{"id":19558,"date":"2026-11-06T19:20:09","date_gmt":"2026-11-06T16:20:09","guid":{"rendered":"https:\/\/azeidkgroup.com\/sa\/media-center\/"},"modified":"2026-11-11T22:16:35","modified_gmt":"2026-11-11T19:16:35","slug":"compare-fire-system-quotations","status":"publish","type":"post","link":"https:\/\/azeidkgroup.com\/en\/sa\/media-center\/compare-fire-system-quotations\/","title":{"rendered":"How to Compare Fire System Quotations from Contractors"},"content":{"rendered":"\t\t<div data-elementor-type=\"wp-post\" data-elementor-id=\"19558\" class=\"elementor elementor-19558 elementor-19557 elementor-bc-flex-widget\" data-elementor-post-type=\"post\">\n\t\t\t\t<div class=\"elementor-element elementor-element-da73203 e-con-full az-el-article e-flex e-con e-parent\" data-id=\"da73203\" data-element_type=\"container\" data-e-type=\"container\">\n\t\t\t\t<div class=\"elementor-element elementor-element-e50e9c6 elementor-widget elementor-widget-text-editor\" data-id=\"e50e9c6\" data-element_type=\"widget\" data-e-type=\"widget\" data-widget_type=\"text-editor.default\">\n\t\t\t\t<div class=\"elementor-widget-container\">\n\t\t\t\t\t\t\t\t\t<p class=\"az-intro\">When three or more offers arrive for a fire protection project, many owners start by comparing the totals. But the lowest offer may be lower because it leaves out items you will be asked to pay for later. The right question when you <strong>compare fire system quotations<\/strong> is whether the offers cover the same scope, with the same materials and the same obligations up to handover.<\/p>\n<p>This article gives a practical method for comparing contractor offers and a checklist covering scope, BOQ, brands and models, submittals, testing, warranty, maintenance and exclusions, without going into price figures.<\/p>\t\t\t\t\t\t\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t\t\t<div class=\"elementor-element elementor-element-14606ef elementor-widget elementor-widget-text-editor\" data-id=\"14606ef\" data-element_type=\"widget\" data-e-type=\"widget\" data-widget_type=\"text-editor.default\">\n\t\t\t\t<div class=\"elementor-widget-container\">\n\t\t\t\t\t\t\t\t\t<div class=\"az-keybox\"><h2>Key takeaways<\/h2><ul><li>Fix the pricing basis before offers arrive: the same drawings, the same specification and the same BOQ revision.<\/li><li>Ask for the brand and model of every main item, not &#8220;or equivalent&#8221; alone.<\/li><li>Confirm the offer covers submittals, testing and commissioning, handover documents and Civil Defense approval where it is in scope.<\/li><li>Read the exclusions as carefully as the priced items.<\/li><li>Turn differences into written questions and get written answers before award.<\/li><\/ul><\/div>\t\t\t\t\t\t\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t\t\t<div class=\"elementor-element elementor-element-b4a0f79 elementor-widget elementor-widget-text-editor\" data-id=\"b4a0f79\" data-element_type=\"widget\" data-e-type=\"widget\" data-widget_type=\"text-editor.default\">\n\t\t\t\t<div class=\"elementor-widget-container\">\n\t\t\t\t\t\t\t\t\t<h2>Why comparing totals is not enough<\/h2>\n<p>The total is the result of several decisions inside the offer: what the contractor included, what materials it assumed and what it excluded. A contractor that prices only pipe and sprinklers and another that includes hangers, painting, signage and testing are pricing two different jobs. A fair comparison starts by making the offers comparable.<\/p>\t\t\t\t\t\t\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t\t\t<div class=\"elementor-element elementor-element-0e8341c elementor-widget elementor-widget-text-editor\" data-id=\"0e8341c\" data-element_type=\"widget\" data-e-type=\"widget\" data-widget_type=\"text-editor.default\">\n\t\t\t\t<div class=\"elementor-widget-container\">\n\t\t\t\t\t\t\t\t\t<h2>Set a common basis before opening offers<\/h2>\n<ul><li><strong>Tender documents:<\/strong> send every contractor the drawings with their revision number, the technical specification and the same BOQ version.<\/li><li><strong>Site visit:<\/strong> for existing buildings or modification work, give everyone a site visit, since site conditions affect the method of work.<\/li><li><strong>Clarifications:<\/strong> collect contractors&#8217; questions and send the answers to all, so no one prices on a different assumption.<\/li><li><strong>One pricing format:<\/strong> ask for pricing on the same BOQ with columns for brand, model and country of origin, and a column for remarks.<\/li><\/ul>\n<p>If drawings are not ready yet, defining the scope first saves a lot of time. That is the purpose of AZEIDK&#8217;s <a href=\"\/en\/sa\/services\/assessment-of-existing-systems-scope-of-work-definition\/\">assessment of existing systems and scope of work definition<\/a> service. Our guide to the <a href=\"\/en\/sa\/media-center\/site-technical-survey-fire-cctv\/\">site survey before pricing fire systems<\/a> explains what is checked and what the owner should prepare.<\/p>\t\t\t\t\t\t\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t\t\t<div class=\"elementor-element elementor-element-24b2bea elementor-widget elementor-widget-text-editor\" data-id=\"24b2bea\" data-element_type=\"widget\" data-e-type=\"widget\" data-widget_type=\"text-editor.default\">\n\t\t\t\t<div class=\"elementor-widget-container\">\n\t\t\t\t\t\t\t\t\t<h2>A checklist for comparing offers<\/h2>\n<p>Use the table for each offer and mark every item as included, not included or unclear.<\/p>\n<div class=\"az-table-wrap\"><table><thead><tr><th>Item<\/th><th>What to check<\/th><th>Question for the contractor<\/th><\/tr><\/thead><tbody><tr><td>Scope<\/td><td>Systems included: sprinklers, hose cabinets, pumps, alarm, special suppression, extinguishers<\/td><td>Does the offer include every system on the drawings?<\/td><\/tr><tr><td>BOQ<\/td><td>Quantities and units, lump-sum items, missing items<\/td><td>Why do your quantities differ from the issued BOQ?<\/td><\/tr><tr><td>Brands and models<\/td><td>Brand and model of each main item and its listing or approval status<\/td><td>Which model do you mean by &#8220;or equivalent&#8221;?<\/td><\/tr><tr><td>Submittals and shop drawings<\/td><td>Preparing and submitting submittals and shop drawings for approval<\/td><td>Are revisions after consultant comments included?<\/td><\/tr><tr><td>Testing and commissioning<\/td><td>Hydrostatic test, flushing, pump start-up, alarm testing<\/td><td>Which tests are included, and who provides water and power during them?<\/td><\/tr><tr><td>Approvals<\/td><td>Follow-up of Civil Defense approval and what acceptance requires<\/td><td>Is approval follow-up and closing comments in scope?<\/td><\/tr><tr><td>Handover documents<\/td><td>As-built drawings, O&amp;M manuals, material certificates<\/td><td>Which documents will you hand over at the end?<\/td><\/tr><tr><td>Warranty<\/td><td>Period, coverage and who gives it (contractor or manufacturer)<\/td><td>What voids the warranty?<\/td><\/tr><tr><td>Maintenance<\/td><td>A maintenance period after handover, or a separate maintenance contract<\/td><td>Which visits and tests does the maintenance period include?<\/td><\/tr><tr><td>Exclusions<\/td><td>Civil works, power supply, openings, false ceilings, permits<\/td><td>Who carries out each excluded item, and at whose cost?<\/td><\/tr><\/tbody><\/table><\/div>\t\t\t\t\t\t\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t\t\t<div class=\"elementor-element elementor-element-a663f2a elementor-widget elementor-widget-text-editor\" data-id=\"a663f2a\" data-element_type=\"widget\" data-e-type=\"widget\" data-widget_type=\"text-editor.default\">\n\t\t\t\t<div class=\"elementor-widget-container\">\n\t\t\t\t\t\t\t\t\t<h2>How to read the BOQ in an offer<\/h2>\n<p>The BOQ is where most differences appear. Watch for:<\/p>\n<ul><li><strong>Lump-sum items:<\/strong> a single price with no breakdown is hard to compare and hard to review when the design changes.<\/li><li><strong>Missing items:<\/strong> such as hangers and supports, wall sleeves, painting and colour coding, signage and the fire department connection.<\/li><li><strong>Changed quantities:<\/strong> if a contractor changes quantities, ask why. It may reveal an error in your BOQ or a gap in the offer.<\/li><li><strong>Provisional items:<\/strong> keep items executed only if needed separate from the core items in the comparison.<\/li><\/ul>\t\t\t\t\t\t\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t\t\t<div class=\"elementor-element elementor-element-634efc8 elementor-widget elementor-widget-text-editor\" data-id=\"634efc8\" data-element_type=\"widget\" data-e-type=\"widget\" data-widget_type=\"text-editor.default\">\n\t\t\t\t<div class=\"elementor-widget-container\">\n\t\t\t\t\t\t\t\t\t<h2>Brands, models and listings<\/h2>\n<p>An offer that says &#8220;approved sprinklers&#8221; without a brand and model cannot be compared with one that names the model and its listing file number. For each main item, such as pumps, sprinklers, valves, alarm panels and detectors, ask for the brand, the model and its UL listing or FM approval status where the specification requires it. Listings are verified in the official directories of both bodies, not in catalogues.<\/p>\n<p>In Saudi Arabia, the SASO Technical Regulation for Fire Control Materials and Equipment requires a certificate of conformity for covered products, including extinguishing equipment and fire pumps, before they are placed on the market. Ask the contractor about certificates of conformity for the covered items in the offer.<\/p>\t\t\t\t\t\t\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t\t\t<div class=\"elementor-element elementor-element-cc3cbb8 elementor-widget elementor-widget-text-editor\" data-id=\"cc3cbb8\" data-element_type=\"widget\" data-e-type=\"widget\" data-widget_type=\"text-editor.default\">\n\t\t\t\t<div class=\"elementor-widget-container\">\n\t\t\t\t\t\t\t\t\t<h2>Submittals, testing and handover<\/h2>\n<p>Preparing submittals and shop drawings is part of the work, not a free extra outside the scope. Confirm the offer covers preparing and revising them until approval, as explained in <a href=\"\/en\/sa\/media-center\/fire-protection-shop-drawings\/\">fire protection shop drawings<\/a>.<\/p>\n<p>For testing, ask each contractor to list the tests included and the technical reference for each, per the specification adopted on the project. At the end, the contractor should hand over a complete file with as-built drawings and O&amp;M manuals, as covered in <a href=\"\/en\/sa\/media-center\/fire-systems-handover-documents-as-built-om\/\">fire system handover documents<\/a>.<\/p>\t\t\t\t\t\t\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t\t\t<div class=\"elementor-element elementor-element-a1458ef elementor-widget elementor-widget-text-editor\" data-id=\"a1458ef\" data-element_type=\"widget\" data-e-type=\"widget\" data-widget_type=\"text-editor.default\">\n\t\t\t\t<div class=\"elementor-widget-container\">\n\t\t\t\t\t\t\t\t\t<h2>Warranty, maintenance and exclusions<\/h2>\n<p>Compare the warranty period and its start: from provisional handover or from delivery? Does it cover materials only, or materials and labour? Then compare maintenance after handover. Some offers include a maintenance period and others leave it to a separate contract. In Saudi Arabia the maintenance contract is linked to renewing the safety licence on the Salamah platform, as explained in <a href=\"\/en\/sa\/media-center\/salamah-licence-renewal-maintenance-contract\/\">Salamah licence renewal and the maintenance contract<\/a>.<\/p>\n<p>Finally, read the exclusions line by line. Every excluded item will still be done. The question is who does it and who pays.<\/p>\t\t\t\t\t\t\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t\t\t<div class=\"elementor-element elementor-element-c58d2a5 elementor-widget elementor-widget-text-editor\" data-id=\"c58d2a5\" data-element_type=\"widget\" data-e-type=\"widget\" data-widget_type=\"text-editor.default\">\n\t\t\t\t<div class=\"elementor-widget-container\">\n\t\t\t\t\t\t\t\t\t<h2>From comparison to award<\/h2>\n<p>Once the checklist is complete for each offer, the &#8220;not included&#8221; and &#8220;unclear&#8221; marks become structured work instead of a price negotiation alone:<\/p>\n<ol><li><strong>Clarification log:<\/strong> write each contractor&#8217;s specific questions in one sheet, with the item number and the reply date required.<\/li><li><strong>Clarification meeting:<\/strong> discuss the replies with each contractor separately and record what is agreed in minutes signed by both sides.<\/li><li><strong>Revised offer:<\/strong> ask each contractor to update its offer for items added or removed, so all offers stand on one basis.<\/li><li><strong>Final comparison:<\/strong> compare the revised offers on scope, models, programme and warranty, then price.<\/li><li><strong>Attach the replies to the contract:<\/strong> make the clarification log and revised offer part of the contract documents, so agreed points are not reopened during execution.<\/li><\/ol>\n<p>With these steps, the award decision can be explained to anyone who reviews it later, whether the owner, the consultant or the procurement team.<\/p>\t\t\t\t\t\t\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t\t\t<div class=\"elementor-element elementor-element-2c169be elementor-widget elementor-widget-text-editor\" data-id=\"2c169be\" data-element_type=\"widget\" data-e-type=\"widget\" data-widget_type=\"text-editor.default\">\n\t\t\t\t<div class=\"elementor-widget-container\">\n\t\t\t\t\t\t\t\t\t<h2>Common mistakes<\/h2>\n<ul><li><strong>Awarding on the total without a comparison sheet:<\/strong> differences come back later as variations.<\/li><li><strong>Accepting &#8220;or equivalent&#8221; without a model:<\/strong> it opens the door to a model that does not meet the specification.<\/li><li><strong>Overlooking exclusions:<\/strong> especially power supply to pumps and panels, and civil works.<\/li><li><strong>Payments not tied to clear milestones:<\/strong> such as submittal approval, delivery, installation, testing and handover.<\/li><li><strong>Judging the price without judging the contractor:<\/strong> a good offer from an unqualified contractor is still a risk. We cover the criteria in <a href=\"\/en\/sa\/media-center\/evaluate-fire-protection-contractor-saudi\/\">how to evaluate a fire protection contractor<\/a>.<\/li><\/ul>\t\t\t\t\t\t\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t\t\t<div class=\"elementor-element elementor-element-3bb7a3a elementor-widget elementor-widget-text-editor\" data-id=\"3bb7a3a\" data-element_type=\"widget\" data-e-type=\"widget\" data-widget_type=\"text-editor.default\">\n\t\t\t\t<div class=\"elementor-widget-container\">\n\t\t\t\t\t\t\t\t\t<h2>Frequently asked questions<\/h2><div class=\"az-faq\"><details class=\"az-faq__item\"><summary><h3>How many offers do I need?<\/h3><\/summary><p>There is no fixed number for private projects. What matters is that all offers are based on the same documents so the comparison means something.<\/p><\/details><details class=\"az-faq__item\"><summary><h3>Is the lowest offer the best?<\/h3><\/summary><p>Not necessarily. It may be lower because it excludes items or assumes different materials. Compare after aligning scope and materials.<\/p><\/details><details class=\"az-faq__item\"><summary><h3>What if contractors&#8217; quantities differ?<\/h3><\/summary><p>Ask each contractor to explain the difference and review quantities with the designer or consultant before award.<\/p><\/details><details class=\"az-faq__item\"><summary><h3>Should the contractor name the brand in the offer?<\/h3><\/summary><p>It is advisable for main items, because brand and model decide compliance with the specification, ease of approval and maintenance.<\/p><\/details><details class=\"az-faq__item\"><summary><h3>Is Civil Defense approval usually part of the offer?<\/h3><\/summary><p>It depends on the contract. The offer should state clearly whether approval follow-up is in scope.<\/p><\/details><\/div>\t\t\t\t\t\t\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t\t\t<div class=\"elementor-element elementor-element-df977de elementor-widget elementor-widget-text-editor\" data-id=\"df977de\" data-element_type=\"widget\" data-e-type=\"widget\" data-widget_type=\"text-editor.default\">\n\t\t\t\t<div class=\"elementor-widget-container\">\n\t\t\t\t\t\t\t\t\t<h2>Conclusion<\/h2>\n<p>Comparing fire system quotations starts by fixing the pricing basis, then reviewing scope, BOQ, models, submittals, testing, warranty, maintenance and exclusions item by item. Only then does comparing the numbers become fair. Put everything agreed in writing, since it is what you will refer to at acceptance and in any dispute during execution.<\/p>\t\t\t\t\t\t\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t\t\t<div class=\"elementor-element elementor-element-7458282 elementor-widget elementor-widget-text-editor\" data-id=\"7458282\" data-element_type=\"widget\" data-e-type=\"widget\" data-widget_type=\"text-editor.default\">\n\t\t\t\t<div class=\"elementor-widget-container\">\n\t\t\t\t\t\t\t\t\t<p class=\"az-cta\"><strong>Want your scope reviewed before you request offers?<\/strong> Send us the drawings and BOQ, and we will help you define the scope and the models required for each item. See our <a href=\"\/en\/sa\/services\/technical-selection-of-systems-equipment\/\">technical selection of systems and equipment<\/a> service or <a href=\"\/en\/sa\/contact\/\">talk to the AZEIDK team<\/a><\/p>\t\t\t\t\t\t\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t\t\t<div class=\"elementor-element elementor-element-f10ff0e elementor-widget elementor-widget-text-editor\" data-id=\"f10ff0e\" data-element_type=\"widget\" data-e-type=\"widget\" data-widget_type=\"text-editor.default\">\n\t\t\t\t<div class=\"elementor-widget-container\">\n\t\t\t\t\t\t\t\t\t<div class=\"az-source\"><strong>References:<\/strong> <a href=\"https:\/\/saso.gov.sa\/en\/Laws-And-Regulations\/Technical_regulations\/Documents\/TR%20-%20Fire%20Control%20Materials%20and%20Equipment.pdf\" rel=\"noopener\" target=\"_blank\">Technical Regulation for Fire Control Materials and Equipment<\/a> (SASO); <a href=\"https:\/\/www.nfpa.org\/codes-and-standards\/nfpa-13-standard-development\/13\" rel=\"noopener\" target=\"_blank\">NFPA 13, Standard for the Installation of Sprinkler Systems<\/a> (NFPA); <a href=\"https:\/\/www.nfpa.org\/codes-and-standards\/nfpa-25-standard-development\/25\" rel=\"noopener\" target=\"_blank\">NFPA 25, Inspection, Testing, and Maintenance of Water-Based Fire Protection Systems<\/a> (NFPA); <a href=\"https:\/\/productiq.ulprospector.com\/\" rel=\"noopener\" target=\"_blank\">UL Product iQ<\/a> (UL Solutions); <a href=\"https:\/\/www.approvalguide.com\/\" rel=\"noopener\" target=\"_blank\">FM Approval Guide<\/a> (FM Approvals)<\/div>\t\t\t\t\t\t\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t","protected":false},"excerpt":{"rendered":"<p>How to compare fire system quotations: a checklist for scope, BOQ, brands and models, submittals, testing, warranty, maintenance and exclusions before award.<\/p>\n","protected":false},"author":0,"featured_media":20953,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"_acf_changed":false,"footnotes":""},"categories":[221,325],"tags":[],"azeidk_region":[223],"class_list":["post-19558","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-azeidk-articles","category-buyers-guide-en"],"acf":[],"_links":{"self":[{"href":"https:\/\/azeidkgroup.com\/en\/wp-json\/wp\/v2\/posts\/19558","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/azeidkgroup.com\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/azeidkgroup.com\/en\/wp-json\/wp\/v2\/types\/post"}],"replies":[{"embeddable":true,"href":"https:\/\/azeidkgroup.com\/en\/wp-json\/wp\/v2\/comments?post=19558"}],"version-history":[{"count":2,"href":"https:\/\/azeidkgroup.com\/en\/wp-json\/wp\/v2\/posts\/19558\/revisions"}],"predecessor-version":[{"id":23646,"href":"https:\/\/azeidkgroup.com\/en\/wp-json\/wp\/v2\/posts\/19558\/revisions\/23646"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/azeidkgroup.com\/en\/wp-json\/wp\/v2\/media\/20953"}],"wp:attachment":[{"href":"https:\/\/azeidkgroup.com\/en\/wp-json\/wp\/v2\/media?parent=19558"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/azeidkgroup.com\/en\/wp-json\/wp\/v2\/categories?post=19558"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/azeidkgroup.com\/en\/wp-json\/wp\/v2\/tags?post=19558"},{"taxonomy":"azeidk_region","embeddable":true,"href":"https:\/\/azeidkgroup.com\/en\/wp-json\/wp\/v2\/azeidk_region?post=19558"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}