{"id":15252,"date":"2026-10-26T07:43:31","date_gmt":"2026-10-26T07:43:31","guid":{"rendered":"https:\/\/azeidkgroup.com\/preventive-vs-corrective-fire-maintenance\/"},"modified":"2026-10-29T19:02:51","modified_gmt":"2026-10-29T19:02:51","slug":"preventive-vs-corrective-fire-maintenance","status":"publish","type":"post","link":"https:\/\/azeidkgroup.com\/en\/sa\/media-center\/preventive-vs-corrective-fire-maintenance\/","title":{"rendered":"Preventive vs Corrective Maintenance for Fire Systems"},"content":{"rendered":"\t\t<div data-elementor-type=\"wp-post\" data-elementor-id=\"15252\" class=\"elementor elementor-15252 elementor-15251 elementor-bc-flex-widget\" data-elementor-post-type=\"post\">\n\t\t\t\t<div class=\"elementor-element elementor-element-e4e338c e-con-full az-el-article e-flex e-con e-parent\" data-id=\"e4e338c\" data-element_type=\"container\" data-e-type=\"container\">\n\t\t\t\t<div class=\"elementor-element elementor-element-e7dd506 elementor-widget elementor-widget-text-editor\" data-id=\"e7dd506\" data-element_type=\"widget\" data-e-type=\"widget\" data-widget_type=\"text-editor.default\">\n\t\t\t\t<div class=\"elementor-widget-container\">\n\t\t\t\t\t\t\t\t\t<p class=\"az-intro\">Preventive maintenance is scheduled inspection, testing and maintenance at set intervals to keep fire protection systems ready and catch deterioration early; corrective maintenance is the repair of deficiencies and faults once they are found. NFPA 25 defines maintenance as work performed to keep equipment operable or to make repairs, so it covers both; you need a program that schedules the first and controls the second.<\/p>\t\t\t\t\t\t\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t\t\t<div class=\"elementor-element elementor-element-930617c elementor-widget elementor-widget-text-editor\" data-id=\"930617c\" data-element_type=\"widget\" data-e-type=\"widget\" data-widget_type=\"text-editor.default\">\n\t\t\t\t<div class=\"elementor-widget-container\">\n\t\t\t\t\t\t\t\t\t<div class=\"az-keybox\"><h2>Key takeaways<\/h2>\n<ul>\n<li>Preventive work detects faults on a schedule; corrective work restores the system afterward. Neither replaces the other.<\/li>\n<li>NFPA 25 classifies findings as noncritical deficiencies, critical deficiencies or impairments, each handled differently.<\/li>\n<li>The 2026 edition requires deficiencies to be corrected within a time frame approved by the authority having jurisdiction (AHJ); its annex cites a common practice of 30 days for critical and 90 days for noncritical.<\/li>\n<li>The owner or designated representative is responsible for inspection, testing and maintenance (ITM) and for correcting deficiencies.<\/li>\n<li>Impairments trigger Chapter 15: a coordinator, tags, notifications, and alternative measures if the system is out of service for more than 10 hours in 24 (per the 2020 text).<\/li>\n<\/ul><\/div>\t\t\t\t\t\t\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t\t\t<div class=\"elementor-element elementor-element-fec272c elementor-widget elementor-widget-text-editor\" data-id=\"fec272c\" data-element_type=\"widget\" data-e-type=\"widget\" data-widget_type=\"text-editor.default\">\n\t\t\t\t<div class=\"elementor-widget-container\">\n\t\t\t\t\t\t\t\t\t<h2>Preventive vs corrective maintenance: the difference<\/h2>\n<p>Preventive maintenance starts from a schedule of inspections, tests and maintenance tasks set by the standard and the manufacturer, regardless of failures. Corrective maintenance starts from a finding, such as a damaged sprinkler, a leaking valve or a weak panel battery. Preventive inspections find most of what needs correcting.<\/p>\n<div class=\"az-table-wrap\"><table>\n<thead><tr><th>Aspect<\/th><th>Preventive<\/th><th>Corrective<\/th><\/tr><\/thead>\n<tbody>\n<tr><td>When<\/td><td>On a fixed schedule, before failure<\/td><td>After a deficiency, fault or impairment is found<\/td><\/tr>\n<tr><td>Goal<\/td><td>Keep the system ready and catch deterioration early<\/td><td>Restore the system or component to the required condition<\/td><\/tr>\n<tr><td>Examples<\/td><td>Valve inspections, routine fire pump runs, waterflow alarm tests, lubrication<\/td><td>Replacing a damaged sprinkler, repairing a leaking check valve, replacing panel batteries, repairing a dry system air compressor<\/td><\/tr>\n<tr><td>Budget<\/td><td>Fixed and known in advance<\/td><td>Variable; needs a clear pricing and approval route in the contract<\/td><\/tr>\n<tr><td>Effect on readiness<\/td><td>Reduces the chance of an impairment<\/td><td>Removes an existing risk; may need interim measures until fixed<\/td><\/tr>\n<\/tbody>\n<\/table><\/div>\t\t\t\t\t\t\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t\t\t<div class=\"elementor-element elementor-element-8c0dd52 elementor-widget elementor-widget-text-editor\" data-id=\"8c0dd52\" data-element_type=\"widget\" data-e-type=\"widget\" data-widget_type=\"text-editor.default\">\n\t\t\t\t<div class=\"elementor-widget-container\">\n\t\t\t\t\t\t\t\t\t<h2>How NFPA 25 classifies findings<\/h2>\n<p>In NFPA 25, a deficiency is a condition that will or may adversely affect the performance of a system or portion of it but does not rise to the level of an impairment. It is critical if, left uncorrected, it can materially affect the system&#8217;s ability to function as intended in a fire, and noncritical if not, though correction is still needed to meet the standard or allow proper ITM.<\/p>\n<p>An impairment is a condition where a system or part of it is out of order and may not function in a fire. A preplanned impairment comes from work planned in advance; an emergency impairment comes from an unplanned event and includes impairments found during ITM.<\/p>\n<div class=\"az-table-wrap\"><table>\n<thead><tr><th>Class<\/th><th>Meaning<\/th><th>Example<\/th><th>Handling<\/th><\/tr><\/thead>\n<tbody>\n<tr><td>Noncritical deficiency<\/td><td>No material effect on performance, but noncompliant or hinders ITM<\/td><td>Missing sign on a control valve<\/td><td>Correct within the AHJ time frame; common practice 90 days<\/td><\/tr>\n<tr><td>Critical deficiency<\/td><td>Could materially affect performance in a fire if not corrected<\/td><td>Painted or damaged sprinklers, depending on occupancy and extent<\/td><td>Correct within the AHJ time frame; common practice 30 days<\/td><\/tr>\n<tr><td>Impairment<\/td><td>System or part out of order and may not work in a fire<\/td><td>Closed control valve supplying part of the system<\/td><td>Chapter 15 impairment program until repaired; correct as soon as practical<\/td><\/tr>\n<\/tbody>\n<\/table><\/div>\n<p>Classification depends on context and occupancy: the National Fire Sprinkler Association (NFSA) notes that a painted sprinkler in a data center could be an impairment, while the same sprinkler in a metal shop may be a critical deficiency. Agree the classification method in the contract.<\/p>\t\t\t\t\t\t\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t\t\t<div class=\"elementor-element elementor-element-2d2932b elementor-widget elementor-widget-text-editor\" data-id=\"2d2932b\" data-element_type=\"widget\" data-e-type=\"widget\" data-widget_type=\"text-editor.default\">\n\t\t\t\t<div class=\"elementor-widget-container\">\n\t\t\t\t\t\t\t\t\t<h2>Owner responsibility and correction time frames in the 2026 edition<\/h2>\n<p>NFPA 25 makes the property owner or designated representative responsible for maintaining the system. The 2026 edition, as corrected by Errata 25-26-1 (7 October 2025), requires the owner to correct deficiencies and impairments (4.1.6.1), within a time frame approved by the AHJ and with an approved Chapter 15 impairment program until impairments are repaired (4.1.6.2), using qualified personnel (4.1.6.3).<\/p>\n<p>The mandatory text sets no number of days. Annex A.4.1.6.2 cites a generally accepted practice of 30 days for critical deficiencies, 90 days for noncritical ones, and impairments as soon as practical; the binding time frame is what the AHJ accepts.<\/p>\n<p>The 2026 edition also requires ITM by personnel qualified for the specific tasks performed, and notification of the AHJ, Civil Defense and the alarm receiving facility when any impairment, preplanned or emergency, is identified. The edition that applies to your facility is set by the Saudi Fire Protection Code (SBC 801) and Civil Defense; see our <a href=\"https:\/\/azeidkgroup.com\/en\/sa\/media-center\/nfpa-25-2026-edition-sprinkler-maintenance-news-en\/\">NFPA 25 2026 edition update<\/a>.<\/p>\t\t\t\t\t\t\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t\t\t<div class=\"elementor-element elementor-element-5511e13 elementor-widget elementor-widget-text-editor\" data-id=\"5511e13\" data-element_type=\"widget\" data-e-type=\"widget\" data-widget_type=\"text-editor.default\">\n\t\t\t\t<div class=\"elementor-widget-container\">\n\t\t\t\t\t\t\t\t\t<h2>Managing impairments under Chapter 15<\/h2>\n<p>The Chapter 15 steps below follow the 2020 edition text as quoted by the City of Cleveland; the 2026 edition confirmed notification for both impairment types.<\/p>\n<ol>\n<li>The owner assigns an impairment coordinator; if no one is designated, the owner is the coordinator.<\/li>\n<li>A tag shows that the system, or part of it, is out of service.<\/li>\n<li>Before a preplanned impairment, the coordinator confirms its extent and duration, assesses the added risk in affected areas, and recommends risk reduction to the owner.<\/li>\n<li>If the system will be out for more than 10 hours in a 24-hour period, the coordinator arranges evacuation of the affected area, an approved fire watch, a temporary water supply, or an approved program to remove ignition sources and limit fuel.<\/li>\n<li>Civil Defense, the insurer, the alarm company, other AHJs and area supervisors are notified.<\/li>\n<li>All necessary tools and materials are assembled at the impairment site before work starts.<\/li>\n<li>For an emergency impairment, including one found during ITM, the coordinator applies the same steps immediately.<\/li>\n<li>On restoration, tests confirm the system works, everyone notified is told, and the tag is removed.<\/li>\n<\/ol>\t\t\t\t\t\t\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t\t\t<div class=\"elementor-element elementor-element-46ed2f5 elementor-widget elementor-widget-text-editor\" data-id=\"46ed2f5\" data-element_type=\"widget\" data-e-type=\"widget\" data-widget_type=\"text-editor.default\">\n\t\t\t\t<div class=\"elementor-widget-container\">\n\t\t\t\t\t\t\t\t\t<h2>Building an effective preventive program<\/h2>\n<ul>\n<li>List every system and component: sprinklers, pumps, standpipes, fire alarm, clean agent and extinguishers.<\/li>\n<li>Map each component to the adopted standard: NFPA 25 for water-based systems, <a href=\"https:\/\/azeidkgroup.com\/en\/sa\/media-center\/nfpa-72-fire-alarm-code-guide\/\">NFPA 72 for fire alarm<\/a> and <a href=\"https:\/\/azeidkgroup.com\/en\/sa\/media-center\/nfpa-10-portable-fire-extinguishers-guide\/\">NFPA 10 for extinguishers<\/a>, plus manufacturer instructions.<\/li>\n<li>Split tasks: trained site staff can do routine visual rounds; qualified technicians handle complex tests.<\/li>\n<li>Put long-interval tests in the calendar from day one.<\/li>\n<li>Keep spares for critical components, such as spare sprinklers, to shorten correction time.<\/li>\n<\/ul>\n<p>Examples of NFPA 25 intervals, as stated in the 2017 edition: fire department connections inspected quarterly, control valves operated through their full range annually, main drain tests annually, and gauges replaced or tested every 5 years. For the full table, see our <a href=\"https:\/\/azeidkgroup.com\/en\/sa\/media-center\/nfpa-25-itm-water-based-systems-guide\/\">NFPA 25 ITM guide<\/a>, and for pump commissioning, our <a href=\"https:\/\/azeidkgroup.com\/en\/sa\/media-center\/fire-pump-acceptance-testing-commissioning\/\">fire pump acceptance testing guide<\/a>.<\/p>\t\t\t\t\t\t\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t\t\t<div class=\"elementor-element elementor-element-89a7713 elementor-widget elementor-widget-text-editor\" data-id=\"89a7713\" data-element_type=\"widget\" data-e-type=\"widget\" data-widget_type=\"text-editor.default\">\n\t\t\t\t<div class=\"elementor-widget-container\">\n\t\t\t\t\t\t\t\t\t<h2>The corrective path, from finding to close-out<\/h2>\n<ol>\n<li>The technician records the finding with location, photos and classification.<\/li>\n<li>If it is an impairment, the owner is told at once and Chapter 15 steps begin.<\/li>\n<li>The contractor proposes a repair and price with like-for-like parts, listed where required.<\/li>\n<li>The owner approves and the work is scheduled within the agreed time frame.<\/li>\n<li>Qualified personnel carry out the repair.<\/li>\n<li>The repaired part is tested, and any valve closed and reopened is checked for position.<\/li>\n<li>The finding is closed in the log, and everyone notified earlier is told protection is restored.<\/li>\n<li>Recurring findings are analyzed to adjust the preventive program.<\/li>\n<\/ol>\t\t\t\t\t\t\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t\t\t<div class=\"elementor-element elementor-element-9b3ce3f elementor-widget elementor-widget-text-editor\" data-id=\"9b3ce3f\" data-element_type=\"widget\" data-e-type=\"widget\" data-widget_type=\"text-editor.default\">\n\t\t\t\t<div class=\"elementor-widget-container\">\n\t\t\t\t\t\t\t\t\t<h2>What a maintenance contract should include<\/h2>\n<ul>\n<li>Systems covered and excluded, and the preventive schedule per the adopted standard and manufacturer instructions.<\/li>\n<li>Task split between the owner&#8217;s staff and the contractor.<\/li>\n<li>Finding classification per NFPA 25, and correction time frames within what the AHJ accepts.<\/li>\n<li>Pricing and approval of corrective work and spares, and emergency call-out response times.<\/li>\n<li>The contractor&#8217;s role in impairment handling and notification.<\/li>\n<li>Reports and records, and technician qualifications for each task.<\/li>\n<\/ul>\n<p>For Saudi contract terms, see our <a href=\"https:\/\/azeidkgroup.com\/en\/sa\/media-center\/fire-systems-maintenance-contracts-saudi-arabia\/\">fire system maintenance contracts guide<\/a>.<\/p>\t\t\t\t\t\t\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t\t\t<div class=\"elementor-element elementor-element-3064e82 elementor-widget elementor-widget-text-editor\" data-id=\"3064e82\" data-element_type=\"widget\" data-e-type=\"widget\" data-widget_type=\"text-editor.default\">\n\t\t\t\t<div class=\"elementor-widget-container\">\n\t\t\t\t\t\t\t\t\t<h2>Common mistakes and what drives cost<\/h2>\n<ul>\n<li>A preventive contract with no corrective clause, so findings pile up.<\/li>\n<li>Reports with no classification or time frame.<\/li>\n<li>Undocumented temporary fixes that become permanent.<\/li>\n<li>Closed valves or disabled systems with no tag and no notification.<\/li>\n<li>Batching repairs past the agreed time frame.<\/li>\n<\/ul>\n<p>Our article on <a href=\"https:\/\/azeidkgroup.com\/en\/sa\/media-center\/maintenance-risk\/\">the risks of deferred fire system maintenance<\/a> shows where these mistakes lead.<\/p>\n<p>Cost is driven by the number, size, complexity and spread of systems across buildings; their age, condition and maintenance history; long-interval tests due during the contract term; the volume of corrective work and spares, usually priced separately; and out-of-hours work, emergency response, and insurer and AHJ requirements.<\/p>\t\t\t\t\t\t\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t\t\t<div class=\"elementor-element elementor-element-9c572e0 elementor-widget elementor-widget-text-editor\" data-id=\"9c572e0\" data-element_type=\"widget\" data-e-type=\"widget\" data-widget_type=\"text-editor.default\">\n\t\t\t\t<div class=\"elementor-widget-container\">\n\t\t\t\t\t\t\t\t\t<h2>How AZEIDK helps<\/h2>\n<p>AZEIDK&#8217;s <a href=\"https:\/\/azeidkgroup.com\/en\/sa\/services\/annual-maintenance-contracts\/\">annual maintenance contracts<\/a> include periodic visits and inspections per the contract scope, checks of fire alarm panels, detectors and notification devices, review of suppression components and fire pumps, documented functional tests, and reports with prioritized corrective actions.<\/p>\n<p>For systems not maintained for a while, we start with an <a href=\"https:\/\/azeidkgroup.com\/en\/sa\/services\/assessment-of-existing-systems-scope-of-work-definition\/\">assessment of existing systems and scope of work definition<\/a>, and technical issues can be raised and followed up through <a href=\"https:\/\/azeidkgroup.com\/en\/sa\/azeidk-care\/\">AZEIDK Care<\/a>.<\/p>\t\t\t\t\t\t\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t\t\t<div class=\"elementor-element elementor-element-7b38cc6 elementor-widget elementor-widget-text-editor\" data-id=\"7b38cc6\" data-element_type=\"widget\" data-e-type=\"widget\" data-widget_type=\"text-editor.default\">\n\t\t\t\t<div class=\"elementor-widget-container\">\n\t\t\t\t\t\t\t\t\t<h2>FAQ<\/h2>\n<div class=\"az-faq\"><details class=\"az-faq__item\"><summary><h3>Is corrective maintenance alone enough for fire systems?<\/h3><\/summary><p>No. Corrective maintenance deals with failures once they appear, but many fire system faults, such as a closed valve or an underperforming pump, stay hidden until a fire. Periodic inspection and testing under NFPA 25 and NFPA 72 finds them early, and correction closes them out.<\/p><\/details><details class=\"az-faq__item\"><summary><h3>What is the difference between a critical and a noncritical deficiency?<\/h3><\/summary><p>A critical deficiency could, if uncorrected, materially affect the system&#8217;s ability to work as intended in a fire. A noncritical one does not, but still needs correcting to meet the standard or allow proper ITM. Occupancy and context affect the classification.<\/p><\/details><details class=\"az-faq__item\"><summary><h3>How quickly must deficiencies be corrected?<\/h3><\/summary><p>The 2026 edition of NFPA 25 requires correction within a time frame approved by the AHJ, with no number of days in the mandatory text. Its annex cites a common practice of 30 days for critical and 90 days for noncritical deficiencies, and impairments as soon as practical.<\/p><\/details><details class=\"az-faq__item\"><summary><h3>Who is responsible for fire system maintenance, the owner or the contractor?<\/h3><\/summary><p>NFPA 25 makes the property owner or designated representative responsible for ITM and for correcting deficiencies. The contractor performs the contracted tasks with qualified personnel, but reviewing reports, approving repairs and closing findings stay with the owner, so the contract should define roles clearly.<\/p><\/details><details class=\"az-faq__item\"><summary><h3>When is a fire watch needed during a shutdown?<\/h3><\/summary><p>If a system is out of service for more than 10 hours in 24, Chapter 15 of NFPA 25 (2020 text) requires the coordinator to arrange one of four measures: evacuation, an approved fire watch, a temporary water supply, or an approved ignition-control program. The AHJ or insurer may require more.<\/p><\/details><details class=\"az-faq__item\"><summary><h3>Does an annual maintenance contract cover repairs?<\/h3><\/summary><p>It depends on the wording. Many contracts cover visits, inspections, tests and reports, with repairs and spares priced separately after owner approval. Make sure the contract states what the fixed price includes, how corrective work is priced, and the correction and call-out times.<\/p><\/details><\/div>\t\t\t\t\t\t\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t\t\t<div class=\"elementor-element elementor-element-e0c9021 elementor-widget elementor-widget-text-editor\" data-id=\"e0c9021\" data-element_type=\"widget\" data-e-type=\"widget\" data-widget_type=\"text-editor.default\">\n\t\t\t\t<div class=\"elementor-widget-container\">\n\t\t\t\t\t\t\t\t\t<div class=\"az-source\"><strong>References:<\/strong> <a href=\"https:\/\/docinfofiles.nfpa.org\/files\/AboutTheCodes\/25\/Errata_25_26_1.pdf\" rel=\"noopener\" target=\"_blank\">NFPA Errata 25-26-1 to the 2026 edition of NFPA 25<\/a>, <a href=\"https:\/\/www.law.cornell.edu\/regulations\/florida\/Fla-Admin-Code-Ann-R-69A-46-030\" rel=\"noopener\" target=\"_blank\">Florida rule 69A-46.030 definitions of deficiencies and impairments (based on NFPA 25)<\/a>, <a href=\"https:\/\/www.clevelandohio.gov\/sites\/clevelandohio\/files\/Fire-Protection-Maintenance%20(11-11-2022).pdf\" rel=\"noopener\" target=\"_blank\">City of Cleveland document quoting NFPA 25 Chapter 15<\/a>, <a href=\"https:\/\/nfsa.org\/2020\/03\/10\/nfpa-25-and-the-building-owner\/\" rel=\"noopener\" target=\"_blank\">NFSA on NFPA 25 and the building owner<\/a>, <a href=\"https:\/\/nfsa.org\/itm-2-2\/key-resources\/\" rel=\"noopener\" target=\"_blank\">NFSA on NFPA 25 ITM definitions<\/a>, and <a href=\"https:\/\/www.hpac.com\/fire-smoke\/article\/55291238\/5-key-changes-ahead-for-fire-protection-systems\" rel=\"noopener\" target=\"_blank\">NFPA Journal on the 2026 changes<\/a>.<\/div>\t\t\t\t\t\t\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t\t\t<div class=\"elementor-element elementor-element-b13e15a elementor-widget elementor-widget-text-editor\" data-id=\"b13e15a\" data-element_type=\"widget\" data-e-type=\"widget\" data-widget_type=\"text-editor.default\">\n\t\t\t\t<div class=\"elementor-widget-container\">\n\t\t\t\t\t\t\t\t\t<p class=\"az-cta\"><strong>Need a maintenance program that covers both preventive and corrective work?<\/strong> Send us your system list and latest inspection report, and our engineers will propose a schedule and contract scope. <a href=\"https:\/\/azeidkgroup.com\/en\/sa\/contact\/\">Contact the AZEIDK team<\/a><\/p>\t\t\t\t\t\t\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t","protected":false},"excerpt":{"rendered":"<p>Preventive vs corrective fire system maintenance: how NFPA 25 classifies deficiencies and impairments, correction time frames, and what a contract should cover.<\/p>\n","protected":false},"author":2,"featured_media":16374,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"_acf_changed":false,"footnotes":""},"categories":[221],"tags":[],"azeidk_region":[223],"class_list":["post-15252","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-azeidk-articles"],"acf":[],"_links":{"self":[{"href":"https:\/\/azeidkgroup.com\/en\/wp-json\/wp\/v2\/posts\/15252","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/azeidkgroup.com\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/azeidkgroup.com\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/azeidkgroup.com\/en\/wp-json\/wp\/v2\/users\/2"}],"replies":[{"embeddable":true,"href":"https:\/\/azeidkgroup.com\/en\/wp-json\/wp\/v2\/comments?post=15252"}],"version-history":[{"count":2,"href":"https:\/\/azeidkgroup.com\/en\/wp-json\/wp\/v2\/posts\/15252\/revisions"}],"predecessor-version":[{"id":16463,"href":"https:\/\/azeidkgroup.com\/en\/wp-json\/wp\/v2\/posts\/15252\/revisions\/16463"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/azeidkgroup.com\/en\/wp-json\/wp\/v2\/media\/16374"}],"wp:attachment":[{"href":"https:\/\/azeidkgroup.com\/en\/wp-json\/wp\/v2\/media?parent=15252"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/azeidkgroup.com\/en\/wp-json\/wp\/v2\/categories?post=15252"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/azeidkgroup.com\/en\/wp-json\/wp\/v2\/tags?post=15252"},{"taxonomy":"azeidk_region","embeddable":true,"href":"https:\/\/azeidkgroup.com\/en\/wp-json\/wp\/v2\/azeidk_region?post=15252"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}