in detail, see our article on <a href=\"\/en\/sa\/media-center\/emergency-exits-requirements-saudi\/\">emergency exits under SBC 201<\/a>.<\/p>\t\t\t\t\t\t\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t\t\t<div class=\"elementor-element elementor-element-bac90e2 elementor-widget elementor-widget-text-editor\" data-id=\"bac90e2\" data-element_type=\"widget\" data-e-type=\"widget\" data-widget_type=\"text-editor.default\">\n\t\t\t\t<div class=\"elementor-widget-container\">\n\t\t\t\t\t\t\t\t\t<h2>What does SBC 801 cover?<\/h2>\n<p>SBC 801 looks at the building in use, not just as a design. According to the ICC study material for the 2018 edition, its topics include:<\/p>\n<ul><li>Scope and administration, and requirements for existing buildings.<\/li><li>Emergency planning and preparedness.<\/li><li>Fire service features and access.<\/li><li>Building services, fire and smoke protection features, interior finishes and furnishings.<\/li><li>Fire protection systems and means of egress.<\/li><li>Special occupancies and operations such as fuel dispensing, high-piled storage, hot work, and fire safety during construction and demolition.<\/li><li>Hazardous materials, including flammable liquids and compressed gases.<\/li><\/ul>\n<p>SBC 801 relies on the occupancy classification in SBC 201, so it cannot be applied on its own. Its chapters, edition dates and owner duties are covered in our <a href=\"\/en\/sa\/media-center\/saudi-building-code-sbc-801-fire-protection\/\">practical guide to SBC 801<\/a>, so we do not repeat them here.<\/p>\t\t\t\t\t\t\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t\t\t<div class=\"elementor-element elementor-element-32a6fbf elementor-widget elementor-widget-text-editor\" data-id=\"32a6fbf\" data-element_type=\"widget\" data-e-type=\"widget\" data-widget_type=\"text-editor.default\">\n\t\t\t\t<div class=\"elementor-widget-container\">\n\t\t\t\t\t\t\t\t\t<h2>Where do the two codes overlap?<\/h2>\n<p>Both codes have a chapter on fire protection and life safety systems and a chapter on means of egress. That is why the ICC study companion for SBC 801 (2018 edition) points to SBC 201 Chapters 3 and 5 when it explains occupancy classification. The overlap is deliberate: SBC 201 asks the question from the design of a new building, SBC 801 from operating it and keeping systems serviceable.<\/p>\n<p>In practice, the designer and consultant:<\/p>\n<ol><li>Set occupancy, construction type and fire areas from SBC 201 first.<\/li><li>Check where systems (sprinklers, alarm, standpipes) are required in both codes and record the governing reference in the design report.<\/li><li>Design the systems to the referenced standards, such as NFPA, at the editions named in the referenced-standards chapter of the code edition that applies to the project.<\/li><li>Add SBC 801 operating requirements: maintenance and periodic inspection, emergency plans, storage limits and hazardous materials.<\/li><\/ol>\n<p>NFPA standards here are technical references the code points to or the designer adopts. They do not replace the Saudi code.<\/p>\t\t\t\t\t\t\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t\t\t<div class=\"elementor-element elementor-element-4b460c3 elementor-widget elementor-widget-text-editor\" data-id=\"4b460c3\" data-element_type=\"widget\" data-e-type=\"widget\" data-widget_type=\"text-editor.default\">\n\t\t\t\t<div class=\"elementor-widget-container\">\n\t\t\t\t\t\t\t\t\t<h2>Civil Defense requirements: an authority, not a third code<\/h2>\n<p>When contractors say &#8220;Civil Defense requirements&#8221;, they usually mean what will be asked for at drawing approval or inspection. On the building side, those requirements come from the code itself. Civil Defense is the body that monitors how it is applied.<\/p>\n<h3>What the implementing regulations say<\/h3>\n<p>The implementing regulations of the Saudi Building Code Law name the bodies concerned with the code, including the Ministry of Municipal Affairs, the General Directorate of Civil Defense and the Saudi Standards, Metrology and Quality Organization (SASO). Monitoring of compliance is split as follows:<\/p>\n<ul><li><strong>Municipality (Amanah or Baladiyah):<\/strong> building and renovation permits, follow-up of inspections and tests during construction, and the occupancy certificate once the building is shown to comply with the code.<\/li><li><strong>Civil Defense:<\/strong> monitoring code compliance and recording violations for fire prevention and protection systems during construction, maintenance, operation and storage, and coordinating on the qualification of engineering offices and contractors in fire prevention.<\/li><\/ul>\n<h3>Civil Defense&#8217;s own regulations<\/h3>\n<p>Alongside the code, Civil Defense issues regulations and guides for specific activities or roles. One example is the regulation on the responsibilities of the safety, fire prevention and protection officer, whose update was published in Umm Al-Qura, with Civil Defense referring readers to its official website (January 2026). These rules complement the code on the operational side and do not cancel its technical requirements. For requirements by facility type, see <a href=\"\/en\/sa\/media-center\/saudi-civil-defense-requirements-buildings-facilities\/\">Saudi Civil Defense requirements for buildings and facilities<\/a>. Collective housing is one practical case, and AZEIDK covers it in a guide to <a href=\"\/en\/sa\/media-center\/worker-accommodation-fire-safety-requirements\/\">worker accommodation safety requirements<\/a>.<\/p>\n<h3>The Salamah platform<\/h3>\n<p>Salamah is Civil Defense&#8217;s online licensing portal for facilities, linked to several government agencies. When its updated identity was launched in May 2024, it was announced as offering 34 e-services through Absher Business, including licence amendment and extension. The portal organises the procedure; the technical acceptance criteria remain the code and Civil Defense regulations. For the practical steps, see <a href=\"\/en\/sa\/media-center\/salamah-certificate-civil-defense-guide\/\">the Salamah certificate from Civil Defense<\/a>.<\/p>\t\t\t\t\t\t\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t\t\t<div class=\"elementor-element elementor-element-99a0b8d elementor-widget elementor-widget-text-editor\" data-id=\"99a0b8d\" data-element_type=\"widget\" data-e-type=\"widget\" data-widget_type=\"text-editor.default\">\n\t\t\t\t<div class=\"elementor-widget-container\">\n\t\t\t\t\t\t\t\t\t<h2>Who applies what at each project stage?<\/h2>\n<p>The table links each stage to its main technical reference and the bodies involved. Procedures vary with the type and risk level of the activity, so confirm the actual path on the official platform for each project.<\/p>\n<div class=\"az-table-wrap\"><table><thead><tr><th>Stage<\/th><th>Main technical reference<\/th><th>Prepared by<\/th><th>Reviewed or licensed by<\/th><\/tr><\/thead><tbody><tr><td>Architectural and structural design<\/td><td>SBC 201 (occupancy, construction, separation, egress)<\/td><td>Design office<\/td><td>Municipality, through the building permit<\/td><\/tr><tr><td>Fire system design<\/td><td>SBC 801, SBC 201 and referenced standards<\/td><td>Fire protection designer<\/td><td>Civil Defense, for protection systems<\/td><\/tr><tr><td>Equipment supply<\/td><td>Project specifications and conformity requirements<\/td><td>Contractor and supplier<\/td><td>Consultant, and SASO via SABER for products under its regulations<\/td><\/tr><tr><td>Installation and testing<\/td><td>SBC 801, referenced standards and manufacturer instructions<\/td><td>Contractor<\/td><td>Consultant, and Civil Defense at inspection<\/td><\/tr><tr><td>Occupancy<\/td><td>Compliance with the full code<\/td><td>Owner<\/td><td>Municipality (occupancy certificate)<\/td><\/tr><tr><td>Operation and licence renewal<\/td><td>SBC 801 and Civil Defense regulations<\/td><td>Owner or operator<\/td><td>Civil Defense via Salamah<\/td><\/tr><\/tbody><\/table><\/div>\n<p>On supply, the SASO Technical Regulation for Fire Control Materials and Equipment requires a certificate of conformity for extinguishing equipment and fire pumps, and excludes fire alarm and firefighting systems from its scope.<\/p>\t\t\t\t\t\t\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t\t\t<div class=\"elementor-element elementor-element-1da2ce5 elementor-widget elementor-widget-text-editor\" data-id=\"1da2ce5\" data-element_type=\"widget\" data-e-type=\"widget\" data-widget_type=\"text-editor.default\">\n\t\t\t\t<div class=\"elementor-widget-container\">\n\t\t\t\t\t\t\t\t\t<h2>Common mistakes about roles<\/h2>\n<ul><li><strong>Treating a Salamah licence as proof of code compliance:<\/strong> the licence is based on what was submitted and inspected. A later change in occupancy or storage can take the facility out of compliance.<\/li><li><strong>Designing to NFPA alone:<\/strong> the reference standard sets how to design; whether a system is required, and its extent, comes from the Saudi code.<\/li><li><strong>Ignoring the SBC 201 occupancy classification:<\/strong> a wrong classification changes sprinkler, alarm and egress requirements at once.<\/li><li><strong>Using the wrong code edition:<\/strong> confirm which edition applies to the project based on its permit date, especially for projects that started near the end of the transition period (see our news item on <a href=\"\/en\/sa\/media-center\/saudi-building-code-sbc-201-801-2024-edition-news-en\/\">the 2024 Saudi Building Code becoming mandatory<\/a>).<\/li><li><strong>Change of use without review:<\/strong> turning a warehouse into a showroom, or an office into a restaurant, reopens both SBC 201 and SBC 801 questions.<\/li><li><strong>Confusing product certificates with system approval:<\/strong> a conformity certificate or UL\/FM listing covers the product. Acceptance of the installed system depends on design, installation and testing.<\/li><\/ul>\t\t\t\t\t\t\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t\t\t<div class=\"elementor-element elementor-element-280c2cf elementor-widget elementor-widget-text-editor\" data-id=\"280c2cf\" data-element_type=\"widget\" data-e-type=\"widget\" data-widget_type=\"text-editor.default\">\n\t\t\t\t<div class=\"elementor-widget-container\">\n\t\t\t\t\t\t\t\t\t<h2>How AZEIDK supports Civil Defense approvals<\/h2>\n<p>The <a href=\"\/en\/sa\/services\/civil-defense-approval-support\/\">Civil Defense approval support<\/a> service runs in four steps: reviewing requirements and documents, identifying gaps, helping complete the files and coordinate, and following up observations until they are closed. Clients receive a requirements list for their facility and procedure (new licence, renewal or response to observations), a gap report covering alarm, suppression and safety systems, an organised file of drawings, reports and certificates, and a prioritised remediation plan.<\/p>\n<p>The service covers preparing and following up Civil Defense transactions on Salamah and Balady within the agreed scope. Issuing a licence is the authority&#8217;s decision alone, and no consultant can guarantee it. If the problem lies in the design itself, start with a <a href=\"\/en\/sa\/services\/drawings-specifications-review\/\">drawings and specifications review<\/a> before submission.<\/p>\t\t\t\t\t\t\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t\t\t<div class=\"elementor-element elementor-element-298a273 elementor-widget elementor-widget-text-editor\" data-id=\"298a273\" data-element_type=\"widget\" data-e-type=\"widget\" data-widget_type=\"text-editor.default\">\n\t\t\t\t<div class=\"elementor-widget-container\">\n\t\t\t\t\t\t\t\t\t<h2>Frequently asked questions<\/h2><div class=\"az-faq\"><details class=\"az-faq__item\"><summary><h3>What is the Saudi Fire Code?<\/h3><\/summary><p>It is SBC 801, the Saudi Fire Protection Code, one of the codes in the Saudi Building Code system. It covers fire protection systems and their maintenance, emergency planning, and requirements for operations, storage and hazardous materials.<\/p><\/details><details class=\"az-faq__item\"><summary><h3>What is the difference between SBC 201 and SBC 801?<\/h3><\/summary><p>SBC 201 governs building design: occupancy, height, construction, separation and egress. SBC 801 focuses on fire protection over the life of the building. Both have systems and egress chapters, and SBC 801 relies on the occupancy classification in SBC 201.<\/p><\/details><details class=\"az-faq__item\"><summary><h3>Are Civil Defense requirements a separate code?<\/h3><\/summary><p>No. Civil Defense monitors code compliance for fire protection systems and issues licences, and it has its own regulations for some activities and roles. The technical reference for buildings is the Saudi Building Code.<\/p><\/details><details class=\"az-faq__item\"><summary><h3>Who issues the occupancy certificate, the municipality or Civil Defense?<\/h3><\/summary><p>Under the implementing regulations, the municipality issues the occupancy certificate after confirming the building complies with the code. The Civil Defense facility licence is issued through Salamah.<\/p><\/details><details class=\"az-faq__item\"><summary><h3>Is the 2024 Saudi Building Code mandatory now?<\/h3><\/summary><p>Yes. The 2024 edition has been mandatory since 30 June 2025 after a 180-day transition, and it includes SBC 201 and SBC 801.<\/p><\/details><details class=\"az-faq__item\"><summary><h3>Is following NFPA enough for Civil Defense approval?<\/h3><\/summary><p>No. NFPA standards are technical references for design and installation. Whether a system is required, and its extent, is set by the Saudi code, and final acceptance rests with the authority.<\/p><\/details><\/div>\t\t\t\t\t\t\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t\t\t<div class=\"elementor-element elementor-element-94d1b36 elementor-widget elementor-widget-text-editor\" data-id=\"94d1b36\" data-element_type=\"widget\" data-e-type=\"widget\" data-widget_type=\"text-editor.default\">\n\t\t\t\t<div class=\"elementor-widget-container\">\n\t\t\t\t\t\t\t\t\t<h2>Summary<\/h2>\n<p>SBC 201 shapes the building, SBC 801 protects it from fire for its whole life, and Civil Defense checks both and licenses the activity through Salamah. Getting this split right saves rounds of observations: each question goes to the right reference, and each document is prepared for the body that will review it.<\/p>\t\t\t\t\t\t\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t\t\t<div class=\"elementor-element elementor-element-d9c0291 elementor-widget elementor-widget-text-editor\" data-id=\"d9c0291\" data-element_type=\"widget\" data-e-type=\"widget\" data-widget_type=\"text-editor.default\">\n\t\t\t\t<div class=\"elementor-widget-container\">\n\t\t\t\t\t\t\t\t\t<p class=\"az-cta\"><strong>Facing Civil Defense observations or a licence renewal?<\/strong> Send us your facility type, the procedure you need and any current observations, and we will map the gaps and what it takes to complete the file. <a href=\"\/en\/sa\/contact\/\">Contact the AZEIDK team<\/a><\/p>\t\t\t\t\t\t\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t\t\t<div class=\"elementor-element elementor-element-94d9f90 elementor-widget elementor-widget-text-editor\" data-id=\"94d9f90\" data-element_type=\"widget\" data-e-type=\"widget\" data-widget_type=\"text-editor.default\">\n\t\t\t\t<div class=\"elementor-widget-container\">\n\t\t\t\t\t\t\t\t\t<div class=\"az-source\"><strong>References:<\/strong> <a href=\"https:\/\/sbc.gov.sa\/Ar\/BC\/Pages\/buildingcode\/BC.aspx?year=2024\" rel=\"noopener\" target=\"_blank\">Building Code 2024: code list<\/a> (Saudi Building Code National Committee); <a href=\"https:\/\/momah.gov.sa\/sites\/default\/files\/2021-06\/%D8%A7%D9%84%D9%84%D8%A7%D8%A6%D8%AD%D8%A9%20%D8%A7%D9%84%D8%AA%D9%86%D9%81%D9%8A%D8%B0%D9%8A%D8%A9%20%D9%84%D9%86%D8%B8%D8%A7%D9%85%20%D9%83%D9%88%D8%AF%20%D8%A7%D9%84%D8%A8%D9%86%D8%A7%D8%A1.pdf\" rel=\"noopener\" target=\"_blank\">Implementing Regulations of the Saudi Building Code Law<\/a> (Ministry of Municipalities and Housing); <a href=\"https:\/\/amlak.net.sa\/en\/73090\/\" rel=\"noopener\" target=\"_blank\">3 new construction codes added as part of the 2024 Saudi Building Code Modernization<\/a> (Amlak); <a href=\"https:\/\/shop.iccsafe.org\/media\/wysiwyg\/material\/4017S18SBC-TOC.pdf\" rel=\"noopener\" target=\"_blank\">2018 Saudi Building Code (SBC 201) Study Companion: Contents<\/a> (ICC); <a href=\"https:\/\/shop.iccsafe.org\/media\/wysiwyg\/material\/4407S18SBC-TOC.pdf\" rel=\"noopener\" target=\"_blank\">2018 Saudi Fire Code (SBC 801) Study Companion: Contents<\/a> (ICC); <a href=\"https:\/\/saudigazette.com.sa\/article\/643068\" rel=\"noopener\" target=\"_blank\">Interior Minister launches Civil Defense&#8217;s updated Salamah Portal identity<\/a> (Saudi Gazette); <a href=\"https:\/\/www.okaz.com.sa\/local\/na\/2232612\" rel=\"noopener\" target=\"_blank\">Update to the safety officer responsibilities regulation<\/a> (Okaz)<\/div>\t\t\t\t\t\t\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t","protected":false},"excerpt":{"rendered":"<p>Saudi Fire Code SBC 801, General Building Code SBC 201 and Civil Defense requirements: what each covers, who reviews and licenses at each stage, and Salamah.<\/p>\n","protected":false},"author":0,"featured_media":23088,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"_acf_changed":false,"footnotes":""},"categories":[221,321,320],"tags":[],"azeidk_region":[223],"class_list":["post-23097","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-azeidk-articles","category-codes-certifications-en","category-codes-certifications-ar"],"acf":[],"_links":{"self":[{"href":"https:\/\/azeidkgroup.com\/en\/wp-json\/wp\/v2\/posts\/23097","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/azeidkgroup.com\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/azeidkgroup.com\/en\/wp-json\/wp\/v2\/types\/post"}],"replies":[{"embeddable":true,"href":"https:\/\/azeidkgroup.com\/en\/wp-json\/wp\/v2\/comments?post=23097"}],"version-history":[{"count":2,"href":"https:\/\/azeidkgroup.com\/en\/wp-json\/wp\/v2\/posts\/23097\/revisions"}],"predecessor-version":[{"id":23120,"href":"https:\/\/azeidkgroup.com\/en\/wp-json\/wp\/v2\/posts\/23097\/revisions\/23120"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/azeidkgroup.com\/en\/wp-json\/wp\/v2\/media\/23088"}],"wp:attachment":[{"href":"https:\/\/azeidkgroup.com\/en\/wp-json\/wp\/v2\/media?parent=23097"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/azeidkgroup.com\/en\/wp-json\/wp\/v2\/categories?post=23097"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/azeidkgroup.com\/en\/wp-json\/wp\/v2\/tags?post=23097"},{"taxonomy":"azeidk_region","embeddable":true,"href":"https:\/\/azeidkgroup.com\/en\/wp-json\/wp\/v2\/azeidk_region?post=23097"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}