{"id":18371,"date":"2026-11-01T10:45:00","date_gmt":"2026-11-01T10:45:00","guid":{"rendered":"https:\/\/azeidkgroup.com\/sa\/media-center\/"},"modified":"2026-11-01T10:45:00","modified_gmt":"2026-11-01T10:45:00","slug":"fire-pump-controller-selection","status":"publish","type":"post","link":"https:\/\/azeidkgroup.com\/en\/sa\/media-center\/fire-pump-controller-selection\/","title":{"rendered":"Fire Pump Controllers: Types and Selection Criteria"},"content":{"rendered":"\t\t<div data-elementor-type=\"wp-post\" data-elementor-id=\"18371\" class=\"elementor elementor-18371 elementor-18370 elementor-bc-flex-widget\" data-elementor-post-type=\"post\">\n\t\t\t\t<div class=\"elementor-element elementor-element-971b75a e-con-full az-el-article e-flex e-con e-parent\" data-id=\"971b75a\" data-element_type=\"container\" data-e-type=\"container\">\n\t\t\t\t<div class=\"elementor-element elementor-element-11054e3 elementor-widget elementor-widget-text-editor\" data-id=\"11054e3\" data-element_type=\"widget\" data-e-type=\"widget\" data-widget_type=\"text-editor.default\">\n\t\t\t\t<div class=\"elementor-widget-container\">\n\t\t\t\t\t\t\t\t\t<p class=\"az-intro\">A <strong>fire pump controller<\/strong> decides when the fire pump starts and then keeps it running through faults that would trip any ordinary industrial motor starter. It is not a standard motor panel picked from the BOQ by horsepower alone.<\/p>\n<p>This guide covers controller types, starting methods, diesel controllers, transfer switches, selection data and submittals for Saudi projects.<\/p>\t\t\t\t\t\t\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t\t\t<div class=\"elementor-element elementor-element-2eaf5ce elementor-widget elementor-widget-text-editor\" data-id=\"2eaf5ce\" data-element_type=\"widget\" data-e-type=\"widget\" data-widget_type=\"text-editor.default\">\n\t\t\t\t<div class=\"elementor-widget-container\">\n\t\t\t\t\t\t\t\t\t<div class=\"az-keybox\"><h2>Key takeaways<\/h2><ul><li>The controller must be listed or approved specifically for fire pump service, under standards such as UL 218 and FM Approvals Class 1321\/1323.<\/li><li>The starting method depends on how much starting current the source can accept, and the motor windings must suit it.<\/li><li>According to UL, limited service controllers are restricted to across-the-line squirrel-cage motors of 30 hp or less at 600 V or less, subject to the authority having jurisdiction.<\/li><li>Under the NEC (NFPA 70), an automatic transfer switch for an alternate source must be listed for fire pump service. It is most often combined with the controller.<\/li><li>A diesel controller manages two battery units with two independent chargers and raises a fail-to-start alarm after the cranking cycle.<\/li><li>Pump running, phase loss, phase reversal and trouble signals are typically wired to the fire alarm panel.<\/li><\/ul><\/div>\t\t\t\t\t\t\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t\t\t<div class=\"elementor-element elementor-element-1bcbf46 elementor-widget elementor-widget-text-editor\" data-id=\"1bcbf46\" data-element_type=\"widget\" data-e-type=\"widget\" data-widget_type=\"text-editor.default\">\n\t\t\t\t<div class=\"elementor-widget-container\">\n\t\t\t\t\t\t\t\t\t<h2>What does a fire pump controller do?<\/h2>\n<p>The controller starts, stops and supervises the pump driver. When pressure in the sensing line falls to the set start point, it starts the pump automatically. It can also be started manually or with the mechanical emergency-run handle.<\/p>\n<p>Unlike industrial starters, it puts keeping the pump running ahead of protecting the motor. The FM Approvals standard states that fire pump controllers default to a run state, or give an audible and visual alarm, when a malfunction occurs, and that failures in external control circuits must not prevent the pump from being operated by other means. Protection is therefore non-thermal, covering short circuit and locked rotor only.<\/p>\n<p>The main technical reference is NFPA 20, <em>Standard for the Installation of Stationary Pumps for Fire Protection<\/em>, currently the 2025 edition; it has separate chapters for electric and diesel controllers. In Saudi Arabia, the applicable edition is the one SBC 801 references, the General Directorate of Civil Defense accepts or the project specification names. NFPA is a technical reference, not an automatic legal requirement. See our <a href=\"\/en\/sa\/media-center\/nfpa-20-fire-pumps-standard-guide\/\">NFPA 20 guide<\/a>.<\/p>\t\t\t\t\t\t\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t\t\t<div class=\"elementor-element elementor-element-b6cf941 elementor-widget elementor-widget-text-editor\" data-id=\"b6cf941\" data-element_type=\"widget\" data-e-type=\"widget\" data-widget_type=\"text-editor.default\">\n\t\t\t\t<div class=\"elementor-widget-container\">\n\t\t\t\t\t\t\t\t\t<h2>Electric fire pump controller types<\/h2>\n<p>UL lists fire pump controllers in separate categories. The main one covers full service, engine type, limited service and additive (foam) controllers; high-voltage controllers (601 V to 7.2 kV in the FM standard) are separate.<\/p>\n<h3>Full service controllers<\/h3>\n<p>The normal choice for main electric pumps up to 600 V. It includes an isolating switch (defined in the FM standard as having no interrupting rating and operated only after the circuit is opened by other means), a circuit breaker for short-circuit and locked-rotor protection, the main contactor, and a mechanical emergency-run means that closes the contactor if electrical closing fails. If fed directly from the utility, it may need to be suitable as service entrance equipment.<\/p>\n<h3>Limited service controllers<\/h3>\n<p>According to UL, these are restricted to across-the-line squirrel-cage motors of 30 hp or less and 600 V or less, and the authority having jurisdiction should be consulted before use. The FM standard notes that limited service controllers are not FM Approved. IAEI Magazine has reported NEMA&#8217;s concerns about their performance compared with full service controllers, so do not treat them as an automatic cost saving.<\/p>\t\t\t\t\t\t\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t\t\t<div class=\"elementor-element elementor-element-f0fc5ce elementor-widget elementor-widget-text-editor\" data-id=\"f0fc5ce\" data-element_type=\"widget\" data-e-type=\"widget\" data-widget_type=\"text-editor.default\">\n\t\t\t\t<div class=\"elementor-widget-container\">\n\t\t\t\t\t\t\t\t\t<h2>Motor starting methods<\/h2>\n<p>Starting methods listed in the FM standard (February 2018 edition) include across-the-line, part-winding, wye-delta, primary resistor or reactor, soft start and autotransformer starting, plus variable speed controllers. Reduced-voltage methods cut starting current but add complexity and lower starting torque.<\/p>\n<div class=\"az-table-wrap\"><table><thead><tr><th>Starting method<\/th><th>Principle<\/th><th>What to check<\/th><\/tr><\/thead><tbody><tr><td>Across-the-line<\/td><td>Full voltage at start, highest current and torque<\/td><td>Can the source accept locked-rotor current and voltage dip?<\/td><\/tr><tr><td>Part winding<\/td><td>Energises part of the motor winding first, then all of it<\/td><td>A motor designed for part-winding starting<\/td><\/tr><tr><td>Wye-delta, open transition<\/td><td>Starts in wye, switches to delta with a brief disconnection<\/td><td>Motor wired for wye-delta (typically six leads) running in delta; transition current spike<\/td><\/tr><tr><td>Wye-delta, closed transition<\/td><td>Same principle, motor stays connected during transition<\/td><td>Lower transient, more components<\/td><\/tr><tr><td>Autotransformer<\/td><td>Reduced voltage through transformer taps<\/td><td>Selected tap and available starting torque<\/td><\/tr><tr><td>Primary resistor or reactor<\/td><td>Series elements reduce voltage during start<\/td><td>Required current, torque and acceleration time<\/td><\/tr><tr><td>Soft start<\/td><td>Solid-state voltage ramp<\/td><td>Complete controller listed with this method<\/td><\/tr><tr><td>Variable speed<\/td><td>Variable speed path holding design pressure, plus full-speed path<\/td><td>Full-speed path, pump curves and motor compatibility<\/td><\/tr><\/tbody><\/table><\/div>\n<p>As a general electrical principle, wye-delta starting reduces starting current and torque to roughly one third of across-the-line values, so confirm that torque is enough for the pump. Autotransformer values vary with the tap. NFPA also issued TIA 20-25-1 to the 2025 edition of NFPA 20, revising the requirements that starting reactors and autotransformers must meet.<\/p>\n<p>The FM standard defines a variable speed controller as a full service controller with both a full-speed path and a variable speed power path that monitors discharge pressure and adjusts motor speed. Using one is a design decision.<\/p>\t\t\t\t\t\t\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t\t\t<div class=\"elementor-element elementor-element-1503abd elementor-widget elementor-widget-text-editor\" data-id=\"1503abd\" data-element_type=\"widget\" data-e-type=\"widget\" data-widget_type=\"text-editor.default\">\n\t\t\t\t<div class=\"elementor-widget-container\">\n\t\t\t\t\t\t\t\t\t<h2>Automatic transfer switches and alternate power<\/h2>\n<p>Where the design calls for an alternate power source, such as a standby generator or a second feed, an automatic transfer switch sits between the sources and the controller. NEC (NFPA 70) Article 695, as quoted by HCAI PIN 78 with a reference to NFPA 20, requires it to be listed for fire pump service, which is not the same as a switch listed only for emergency loads. Most often both come as one listed combination unit.<\/p>\n<p>The FM standard requires fire pump transfer switches to be operable manually as well, and a combination unit carries two short-circuit current ratings, one for the normal source and one for the alternate source. When an alternate source is needed, and when a diesel pump can replace it, is covered in our <a href=\"\/en\/sa\/media-center\/electric-vs-diesel-fire-pumps\/\">electric vs diesel fire pump comparison<\/a>.<\/p>\t\t\t\t\t\t\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t\t\t<div class=\"elementor-element elementor-element-c73f35f elementor-widget elementor-widget-text-editor\" data-id=\"c73f35f\" data-element_type=\"widget\" data-e-type=\"widget\" data-widget_type=\"text-editor.default\">\n\t\t\t\t<div class=\"elementor-widget-container\">\n\t\t\t\t\t\t\t\t\t<h2>Diesel engine controllers, batteries and alarms<\/h2>\n<p>A diesel controller runs the engine cranking cycle from the batteries and supervises the engine. Key points from FM Approvals Class 1321\/1323 (February 2018 edition); check them against the NFPA 20 edition adopted for the project:<\/p>\n<ul><li><strong>Two battery units and two chargers:<\/strong> the independent chargers must fully recharge both units within 24 hours.<\/li><li><strong>Fail to start:<\/strong> if the cranking cycle ends without a signal from the speed sensor, the controller raises a fail-to-start alarm.<\/li><li><strong>Restricted shutdown:<\/strong> while a start or run signal is present, the controller may shut the engine down only for overspeed. Low oil pressure and high engine temperature can stop it in test mode only.<\/li><li><strong>System overpressure alarm<\/strong> where NFPA 20 requires it, and a means for the weekly test run.<\/li><li><strong>Lockable enclosure<\/strong> and indication for batteries, chargers and engine status.<\/li><\/ul>\n<p>The controller must match the engine, its battery voltage and its sensors. For fuel, ventilation and cooling in the pump room, see our <a href=\"\/en\/sa\/media-center\/fire-pump-room\/\">fire pump room guide<\/a>.<\/p>\t\t\t\t\t\t\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t\t\t<div class=\"elementor-element elementor-element-ac7b175 elementor-widget elementor-widget-text-editor\" data-id=\"ac7b175\" data-element_type=\"widget\" data-e-type=\"widget\" data-widget_type=\"text-editor.default\">\n\t\t\t\t<div class=\"elementor-widget-container\">\n\t\t\t\t\t\t\t\t\t<h2>Pressure sensing, pressure recording and remote signals<\/h2>\n<p>An automatic controller relies on a pressure sensing line connected to the discharge side of the system. Modern controllers typically use an electronic pressure transducer. The FM standard asks for a drawing of the pressure sensing device in the approval documentation and treats a pressure recorder as standard equipment where appropriate or required by the AHJ.<\/p>\n<p>For signals to the fire alarm panel, Consulting-Specifying Engineer, citing NFPA 20 (2019 edition), lists controller contacts for pump running, phase loss, phase reversal, and controller or system trouble. With a transfer switch, signals are added for connection to the alternate source and for the alternate source isolating means being open. Confirm the list against the edition adopted for the project.<\/p>\n<p>The jockey pump has its own controller and, according to Consulting-Specifying Engineer citing NEC (NFPA 70) 2020 Section 695.6(I), must not be supplied from the fire pump controller. Jockey pressure settings are a separate topic.<\/p>\t\t\t\t\t\t\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t\t\t<div class=\"elementor-element elementor-element-b43663f elementor-widget elementor-widget-text-editor\" data-id=\"b43663f\" data-element_type=\"widget\" data-e-type=\"widget\" data-widget_type=\"text-editor.default\">\n\t\t\t\t<div class=\"elementor-widget-container\">\n\t\t\t\t\t\t\t\t\t<h2>How to select a fire pump controller<\/h2>\n<p>Collect this data before requesting offers:<\/p>\n<ol><li><strong>Driver:<\/strong> electric or diesel, and the electric motor type and winding connections (number of leads, part winding, wye-delta).<\/li><li><strong>Rating:<\/strong> motor horsepower or kW, the actual supply voltage on the project, frequency (60 Hz in Saudi Arabia), or medium voltage where used.<\/li><li><strong>Power source:<\/strong> one or two sources, any generator, and available short-circuit current at the controller.<\/li><li><strong>Starting method:<\/strong> based on how much starting current the utility supply or generator can accept.<\/li><li><strong>Listing:<\/strong> UL or FM for the controller model and starting method, not only for the pump.<\/li><li><strong>Enclosure:<\/strong> a NEMA type or IP rating suited to dust, humidity and heat in the room, and protection from water spray.<\/li><li><strong>Signals:<\/strong> the number of contacts needed for the fire alarm panel.<\/li><\/ol>\n<p>Choose the controller with the pump and driver as one package; see our <a href=\"\/en\/sa\/media-center\/fire-pumps-selection-design-approvals-guide\/\">fire pump selection guide for Saudi projects<\/a>.<\/p>\t\t\t\t\t\t\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t\t\t<div class=\"elementor-element elementor-element-af56ba5 elementor-widget elementor-widget-text-editor\" data-id=\"af56ba5\" data-element_type=\"widget\" data-e-type=\"widget\" data-widget_type=\"text-editor.default\">\n\t\t\t\t<div class=\"elementor-widget-container\">\n\t\t\t\t\t\t\t\t\t<h2>Controller submittal documents<\/h2>\n<ul><li>The model datasheet with starting method, voltage, power rating and short-circuit current rating.<\/li><li>Listing or approval evidence for that exact model, verifiable in UL Product iQ or the FM Approvals directory.<\/li><li>Wiring diagrams, single-line diagrams, and enclosure type and dimensions.<\/li><li>The list of alarms and contacts, the installation manual, and the operation and maintenance manual.<\/li><li>For a transfer switch, its listing and both short-circuit current ratings.<\/li><\/ul>\n<p>On product conformity, the SASO Technical Regulation for Fire Control Materials and Equipment covers fire pumps and their parts and accessories, with a certificate of conformity issued through the SABER platform. Confirm with a conformity assessment body whether a controller imported on its own falls within scope.<\/p>\t\t\t\t\t\t\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t\t\t<div class=\"elementor-element elementor-element-09c577f elementor-widget elementor-widget-text-editor\" data-id=\"09c577f\" data-element_type=\"widget\" data-e-type=\"widget\" data-widget_type=\"text-editor.default\">\n\t\t\t\t<div class=\"elementor-widget-container\">\n\t\t\t\t\t\t\t\t\t<h2>Common mistakes with fire pump controllers<\/h2>\n<ul><li>Supplying an industrial motor starter with thermal overload protection instead of a listed fire pump controller.<\/li><li>Specifying wye-delta starting for a motor not wired for it, or part winding for a motor not designed for it.<\/li><li>Using a transfer switch listed for emergency loads only, not for fire pump service.<\/li><li>Using a limited service controller without AHJ acceptance, or for a motor beyond its limits.<\/li><li>Leaving the controller in manual after testing, or not wiring its signals to the fire alarm panel.<\/li><\/ul>\t\t\t\t\t\t\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t\t\t<div class=\"elementor-element elementor-element-95ff3b6 elementor-widget elementor-widget-text-editor\" data-id=\"95ff3b6\" data-element_type=\"widget\" data-e-type=\"widget\" data-widget_type=\"text-editor.default\">\n\t\t\t\t<div class=\"elementor-widget-container\">\n\t\t\t\t\t\t\t\t\t<h2>How AZEIDK can help<\/h2>\n<p>AZEIDK reviews motor and power data, matches the controller to the pump package and checks listing documents before submittal. AZEIDK supplies <a href=\"\/en\/sa\/media-center\/jack-pump-brand-fire-pumps-saudi-arabia\/\">Jack Pump<\/a> fire pumps; each package is checked for a listed controller. After installation, controller functions are verified during <a href=\"\/en\/sa\/media-center\/fire-pump-acceptance-testing-commissioning\/\">fire pump acceptance testing and commissioning<\/a>.<\/p>\t\t\t\t\t\t\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t\t\t<div class=\"elementor-element elementor-element-a9bf15b elementor-widget elementor-widget-text-editor\" data-id=\"a9bf15b\" data-element_type=\"widget\" data-e-type=\"widget\" data-widget_type=\"text-editor.default\">\n\t\t\t\t<div class=\"elementor-widget-container\">\n\t\t\t\t\t\t\t\t\t<h2>Frequently asked questions<\/h2><div class=\"az-faq\"><details class=\"az-faq__item\"><summary><h3>Can a standard motor starter be used for a fire pump?<\/h3><\/summary><p>No. A fire pump controller is tested and listed for this service. Its logic favours continued operation with non-thermal protection, while industrial starters trip the motor on overload.<\/p><\/details><details class=\"az-faq__item\"><summary><h3>When is reduced-voltage starting needed?<\/h3><\/summary><p>When the transformer or generator cannot accept across-the-line starting current without an unacceptable voltage dip.<\/p><\/details><details class=\"az-faq__item\"><summary><h3>How do I verify a controller listing?<\/h3><\/summary><p>Search by manufacturer and model in UL Product iQ or the FM Approvals directory, and confirm the listing covers the starting method, voltage and horsepower.<\/p><\/details><details class=\"az-faq__item\"><summary><h3>Which signals go to the fire alarm panel?<\/h3><\/summary><p>Typically pump running, phase loss, phase reversal and controller trouble, plus alternate source signals with a transfer switch. Diesel controllers add engine, battery and fail-to-start alarms.<\/p><\/details><\/div>\t\t\t\t\t\t\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t\t\t<div class=\"elementor-element elementor-element-e7c3b46 elementor-widget elementor-widget-text-editor\" data-id=\"e7c3b46\" data-element_type=\"widget\" data-e-type=\"widget\" data-widget_type=\"text-editor.default\">\n\t\t\t\t<div class=\"elementor-widget-container\">\n\t\t\t\t\t\t\t\t\t<h2>Conclusion<\/h2>\n<p>Choosing a fire pump controller starts with the driver and power source: rating, voltage, short-circuit current and the starting method the source can take. Then the fire pump service listing, transfer switch, alarm signals and enclosure. Settling these at submittal stage costs far less than changing them at acceptance.<\/p>\t\t\t\t\t\t\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t\t\t<div class=\"elementor-element elementor-element-b13a6e4 elementor-widget elementor-widget-text-editor\" data-id=\"b13a6e4\" data-element_type=\"widget\" data-e-type=\"widget\" data-widget_type=\"text-editor.default\">\n\t\t\t\t<div class=\"elementor-widget-container\">\n\t\t\t\t\t\t\t\t\t<p class=\"az-cta\"><strong>Reviewing a fire pump controller specification?<\/strong> Send us the motor rating, voltage, power source and required starting method, and we will review controller compatibility and listing documents with you. <a href=\"\/en\/sa\/contact\/\">Talk to the AZEIDK team<\/a><\/p>\t\t\t\t\t\t\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t\t\t<div class=\"elementor-element elementor-element-e1855c6 elementor-widget elementor-widget-text-editor\" data-id=\"e1855c6\" data-element_type=\"widget\" data-e-type=\"widget\" data-widget_type=\"text-editor.default\">\n\t\t\t\t<div class=\"elementor-widget-container\">\n\t\t\t\t\t\t\t\t\t<div class=\"az-source\"><strong>References:<\/strong> <a href=\"https:\/\/fmapprovals.com\/-\/media\/Feature\/Approval-Standards\/1321_1323-pdf.pdf\" rel=\"noopener\" target=\"_blank\">Approval Standard for Controllers for Electric Motor Driven and Diesel Engine Driven Fire Pumps, Class 1321\/1323<\/a> (FM Approvals), <a href=\"https:\/\/docinfofiles.nfpa.org\/files\/AboutTheCodes\/20\/TIA_20_25_1.pdf\" rel=\"noopener\" target=\"_blank\">Tentative Interim Amendment TIA 20-25-1 to NFPA 20, 2025 Edition<\/a> (NFPA), <a href=\"https:\/\/code-authorities.ul.com\/about\/blog\/understanding-fire-pump-controller-applications\/\" rel=\"noopener\" target=\"_blank\">Understanding Fire Pump Controller Applications<\/a> (UL), <a href=\"https:\/\/www.csemag.com\/back-to-basics-fire-pump-electrical-design-guide\/\" rel=\"noopener\" target=\"_blank\">Back to basics: Fire pump electrical design guide<\/a> (Consulting-Specifying Engineer), <a href=\"https:\/\/hcai.ca.gov\/document\/pin-78-fire-pump-automatic-transfer-switches\" rel=\"noopener\" target=\"_blank\">PIN 78: Fire Pump Automatic Transfer Switches<\/a> (HCAI), <a href=\"https:\/\/iaeimagazine.org\/?p=8532\" rel=\"noopener\" target=\"_blank\">Limited-Service Controllers<\/a> (IAEI Magazine), and <a href=\"https:\/\/saso.gov.sa\/en\/Laws-And-Regulations\/Technical_regulations\/Documents\/TR%20-%20Fire%20Control%20Materials%20and%20Equipment.pdf\" rel=\"noopener\" target=\"_blank\">Technical Regulation for Fire Control Materials and Equipment<\/a> (SASO)<\/div>\t\t\t\t\t\t\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t","protected":false},"excerpt":{"rendered":"<p>Fire pump controller guide for Saudi projects: electric and diesel controller types, starting methods, transfer switches, alarms, selection and submittals.<\/p>\n","protected":false},"author":0,"featured_media":16338,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"_acf_changed":false,"footnotes":""},"categories":[221],"tags":[],"azeidk_region":[223],"class_list":["post-18371","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-azeidk-articles"],"acf":[],"_links":{"self":[{"href":"https:\/\/azeidkgroup.com\/en\/wp-json\/wp\/v2\/posts\/18371","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/azeidkgroup.com\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/azeidkgroup.com\/en\/wp-json\/wp\/v2\/types\/post"}],"replies":[{"embeddable":true,"href":"https:\/\/azeidkgroup.com\/en\/wp-json\/wp\/v2\/comments?post=18371"}],"version-history":[{"count":1,"href":"https:\/\/azeidkgroup.com\/en\/wp-json\/wp\/v2\/posts\/18371\/revisions"}],"predecessor-version":[{"id":19201,"href":"https:\/\/azeidkgroup.com\/en\/wp-json\/wp\/v2\/posts\/18371\/revisions\/19201"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/azeidkgroup.com\/en\/wp-json\/wp\/v2\/media\/16338"}],"wp:attachment":[{"href":"https:\/\/azeidkgroup.com\/en\/wp-json\/wp\/v2\/media?parent=18371"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/azeidkgroup.com\/en\/wp-json\/wp\/v2\/categories?post=18371"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/azeidkgroup.com\/en\/wp-json\/wp\/v2\/tags?post=18371"},{"taxonomy":"azeidk_region","embeddable":true,"href":"https:\/\/azeidkgroup.com\/en\/wp-json\/wp\/v2\/azeidk_region?post=18371"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}