{"id":20561,"date":"2026-11-09T16:23:04","date_gmt":"2026-11-09T13:23:04","guid":{"rendered":"https:\/\/azeidkgroup.com\/sa\/media-center\/"},"modified":"2026-11-10T16:24:44","modified_gmt":"2026-11-10T13:24:44","slug":"integrated-fire-life-safety-systems-testing","status":"publish","type":"post","link":"https:\/\/azeidkgroup.com\/en\/sa\/media-center\/integrated-fire-life-safety-systems-testing\/","title":{"rendered":"Integrated Fire and Life Safety Systems Testing Before Handover: Elevators, HVAC, Smoke Control and Doors Under NFPA 4"},"content":{"rendered":"\t\t<div data-elementor-type=\"wp-post\" data-elementor-id=\"20561\" class=\"elementor elementor-20561 elementor-20560 elementor-bc-flex-widget\" data-elementor-post-type=\"post\">\n\t\t\t\t<div class=\"elementor-element elementor-element-36bd9d7 e-con-full az-el-article e-flex e-con e-parent\" data-id=\"36bd9d7\" data-element_type=\"container\" data-e-type=\"container\">\n\t\t\t\t<div class=\"elementor-element elementor-element-adadc6c elementor-widget elementor-widget-text-editor\" data-id=\"adadc6c\" data-element_type=\"widget\" data-e-type=\"widget\" data-widget_type=\"text-editor.default\">\n\t\t\t\t<div class=\"elementor-widget-container\">\n\t\t\t\t\t\t\t\t\t<p class=\"az-intro\"><strong>Integrated systems testing<\/strong> proves that a single fire alarm actually drives everything designed to respond with it: elevator recall, HVAC shutdown, smoke exhaust and stair pressurization fans, door release and voice evacuation messages. NFPA 4 sets the framework for this end-to-end test, with an accountable team, a written plan and a final report.<\/p>\n<p>This guide is for project managers and consultants preparing for handover or a Civil Defense inspection in Saudi Arabia: what NFPA 4 asks for, who must attend, how to build the test plan, and what to observe at each interface. AZEIDK carries out this type of testing within the scope of each project as part of its <a href=\"\/en\/sa\/services\/testing-commissioning-handover\/\">testing, commissioning and handover<\/a> service.<\/p>\t\t\t\t\t\t\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t\t\t<div class=\"elementor-element elementor-element-3a85f47 elementor-widget elementor-widget-text-editor\" data-id=\"3a85f47\" data-element_type=\"widget\" data-e-type=\"widget\" data-widget_type=\"text-editor.default\">\n\t\t\t\t<div class=\"elementor-widget-container\">\n\t\t\t\t\t\t\t\t\t<div class=\"az-keybox\"><h2>Key takeaways<\/h2><ul><li>Testing each system on its own does not prove the systems work together; real failures tend to sit at the interfaces between contractors.<\/li><li>NFPA 4 (latest published edition: 2024) is the standard for integrated fire protection and life safety system testing. It works alongside NFPA 3, which covers commissioning.<\/li><li>An integrated testing agent (ITa) plans, schedules, coordinates and documents the test; the owner remains ultimately responsible.<\/li><li>The test plan is built from the approved cause and effect matrix and should include scenarios such as a fire during a loss of normal power.<\/li><li>Integrated tests are usually run input to output with no bypasses. Every issue is logged, corrected and retested.<\/li><\/ul><\/div>\t\t\t\t\t\t\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t\t\t<div class=\"elementor-element elementor-element-b526af2 elementor-widget elementor-widget-text-editor\" data-id=\"b526af2\" data-element_type=\"widget\" data-e-type=\"widget\" data-widget_type=\"text-editor.default\">\n\t\t\t\t<div class=\"elementor-widget-container\">\n\t\t\t\t\t\t\t\t\t<h2>What is integrated systems testing, and why isn&#8217;t testing each system enough?<\/h2>\n<p>On a large project, the fire alarm contractor installs the panel and modules, the elevator contractor installs the lift controllers, the HVAC contractor handles air handling units and smoke fans, and another trade installs door locks and access control. Each contractor tests and signs off its own system. A real fire, however, does not stay inside one system. A smoke detector in an elevator lobby signals the panel, the panel operates a module, the module changes a contact in the elevator controller, and the controller recalls the car.<\/p>\n<p>Integrated testing follows that whole chain. Industry guidance describes an end-to-end integrated test as a test of the response of interconnected systems to one input signal, verified at the actual outputs in the field rather than on the panel display alone. That is what separates it from <a href=\"\/en\/sa\/media-center\/fire-alarm-commissioning-testing\/\">fire alarm commissioning and acceptance testing<\/a>, which focuses on the alarm system itself: wiring, devices, batteries and sound levels.<\/p>\t\t\t\t\t\t\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t\t\t<div class=\"elementor-element elementor-element-e053b68 elementor-widget elementor-widget-text-editor\" data-id=\"e053b68\" data-element_type=\"widget\" data-e-type=\"widget\" data-widget_type=\"text-editor.default\">\n\t\t\t\t<div class=\"elementor-widget-container\">\n\t\t\t\t\t\t\t\t\t<h2>What does NFPA 4 require?<\/h2>\n<p>NFPA 4, <em>Standard for Integrated Fire Protection and Life Safety System Testing<\/em>, was first issued in 2015, when integrated testing was moved out of NFPA 3 and NFPA 3 became the commissioning document. The latest published edition is 2024, and the standard is in NFPA&#8217;s current revision cycle, so the specification should name the edition adopted for the project. NFPA 4 does not tell you how to test an individual system; that stays with the system standards such as NFPA 72 for fire alarm and NFPA 20 for fire pumps. Its subject is how the systems interact.<\/p>\n<h3>The integrated testing agent and the owner<\/h3>\n<p>The standard defines roles for the testing team. The integrated testing agent plans, schedules, coordinates, carries out and documents the testing, and needs advanced knowledge of how the interconnected systems are installed, operated and interfaced. The owner remains responsible and may delegate that responsibility in writing. One person can act as both fire commissioning agent and ITa if qualified for both roles.<\/p>\n<h3>The written test plan<\/h3>\n<p>A test plan typically covers verification that the installation matches the design, the systems included, required documentation, required attendees, the equipment to be tested, a functional input\/output matrix, the extent of testing and the retest frequency. The standard covers three occasions: an initial test at installation, periodic tests at the frequency set in the plan or the project&#8217;s adopted requirements, and testing after modifications to existing systems.<\/p>\n<h3>Where does NFPA 4 sit in the Saudi framework?<\/h3>\n<p>The binding reference in the Kingdom is the Saudi Fire Protection Code, SBC 801, part of the Saudi Building Code, together with the requirements of the General Directorate of Civil Defense. NFPA 4 is usually applied as a technical reference that the designer or consultant adopts in the project specification; once the specification calls for it, it becomes a contractual obligation. Confirm with the consultant and Civil Defense whether the SBC 801 edition adopted for the project sets any integrated testing requirement. For the findings inspectors raise most often, see <a href=\"\/en\/sa\/media-center\/civil-defense-inspection-notes-fix\/\">common Civil Defense inspection notes and how to fix them<\/a>.<\/p>\t\t\t\t\t\t\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t\t\t<div class=\"elementor-element elementor-element-78684b7 elementor-widget elementor-widget-text-editor\" data-id=\"78684b7\" data-element_type=\"widget\" data-e-type=\"widget\" data-widget_type=\"text-editor.default\">\n\t\t\t\t<div class=\"elementor-widget-container\">\n\t\t\t\t\t\t\t\t\t<h2>Who attends the integrated test?<\/h2>\n<p>Integrated tests often stall because one party is missing on the day and the sequence stops at its interface. The plan should name every attendee and their responsibility:<\/p>\n<div class=\"az-table-wrap\"><table><thead><tr><th>Party<\/th><th>Role during the test<\/th><\/tr><\/thead><tbody><tr><td>Integrated testing agent<\/td><td>Prepares the plan, runs the sequence, records results and issues, writes the final report<\/td><\/tr><tr><td>Fire alarm contractor<\/td><td>Activates input devices, monitors the panel and modules, resets between scenarios<\/td><\/tr><tr><td>Elevator contractor<\/td><td>Observes recall, each car&#8217;s status and controller indications<\/td><\/tr><tr><td>HVAC contractor<\/td><td>Observes unit shutdown, smoke fan and stair pressurization start-up, takes the measurements the design calls for<\/td><\/tr><tr><td>Door and access control contractor<\/td><td>Observes release of electric locks and magnetic door holders<\/td><\/tr><tr><td>Fire fighting contractor<\/td><td>Operates flow switches and test valves, observes fire pump signals<\/td><\/tr><tr><td>Electrical contractor<\/td><td>Cuts normal power for the power-failure scenario, observes transfer to the generator<\/td><\/tr><tr><td>Consultant and owner&#8217;s representative<\/td><td>Witness the test, accept results and approve corrective actions<\/td><\/tr><\/tbody><\/table><\/div>\t\t\t\t\t\t\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t\t\t<div class=\"elementor-element elementor-element-24aade8 elementor-widget elementor-widget-text-editor\" data-id=\"24aade8\" data-element_type=\"widget\" data-e-type=\"widget\" data-widget_type=\"text-editor.default\">\n\t\t\t\t<div class=\"elementor-widget-container\">\n\t\t\t\t\t\t\t\t\t<h2>How do you build the test plan from the cause and effect matrix?<\/h2>\n<p>The starting point is the approved <a href=\"\/en\/sa\/media-center\/fire-alarm-cause-and-effect-matrix\/\">cause and effect matrix<\/a>: every row is an input and every column is an output that must be seen in the field. We won&#8217;t repeat how to prepare the matrix here, but turning it into a test plan follows clear steps:<\/p>\n<ol><li><strong>Confirm readiness:<\/strong> each system has been tested and accepted on its own, and the panel holds the latest approved program. Any later program change means retesting the affected functions.<\/li><li><strong>Choose scenarios:<\/strong> one per fire zone or group of similar zones, plus specific scenarios for the main-floor elevator lobby, the machine room and the hoistway.<\/li><li><strong>Add failure scenarios:<\/strong> a common design-stage omission is a scenario such as a fire during a utility power outage.<\/li><li><strong>Write the expected result:<\/strong> for each scenario, list the expected outputs, their timing and how each will be verified in the field.<\/li><li><strong>Set the method:<\/strong> integrated tests are usually run input to output with no bypasses, operating the real equipment rather than simulating its signal.<\/li><\/ol>\t\t\t\t\t\t\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t\t\t<div class=\"elementor-element elementor-element-7518777 elementor-widget elementor-widget-text-editor\" data-id=\"7518777\" data-element_type=\"widget\" data-e-type=\"widget\" data-widget_type=\"text-editor.default\">\n\t\t\t\t<div class=\"elementor-widget-container\">\n\t\t\t\t\t\t\t\t\t<h2>What is tested at each interface?<\/h2>\n<p>The table summarises the most common interfaces in Saudi buildings and what to watch at each. The exact outputs for any project come from its approved matrix.<\/p>\n<div class=\"az-table-wrap\"><table><thead><tr><th>Interface<\/th><th>Typical input<\/th><th>What to verify in the field<\/th><\/tr><\/thead><tbody><tr><td>Elevator recall<\/td><td>Detector in the elevator lobby, machine room or hoistway<\/td><td>Cars return to the designated level, or to the alternate level when the alarm comes from the designated-level lobby; firefighter indicator status<\/td><\/tr><tr><td>HVAC<\/td><td>Zone alarm or duct smoke detector<\/td><td>The specified units actually stop, not just a command shown on the panel<\/td><\/tr><tr><td>Smoke control and stair pressurization<\/td><td>Alarm in a specific fire zone<\/td><td>The correct fans for that zone start; the measurements required by the design are recorded<\/td><\/tr><tr><td>Doors and access control<\/td><td>General or zoned alarm<\/td><td>Magnetically held doors close; electric locks on egress routes release<\/td><\/tr><tr><td>Voice evacuation and PA<\/td><td>Confirmed alarm<\/td><td>The correct message plays in the correct zones in the designed order<\/td><\/tr><tr><td>Sprinklers and fire pumps<\/td><td>Flow switch or pump pressure<\/td><td>The correct alarm or supervisory signal reaches the panel and linked parties<\/td><\/tr><tr><td>Power failure<\/td><td>Normal power disconnected<\/td><td>Designed functions continue on the generator or batteries<\/td><\/tr><\/tbody><\/table><\/div>\n<h3>Elevators<\/h3>\n<p>Under ASME A17.1 and NFPA 72 (details vary by adopted edition), Phase I recall is initiated by detectors in elevator lobbies, machine rooms, control spaces and hoistways. Cars return to the designated level, or to an alternate level if the alarm comes from the designated-level lobby detector. When the alarm comes from the hoistway or machine room, the firefighter&#8217;s helmet symbol flashes instead of staying lit in the cars served by that hoistway or machine room. Each detector type therefore needs its own scenario, not one scenario for the whole building.<\/p>\n<h3>HVAC and smoke exhaust<\/h3>\n<p>Fire alarm commands often pass through the building management system, so the test must confirm the real state of each unit rather than a message on a BMS screen. A mechanical engineer or smoke control specialist should help write the smoke exhaust and stair pressurization scenarios. For background, see <a href=\"\/en\/sa\/media-center\/smoke-control-stair-pressurization\/\">smoke control and stair pressurization<\/a> and <a href=\"\/en\/sa\/media-center\/bms-fire-system-integration\/\">BMS and fire alarm integration<\/a>.<\/p>\n<h3>Doors<\/h3>\n<p>Verify that magnetic holders release their doors on alarm and that electric locks on egress routes unlock. Repeat the check on loss of power, because these interfaces are designed to fail safe.<\/p>\t\t\t\t\t\t\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t\t\t<div class=\"elementor-element elementor-element-fafcee6 elementor-widget elementor-widget-text-editor\" data-id=\"fafcee6\" data-element_type=\"widget\" data-e-type=\"widget\" data-widget_type=\"text-editor.default\">\n\t\t\t\t<div class=\"elementor-widget-container\">\n\t\t\t\t\t\t\t\t\t<h2>Test day: sequence, witnesses and records<\/h2>\n<p>The day opens with a short briefing in which the testing agent walks through the plan and the communication channels between teams, and confirms that occupants and any monitoring centre have been notified. Scenarios then run in order; each observer records what they saw at their location against the expected result, and systems are restored to normal between scenarios.<\/p>\n<p>NFPA 4 calls for clear records, typically including:<\/p>\n<ul><li><strong>Issues log:<\/strong> every fault or deviation from the expected result, with the date found and the date resolved.<\/li><li><strong>Corrective action reports:<\/strong> for every result that does not match the design.<\/li><li><strong>Final report:<\/strong> a summary of results and the status of each system, with a copy of the test plan.<\/li><\/ul>\n<p>These records join the handover file alongside as-built drawings and O&amp;M manuals, as described in our guide to <a href=\"\/en\/sa\/media-center\/fire-systems-handover-documents-as-built-om\/\">fire systems handover documents<\/a>. The owner keeps them in one place, available to the authority on request.<\/p>\t\t\t\t\t\t\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t\t\t<div class=\"elementor-element elementor-element-63453c3 elementor-widget elementor-widget-text-editor\" data-id=\"63453c3\" data-element_type=\"widget\" data-e-type=\"widget\" data-widget_type=\"text-editor.default\">\n\t\t\t\t<div class=\"elementor-widget-container\">\n\t\t\t\t\t\t\t\t\t<h2>Common mistakes in integrated systems testing<\/h2>\n<ul><li>Starting the integrated test before each system has been accepted individually, then losing hours on single-system faults.<\/li><li>Treating the fire alarm panel display as proof that a command was executed, with no observer at the equipment.<\/li><li>Testing one scenario per system instead of one per zone or zone group.<\/li><li>Leaving out the power-failure and generator transfer scenario.<\/li><li>Changing the panel program after the test without retesting the affected functions.<\/li><li>A missing contractor representative, or no consultant present to accept the results.<\/li><li>Closing issues verbally without logging and retesting them.<\/li><\/ul>\t\t\t\t\t\t\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t\t\t<div class=\"elementor-element elementor-element-b6fa92d elementor-widget elementor-widget-text-editor\" data-id=\"b6fa92d\" data-element_type=\"widget\" data-e-type=\"widget\" data-widget_type=\"text-editor.default\">\n\t\t\t\t<div class=\"elementor-widget-container\">\n\t\t\t\t\t\t\t\t\t<h2>Frequently asked questions<\/h2>\n<div class=\"az-faq\"><details class=\"az-faq__item\"><summary><h3>What is the difference between NFPA 3 and NFPA 4?<\/h3><\/summary><p>NFPA 3 covers the commissioning process for fire protection and life safety systems across all phases. NFPA 4 covers integrated testing, which proves the interconnected systems work together.<\/p><\/details><details class=\"az-faq__item\"><summary><h3>Is NFPA 4 mandatory in Saudi Arabia?<\/h3><\/summary><p>The binding references are SBC 801 and Civil Defense requirements. NFPA 4 becomes a contractual requirement when the project specification or the consultant calls for it; confirm any integrated testing requirement in the adopted code edition with the consultant.<\/p><\/details><details class=\"az-faq__item\"><summary><h3>Isn&#8217;t testing the alarm against the matrix enough?<\/h3><\/summary><p>Not always. Testing the matrix at the panel proves the commands were sent; integrated testing proves the equipment in the field actually responded.<\/p><\/details><details class=\"az-faq__item\"><summary><h3>When is the integrated test repeated?<\/h3><\/summary><p>NFPA 4 covers the initial test, periodic tests at the frequency set in the test plan or adopted requirements, and retesting after any modification that affects interconnected functions.<\/p><\/details><details class=\"az-faq__item\"><summary><h3>Who prepares the test plan?<\/h3><\/summary><p>The integrated testing agent appointed by the owner, with input from the trades involved. The consultant reviews and approves it before testing.<\/p><\/details><\/div>\t\t\t\t\t\t\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t\t\t<div class=\"elementor-element elementor-element-29020ca elementor-widget elementor-widget-text-editor\" data-id=\"29020ca\" data-element_type=\"widget\" data-e-type=\"widget\" data-widget_type=\"text-editor.default\">\n\t\t\t\t<div class=\"elementor-widget-container\">\n\t\t\t\t\t\t\t\t\t<h2>Conclusion<\/h2>\n<p>Integrated systems testing is the last link before handover, and it finds what no single contractor&#8217;s test will. NFPA 4 gives it a practical structure: an accountable testing agent, a written plan built from the matrix, input-to-output execution, an issues log and a final report. Planning it early, with attendees and scenarios agreed, saves days of retesting at handover.<\/p>\t\t\t\t\t\t\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t\t\t<div class=\"elementor-element elementor-element-0706887 elementor-widget elementor-widget-text-editor\" data-id=\"0706887\" data-element_type=\"widget\" data-e-type=\"widget\" data-widget_type=\"text-editor.default\">\n\t\t\t\t<div class=\"elementor-widget-container\">\n\t\t\t\t\t\t\t\t\t<p class=\"az-cta\"><strong>Handover coming up?<\/strong> Send us your cause and effect matrix and the list of interconnected systems, and we will help you prepare the test plan, run the interface scenarios and document the results. <a href=\"\/en\/sa\/contact\/\">Contact the AZEIDK team<\/a><\/p>\t\t\t\t\t\t\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t\t\t<div class=\"elementor-element elementor-element-f9de70b elementor-widget elementor-widget-text-editor\" data-id=\"f9de70b\" data-element_type=\"widget\" data-e-type=\"widget\" data-widget_type=\"text-editor.default\">\n\t\t\t\t<div class=\"elementor-widget-container\">\n\t\t\t\t\t\t\t\t\t<div class=\"az-source\"><strong>Sources:<\/strong> <a href=\"https:\/\/iaeimagazine.org\/standards\/nfpa-4-standard-for-integrated-fire-protection-and-life-safety-system-testing\/\" rel=\"noopener\" target=\"_blank\">NFPA 4: Standard for Integrated Fire Protection and Life Safety System Testing<\/a> (IAEI Magazine), <a href=\"https:\/\/www.csemag.com\/using-nfpa-3-and-4-to-commission-fire-protection-systems\/\" rel=\"noopener\" target=\"_blank\">Using NFPA 3 and 4 to commission fire protection systems<\/a> (Consulting-Specifying Engineer), <a href=\"https:\/\/www.fire-police-ems.com\/NFPA4-2024.shtml\" rel=\"noopener\" target=\"_blank\">NFPA 4 2024 Integrated Fire Protection and Life Safety System Testing<\/a> (Fire-Police-EMS), <a href=\"https:\/\/ehs.ucsf.edu\/node\/1901\" rel=\"noopener\" target=\"_blank\">Fire Prevention Design Bulletin #0003: Integrated Fire Protection and Life Safety System Testing<\/a> (UCSF EH&amp;S), <a href=\"https:\/\/www.coffman.com\/news\/nfpa-4-understanding-integrated-system-testing\/\" rel=\"noopener\" target=\"_blank\">NFPA 4: Understanding Integrated System Testing<\/a> (Coffman Engineers), <a href=\"https:\/\/ewh.ieee.org\/r3\/atlanta\/ias\/Interfacing_Fire_Alarm_and_Elevators.pdf\" rel=\"noopener\" target=\"_blank\">Interfacing Fire Alarm and Elevators (NFPA 72 \/ ASME A17.1)<\/a> (IEEE Atlanta IAS), <a href=\"https:\/\/docinfofiles.nfpa.org\/files\/AboutTheCodes\/4\/4_A2026_CMI_AAA_FD_PIresponses.pdf\" rel=\"noopener\" target=\"_blank\">NFPA 4 A2026 First Draft public input responses<\/a> (NFPA)<\/div>\t\t\t\t\t\t\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t","protected":false},"excerpt":{"rendered":"<p>Integrated systems testing before handover to NFPA 4: testing agent, a plan from the cause and effect matrix, elevator recall, HVAC shutdown, door release.<\/p>\n","protected":false},"author":0,"featured_media":20845,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"_acf_changed":false,"footnotes":""},"categories":[221,329],"tags":[],"azeidk_region":[223],"class_list":["post-20561","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-azeidk-articles","category-operation-maintenance-en"],"acf":[],"_links":{"self":[{"href":"https:\/\/azeidkgroup.com\/en\/wp-json\/wp\/v2\/posts\/20561","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/azeidkgroup.com\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/azeidkgroup.com\/en\/wp-json\/wp\/v2\/types\/post"}],"replies":[{"embeddable":true,"href":"https:\/\/azeidkgroup.com\/en\/wp-json\/wp\/v2\/comments?post=20561"}],"version-history":[{"count":1,"href":"https:\/\/azeidkgroup.com\/en\/wp-json\/wp\/v2\/posts\/20561\/revisions"}],"predecessor-version":[{"id":20622,"href":"https:\/\/azeidkgroup.com\/en\/wp-json\/wp\/v2\/posts\/20561\/revisions\/20622"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/azeidkgroup.com\/en\/wp-json\/wp\/v2\/media\/20845"}],"wp:attachment":[{"href":"https:\/\/azeidkgroup.com\/en\/wp-json\/wp\/v2\/media?parent=20561"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/azeidkgroup.com\/en\/wp-json\/wp\/v2\/categories?post=20561"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/azeidkgroup.com\/en\/wp-json\/wp\/v2\/tags?post=20561"},{"taxonomy":"azeidk_region","embeddable":true,"href":"https:\/\/azeidkgroup.com\/en\/wp-json\/wp\/v2\/azeidk_region?post=20561"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}