{"id":19397,"date":"2026-11-05T23:07:23","date_gmt":"2026-11-05T20:07:23","guid":{"rendered":"https:\/\/azeidkgroup.com\/sa\/media-center\/"},"modified":"2026-11-10T16:20:41","modified_gmt":"2026-11-10T13:20:41","slug":"fire-alarm-periodic-inspection-maintenance-saudi","status":"publish","type":"post","link":"https:\/\/azeidkgroup.com\/en\/sa\/media-center\/fire-alarm-periodic-inspection-maintenance-saudi\/","title":{"rendered":"Fire Alarm Maintenance: Periodic Inspection and Testing Under NFPA 72 and SBC 801"},"content":{"rendered":"\t\t<div data-elementor-type=\"wp-post\" data-elementor-id=\"19397\" class=\"elementor elementor-19397 elementor-19396 elementor-bc-flex-widget\" data-elementor-post-type=\"post\">\n\t\t\t\t<div class=\"elementor-element elementor-element-e36df65 e-con-full az-el-article e-flex e-con e-parent\" data-id=\"e36df65\" data-element_type=\"container\" data-e-type=\"container\">\n\t\t\t\t<div class=\"elementor-element elementor-element-77ccaf2 elementor-widget elementor-widget-text-editor\" data-id=\"77ccaf2\" data-element_type=\"widget\" data-e-type=\"widget\" data-widget_type=\"text-editor.default\">\n\t\t\t\t<div class=\"elementor-widget-container\">\n\t\t\t\t\t\t\t\t\t<p class=\"az-intro\">The installer&#8217;s job ends at handover, but the responsibility for keeping the system ready starts that same day. <strong>Fire alarm maintenance<\/strong> after handover is what makes sure a detector that passed acceptance two years ago still sees smoke, that the batteries can still run the panel during a power cut, and that the alarm can still be heard on every floor.<\/p>\n<p>This guide is for facility managers and building owners in Saudi Arabia. It covers the periodic inspection and testing programme in Chapter 14 of NFPA 72, where it sits next to the Saudi Fire Code SBC 801, and what a maintenance visit and its report should include. See the scope of AZEIDK&#8217;s <a href=\"\/en\/sa\/services\/annual-maintenance-contracts\/\">preventive and periodic maintenance<\/a> service and our <a href=\"\/en\/sa\/solutions\/fire-alarm-systems\/\">fire alarm system solutions<\/a>, which AZEIDK designs, installs and tests.<\/p>\t\t\t\t\t\t\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t\t\t<div class=\"elementor-element elementor-element-7a3eb53 elementor-widget elementor-widget-text-editor\" data-id=\"7a3eb53\" data-element_type=\"widget\" data-e-type=\"widget\" data-widget_type=\"text-editor.default\">\n\t\t\t\t<div class=\"elementor-widget-container\">\n\t\t\t\t\t\t\t\t\t<div class=\"az-keybox\"><h2>Key takeaways<\/h2><ul><li>SBC 801 is the mandatory Saudi reference and the General Directorate of Civil Defense enforces it. NFPA 72 is the technical reference for the inspection and testing programme.<\/li><li>NFPA 72 separates visual inspection from functional testing. Chapter 14 gives each its own frequency table.<\/li><li>Most field devices are inspected every six months and tested once a year. VRLA battery tests are semiannual.<\/li><li>Smoke detector sensitivity testing is a separate programme from the annual functional test. One does not replace the other.<\/li><li>The visit report and maintenance log prove the programme was carried out. They are usually requested at inspections and licence renewals.<\/li><\/ul><\/div>\t\t\t\t\t\t\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t\t\t<div class=\"elementor-element elementor-element-a51394c elementor-widget elementor-widget-text-editor\" data-id=\"a51394c\" data-element_type=\"widget\" data-e-type=\"widget\" data-widget_type=\"text-editor.default\">\n\t\t\t\t<div class=\"elementor-widget-container\">\n\t\t\t\t\t\t\t\t\t<h2>Fire alarm maintenance after handover: how it differs from commissioning<\/h2>\n<p>Acceptance testing is done once, to show that the installed system matches the approved design. We cover it in <a href=\"\/en\/sa\/media-center\/fire-alarm-commissioning-testing\/\">Fire Alarm Commissioning and Acceptance Testing Before Handover<\/a>. Periodic maintenance answers a different question: does the system still work as it did at handover? Dust builds up in sensing chambers, batteries lose capacity with heat and age, and fit-out work or changes of use can block a detector or put a partition in front of a notification appliance.<\/p>\n<p>NFPA 72 defines three parts of the programme:<\/p>\n<ul><li><strong>Inspection:<\/strong> a visual check of the device, its mounting and its surroundings, without operating it.<\/li><li><strong>Testing:<\/strong> actually operating the device or function and confirming the panel and outputs respond.<\/li><li><strong>Maintenance:<\/strong> cleaning, replacement and repair that keep the device working, following the manufacturer&#8217;s instructions.<\/li><\/ul>\n<p>Section 14.1.4 of NFPA 72 (2010 text) states that the chapter&#8217;s requirements apply to both new and existing systems, so they cover a system in service whatever its age. According to a 2020 FacilitiesNet article, Chapter 14 also makes the building owner, or the owner&#8217;s designated representative, responsible for inspection, testing and maintenance.<\/p>\t\t\t\t\t\t\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t\t\t<div class=\"elementor-element elementor-element-6cf3986 elementor-widget elementor-widget-text-editor\" data-id=\"6cf3986\" data-element_type=\"widget\" data-e-type=\"widget\" data-widget_type=\"text-editor.default\">\n\t\t\t\t<div class=\"elementor-widget-container\">\n\t\t\t\t\t\t\t\t\t<h2>The Saudi framework: SBC 801, Civil Defense and NFPA 72<\/h2>\n<p>The binding reference is the Saudi Fire Code SBC 801. Its 2024 edition has been mandatory since 30 June 2025, and fire alarm and detection systems are covered in its fire protection systems chapter. The General Directorate of Civil Defense enforces the code, and safety licences are issued and renewed through the Salamah platform. The code lists NFPA 72 among its referenced standards for alarm and detection. The edition that applies is the one the code refers to or the authority accepts. For more on the code and when it became mandatory, see <a href=\"\/en\/sa\/media-center\/saudi-building-code-sbc-801-fire-protection\/\">Saudi Fire Protection Code (SBC 801): A Practical Guide<\/a>.<\/p>\n<p>So the frequencies below are technical guidance from NFPA 72, not a separate Saudi legal schedule. Apply them together with each manufacturer&#8217;s instructions and any stricter requirement from the authority or the insurer. The current edition is NFPA 72 (2025).<\/p>\t\t\t\t\t\t\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t\t\t<div class=\"elementor-element elementor-element-431a714 elementor-widget elementor-widget-text-editor\" data-id=\"431a714\" data-element_type=\"widget\" data-e-type=\"widget\" data-widget_type=\"text-editor.default\">\n\t\t\t\t<div class=\"elementor-widget-container\">\n\t\t\t\t\t\t\t\t\t<h2>Periodic visual inspection under NFPA 72<\/h2>\n<p>The table follows Table 14.3.1 as shown in the First Draft Report of the Technical Committee on Testing and Maintenance, published on nfpa.org for the 2025 edition revision cycle (A2024) and based on the 2022 text. Check it against the edition adopted for your project:<\/p>\n<div class=\"az-table-wrap\"><table><thead><tr><th>Item<\/th><th>What is inspected<\/th><th>Periodic frequency<\/th><\/tr><\/thead><tbody><tr><td>Monitored control equipment<\/td><td>Fuses, interfaced equipment, lamps and LEDs, primary power supply<\/td><td>Annually<\/td><\/tr><tr><td>Monitored control equipment<\/td><td>Trouble signals<\/td><td>Semiannually<\/td><\/tr><tr><td>Control equipment not monitored by a supervising station<\/td><td>Same items<\/td><td>Weekly<\/td><\/tr><tr><td>Batteries<\/td><td>Month\/year of manufacture marked on each cell or unit<\/td><td>Semiannually<\/td><\/tr><tr><td>Smoke detectors (excluding dwellings)<\/td><td>Condition, mounting, no obstruction or covers<\/td><td>Semiannually<\/td><\/tr><tr><td>Radiant energy (flame) detectors<\/td><td>Condition and line of sight<\/td><td>Quarterly<\/td><\/tr><tr><td>Manual call points<\/td><td>Condition and access<\/td><td>Semiannually<\/td><\/tr><tr><td>Audible, loudspeaker and visual appliances<\/td><td>Condition, no obstruction<\/td><td>Semiannually<\/td><\/tr><tr><td>Voice alarm system and remote annunciators (repeaters)<\/td><td>General condition<\/td><td>Semiannually<\/td><\/tr><\/tbody><\/table><\/div>\n<p>Visual inspection is where site-driven problems show up: a dust cover left on a detector after painting, racking that has grown into a beam detector&#8217;s path, or a sounder hidden behind a sign. These are rarely caught by anything other than a walk-round.<\/p>\t\t\t\t\t\t\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t\t\t<div class=\"elementor-element elementor-element-063bf33 elementor-widget elementor-widget-text-editor\" data-id=\"063bf33\" data-element_type=\"widget\" data-e-type=\"widget\" data-widget_type=\"text-editor.default\">\n\t\t\t\t<div class=\"elementor-widget-container\">\n\t\t\t\t\t\t\t\t\t<h2>Periodic functional testing<\/h2>\n<p>Testing frequencies are in Table 14.4.3.2. The values below come from the Testing and Maintenance committee&#8217;s Second Draft ballot for the 2025 edition cycle (A2024), published on nfpa.org:<\/p>\n<div class=\"az-table-wrap\"><table><thead><tr><th>Item<\/th><th>Test<\/th><th>Periodic frequency<\/th><\/tr><\/thead><tbody><tr><td>Control unit functions<\/td><td>Verify functions and outputs<\/td><td>Annually<\/td><\/tr><tr><td>Control unit trouble signals<\/td><td>Audible and visual signal<\/td><td>Annually<\/td><\/tr><tr><td>VRLA batteries<\/td><td>Temperature, charger, cell\/unit voltage and ohmic tests<\/td><td>Semiannually<\/td><\/tr><tr><td>Smoke detectors<\/td><td>In-place test confirming smoke entry into the chamber and alarm response<\/td><td>Annually<\/td><\/tr><tr><td>Smoke detectors<\/td><td>Sensitivity testing<\/td><td>Per 14.4.4.3<\/td><\/tr><tr><td>Restorable heat detectors<\/td><td>Operational test<\/td><td>Annually<\/td><\/tr><tr><td>Manual call points<\/td><td>Operation and signal to panel<\/td><td>Annually<\/td><\/tr><tr><td>Audible, visual and textual appliances<\/td><td>Verify operation<\/td><td>Annually<\/td><\/tr><tr><td>Emergency communications equipment<\/td><td>Functional test<\/td><td>Annually<\/td><\/tr><tr><td>Supervising station transmission equipment<\/td><td>Signal transmission and receipt<\/td><td>Annually<\/td><\/tr><\/tbody><\/table><\/div>\n<h3>Smoke detector sensitivity testing<\/h3>\n<p>The annual functional test shows that a detector responds. Sensitivity testing shows that it is still within its listed and marked range, neither too dull nor too sensitive. According to an Electrical Contractor explanation of 14.4.4.3 (March 2022), echoed in a US Fire Administration (USFA) bulletin, sensitivity testing is not required when detectors are first installed. It is first checked within one year of installation and then every alternate year. After the second test, the interval may be extended to five years if the detector stays within range, as long as unwanted alarms are tracked. Some addressable panels report sensitivity directly, and the manufacturer&#8217;s instructions set how those readings are accepted. For the link between sensitivity and nuisance alarms, see <a href=\"\/en\/sa\/media-center\/fire-alarm-false-alarms-causes\/\">Fire Alarm False Alarms: Causes and How to Reduce Them<\/a>.<\/p>\t\t\t\t\t\t\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t\t\t<div class=\"elementor-element elementor-element-081cb99 elementor-widget elementor-widget-text-editor\" data-id=\"081cb99\" data-element_type=\"widget\" data-e-type=\"widget\" data-widget_type=\"text-editor.default\">\n\t\t\t\t<div class=\"elementor-widget-container\">\n\t\t\t\t\t\t\t\t\t<h2>Batteries and secondary power<\/h2>\n<p>Batteries degrade without any sign. The panel normally runs on mains power, so a weak battery only shows itself when the mains fails. That is why NFPA 72 makes VRLA battery tests semiannual: battery temperature, the charger, the voltage of each cell or unit, and an ohmic test. The code also sets a voltage threshold. If any cell or unit reads below it, the battery is replaced.<\/p>\n<p>Batteries in hot equipment rooms age faster, so check their dates at every visit. Any change that adds loop devices or notification appliances also means the required capacity must be recalculated. The method is in <a href=\"\/en\/sa\/media-center\/fire-alarm-battery-calculation-secondary-power\/\">Fire Alarm Battery Calculation and Secondary Power Supplies<\/a>.<\/p>\t\t\t\t\t\t\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t\t\t<div class=\"elementor-element elementor-element-4352cfa elementor-widget elementor-widget-text-editor\" data-id=\"4352cfa\" data-element_type=\"widget\" data-e-type=\"widget\" data-widget_type=\"text-editor.default\">\n\t\t\t\t<div class=\"elementor-widget-container\">\n\t\t\t\t\t\t\t\t\t<h2>How a fire alarm maintenance visit runs<\/h2>\n<p>The steps below are common good practice. Adapt them to the building and the manufacturer&#8217;s instructions:<\/p>\n<ol><li>Before starting, notify building management, the occupants and any monitoring station so nobody evacuates or raises an alarm call by mistake.<\/li><li>Review the panel event log, the previous visit report and any open faults.<\/li><li>Where needed, temporarily isolate outputs to other systems, such as lift homing or suppression release, following the approved cause and effect matrix.<\/li><li>Carry out the visual inspection, then the tests that are due this visit.<\/li><li>Record the result for each device by address and location, not just the number of devices tested.<\/li><li>Restore every isolation and confirm the panel shows no fault or disablement before leaving.<\/li><li>Issue a report with results, observations and recommended corrective actions.<\/li><\/ol>\n<p>Step six is the one most often skipped. A zone left disabled after testing leaves that part of the building unprotected until the next visit.<\/p>\t\t\t\t\t\t\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t\t\t<div class=\"elementor-element elementor-element-340e6eb elementor-widget elementor-widget-text-editor\" data-id=\"340e6eb\" data-element_type=\"widget\" data-e-type=\"widget\" data-widget_type=\"text-editor.default\">\n\t\t\t\t<div class=\"elementor-widget-container\">\n\t\t\t\t\t\t\t\t\t<h2>Common mistakes in periodic fire alarm maintenance<\/h2>\n<ul><li>Pressing the panel&#8217;s lamp or test button and calling it a system test.<\/li><li>Testing a sample of detectors each year with no plan to cover every device within the required cycle.<\/li><li>Testing smoke detectors with heat, or with a method the manufacturer does not approve, instead of introducing smoke or a simulant into the chamber.<\/li><li>Confusing the annual functional test with sensitivity testing, or skipping sensitivity testing altogether.<\/li><li>Leaving batteries past their service life because the panel shows no fault.<\/li><li>A visit report that only says &#8220;system OK&#8221;, with no device list or results.<\/li><li>Changing fit-out or layouts without telling the maintenance team, so a detector or appliance no longer serves its purpose.<\/li><\/ul>\t\t\t\t\t\t\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t\t\t<div class=\"elementor-element elementor-element-d13eabc elementor-widget elementor-widget-text-editor\" data-id=\"d13eabc\" data-element_type=\"widget\" data-e-type=\"widget\" data-widget_type=\"text-editor.default\">\n\t\t\t\t<div class=\"elementor-widget-container\">\n\t\t\t\t\t\t\t\t\t<h2>Periodic maintenance for Context Plus systems from AZEIDK<\/h2>\n<p>In Saudi Arabia, AZEIDK supplies Context Plus addressable and conventional fire alarm systems, including <a href=\"\/en\/sa\/products\/fireplus-addressable-fire-control-panels-1-to-6-loops\/\">FirePlus addressable panels from 1 to 6 loops<\/a> and the 55000-268 and 55000-273 intelligent reflective beam detectors. Test and cleaning steps for each device are in its datasheet and operating manual. As set out on the service page, AZEIDK&#8217;s preventive and periodic maintenance covers fire alarm panels, detectors, manual call points and notification appliances. It runs on an agreed visit schedule (monthly, quarterly or semiannual, depending on the system and scope), with periodic functional tests and recorded results, a report after each visit, and an up-to-date maintenance log that can be shown at inspections or licence renewals. Systems installed by others are covered too, after a site assessment of their condition and the right maintenance scope.<\/p>\t\t\t\t\t\t\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t\t\t<div class=\"elementor-element elementor-element-36ea026 elementor-widget elementor-widget-text-editor\" data-id=\"36ea026\" data-element_type=\"widget\" data-e-type=\"widget\" data-widget_type=\"text-editor.default\">\n\t\t\t\t<div class=\"elementor-widget-container\">\n\t\t\t\t\t\t\t\t\t<h2>FAQ<\/h2><div class=\"az-faq\"><details class=\"az-faq__item\"><summary><h3>How often must a fire alarm system be tested?<\/h3><\/summary><p>Under NFPA 72, most field devices and panel functions are tested once a year, most items are visually inspected every six months, and VRLA batteries are tested every six months. Civil Defense requirements and manufacturer instructions also apply.<\/p><\/details><details class=\"az-faq__item\"><summary><h3>Is acceptance testing at handover enough?<\/h3><\/summary><p>No. Acceptance testing shows the system&#8217;s condition on handover day only. The periodic programme is what shows it stays ready. Any later change to the system also needs the affected parts retested.<\/p><\/details><details class=\"az-faq__item\"><summary><h3>What is the difference between a functional test and a sensitivity test?<\/h3><\/summary><p>A functional test shows the detector responds to smoke and signals the panel. A sensitivity test checks that it is still within its listed range, and it has its own schedule under 14.4.4.3.<\/p><\/details><details class=\"az-faq__item\"><summary><h3>Who is responsible for fire alarm maintenance in a building?<\/h3><\/summary><p>According to industry references such as FacilitiesNet (2020), Chapter 14 of NFPA 72 places the responsibility on the building owner or the owner&#8217;s designated representative. The work is usually given to a qualified service provider under a contract that sets scope, frequency and reporting.<\/p><\/details><details class=\"az-faq__item\"><summary><h3>What should a maintenance visit report include?<\/h3><\/summary><p>The visit date, each device inspected or tested with its address and result, the faults found and the actions taken or recommended, and the system status on departure.<\/p><\/details><\/div>\t\t\t\t\t\t\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t\t\t<div class=\"elementor-element elementor-element-ae0a52c elementor-widget elementor-widget-text-editor\" data-id=\"ae0a52c\" data-element_type=\"widget\" data-e-type=\"widget\" data-widget_type=\"text-editor.default\">\n\t\t\t\t<div class=\"elementor-widget-container\">\n\t\t\t\t\t\t\t\t\t<h2>Summary<\/h2>\n<p>A fire alarm maintenance programme rests on two tables. Visual inspection catches what has changed on site, and functional testing shows each device still works. NFPA 72 adds smoke detector sensitivity testing and semiannual battery tests. In Saudi Arabia, SBC 801 and Civil Defense requirements remain the binding framework, and a documented log is what proves the programme was actually carried out.<\/p>\t\t\t\t\t\t\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t\t\t<div class=\"elementor-element elementor-element-3c5f582 elementor-widget elementor-widget-text-editor\" data-id=\"3c5f582\" data-element_type=\"widget\" data-e-type=\"widget\" data-widget_type=\"text-editor.default\">\n\t\t\t\t<div class=\"elementor-widget-container\">\n\t\t\t\t\t\t\t\t\t<p class=\"az-cta\"><strong>Does your fire alarm system need a periodic maintenance programme?<\/strong> Send us the panel type, the number of loops or zones and the date of the last visit, and we will propose an inspection scope and visit schedule to suit the system. <a href=\"\/en\/sa\/contact\/\">Contact the AZEIDK team<\/a><\/p>\t\t\t\t\t\t\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t\t\t<div class=\"elementor-element elementor-element-6421bbe elementor-widget elementor-widget-text-editor\" data-id=\"6421bbe\" data-element_type=\"widget\" data-e-type=\"widget\" data-widget_type=\"text-editor.default\">\n\t\t\t\t<div class=\"elementor-widget-container\">\n\t\t\t\t\t\t\t\t\t<div class=\"az-source\"><strong>References:<\/strong> <a href=\"https:\/\/www.nfpa.org\/product\/nfpa-72-code\/p0072code\/nfpa-72-national-fire-alarm-and-signaling-code-2025\/7225\" rel=\"noopener\" target=\"_blank\">NFPA 72, National Fire Alarm and Signaling Code (2025)<\/a> (NFPA); <a href=\"https:\/\/docinfofiles.nfpa.org\/files\/AboutTheCodes\/72\/72_A2024_SIG_TMS_FD_FRreport.pdf\" rel=\"noopener\" target=\"_blank\">NFPA 72 First Draft Report, Testing and Maintenance (A2024 cycle)<\/a> (NFPA); <a href=\"https:\/\/docinfofiles.nfpa.org\/files\/AboutTheCodes\/72\/72_A2024_SIG_TMS_SD_ballot_final.pdf\" rel=\"noopener\" target=\"_blank\">NFPA 72 Second Draft Ballot, Testing and Maintenance (A2024 cycle)<\/a> (NFPA); <a href=\"https:\/\/www.ecmag.com\/magazine\/articles\/article-detail\/integrated-systems-tried-and-tested-smoke-detector-sensitivity-testing\" rel=\"noopener\" target=\"_blank\">Tried and Tested: Smoke Detector Sensitivity Testing<\/a> (Electrical Contractor, March 2022); <a href=\"https:\/\/www.facilitiesnet.com\/firesafety\/article\/code-considerations-for-inspecting-testing-and-maintaining-fire-alarm-systems--19011\" rel=\"noopener\" target=\"_blank\">Code Considerations for Inspecting, Testing, and Maintaining Fire Alarm Systems<\/a> (FacilitiesNet, 2020); <a href=\"https:\/\/webarchive.library.unt.edu\/web\/20120928051304\/http:\/\/www.usfa.fema.gov\/downloads\/pdf\/coffee-break\/cb_fp_2011_3.pdf\" rel=\"noopener\" target=\"_blank\">Fire Alarms &amp; Detection: Smoke Detector Sensitivity (Coffee Break Training FP-2011-3)<\/a> (USFA, 2011); <a href=\"https:\/\/secure.in.gov\/dhs\/files\/NFPA-72-2010,-Chapters-1and14Requirements-submitted-by-Gary-Herrington.pdf\" rel=\"noopener\" target=\"_blank\">NFPA 72 (2010), Chapters 1 and 14<\/a> (Indiana Department of Homeland Security)<\/div>\t\t\t\t\t\t\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t","protected":false},"excerpt":{"rendered":"<p>Fire alarm maintenance in Saudi Arabia: NFPA 72 Chapter 14 inspection and test frequencies, battery and sensitivity testing, and the role of SBC 801.<\/p>\n","protected":false},"author":0,"featured_media":22199,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"_acf_changed":false,"footnotes":""},"categories":[221],"tags":[],"azeidk_region":[223],"class_list":["post-19397","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-azeidk-articles"],"acf":[],"_links":{"self":[{"href":"https:\/\/azeidkgroup.com\/en\/wp-json\/wp\/v2\/posts\/19397","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/azeidkgroup.com\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/azeidkgroup.com\/en\/wp-json\/wp\/v2\/types\/post"}],"replies":[{"embeddable":true,"href":"https:\/\/azeidkgroup.com\/en\/wp-json\/wp\/v2\/comments?post=19397"}],"version-history":[{"count":1,"href":"https:\/\/azeidkgroup.com\/en\/wp-json\/wp\/v2\/posts\/19397\/revisions"}],"predecessor-version":[{"id":19424,"href":"https:\/\/azeidkgroup.com\/en\/wp-json\/wp\/v2\/posts\/19397\/revisions\/19424"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/azeidkgroup.com\/en\/wp-json\/wp\/v2\/media\/22199"}],"wp:attachment":[{"href":"https:\/\/azeidkgroup.com\/en\/wp-json\/wp\/v2\/media?parent=19397"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/azeidkgroup.com\/en\/wp-json\/wp\/v2\/categories?post=19397"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/azeidkgroup.com\/en\/wp-json\/wp\/v2\/tags?post=19397"},{"taxonomy":"azeidk_region","embeddable":true,"href":"https:\/\/azeidkgroup.com\/en\/wp-json\/wp\/v2\/azeidk_region?post=19397"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}