{"id":12496,"date":"2026-06-11T18:32:08","date_gmt":"2026-06-11T18:32:08","guid":{"rendered":"https:\/\/azeidk.com\/?p=12496"},"modified":"2026-10-30T16:40:44","modified_gmt":"2026-10-30T16:40:44","slug":"fire-system-installation-mistakes-warehouses-factories","status":"publish","type":"post","link":"https:\/\/azeidkgroup.com\/en\/sa\/media-center\/fire-system-installation-mistakes-warehouses-factories\/","title":{"rendered":"Fire Protection Installation Mistakes in Saudi Projects and How to Avoid Them"},"content":{"rendered":"\t\t<div data-elementor-type=\"wp-post\" data-elementor-id=\"12496\" class=\"elementor elementor-12496 elementor-12511\" data-elementor-post-type=\"post\">\n\t\t\t\t<div class=\"elementor-element elementor-element-bd68a4e e-con-full az-el-article e-flex e-con e-parent\" data-id=\"bd68a4e\" data-element_type=\"container\" data-e-type=\"container\">\n\t\t\t\t<div class=\"elementor-element elementor-element-42ab103 elementor-widget elementor-widget-text-editor\" data-id=\"42ab103\" data-element_type=\"widget\" data-e-type=\"widget\" data-widget_type=\"text-editor.default\">\n\t\t\t\t<div class=\"elementor-widget-container\">\n\t\t\t\t\t\t\t\t\t<p class=\"az-intro\">Most fire system installation mistakes in warehouses and factories happen on site: storage that outgrows the design, a light under a sprinkler, a valve left shut, a smoke detector too high to work, or a test dropped to meet handover. This guide covers the mistakes that most often undermine these systems, the requirement or good practice behind each, and how to check for them.<\/p>\t\t\t\t\t\t\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t\t\t<div class=\"elementor-element elementor-element-92064fa elementor-widget elementor-widget-text-editor\" data-id=\"92064fa\" data-element_type=\"widget\" data-e-type=\"widget\" data-widget_type=\"text-editor.default\">\n\t\t\t\t<div class=\"elementor-widget-container\">\n\t\t\t\t\t\t\t\t\t<div class=\"az-keybox\"><h2>Key takeaways<\/h2>\n<ul>\n<li>Install for the planned storage height, commodity and arrangement; NFPA 25 requires owners to have changes evaluated first.<\/li>\n<li>Keep new lights, ducts and trays clear of sprinklers; early suppression fast response (ESFR) sprinklers are particularly sensitive to obstructions.<\/li>\n<li>In NFPA data, a system shut off before the fire was the most common reason sprinklers failed to operate, so supervise and inspect control valves.<\/li>\n<li>The 2025 edition of NFPA 72 limits prescriptive spot smoke detector spacing to ceilings up to 12.2 m; higher roofs need a performance-based design.<\/li>\n<li>Hydrostatic, air, drain, pump and alarm acceptance tests prove the installation works; record every result.<\/li>\n<\/ul><\/div>\t\t\t\t\t\t\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t\t\t<div class=\"elementor-element elementor-element-300344a elementor-widget elementor-widget-text-editor\" data-id=\"300344a\" data-element_type=\"widget\" data-e-type=\"widget\" data-widget_type=\"text-editor.default\">\n\t\t\t\t<div class=\"elementor-widget-container\">\n\t\t\t\t\t\t\t\t\t<h2>Why warehouses and factories are unforgiving<\/h2>\n<p>These buildings combine tall blocks of fuel, high roofs, dust, heat, forklift traffic and layouts that change with every storage contract or production line. Systems are often installed while racks and machinery are still going in, so they match the drawings at handover but not the building&#8217;s use months later. Our <a href=\"https:\/\/azeidkgroup.com\/en\/sa\/media-center\/warehouse-high-rack-storage-fire-protection-esfr\/\">warehouse and high-rack storage guide<\/a> covers design principles and our <a href=\"https:\/\/azeidkgroup.com\/en\/sa\/media-center\/factories-industrial-fire-protection-guide\/\">factory fire protection guide<\/a> covers protection by hazard; this guide focuses on installation and operation mistakes.<\/p>\t\t\t\t\t\t\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t\t\t<div class=\"elementor-element elementor-element-e7b6601 elementor-widget elementor-widget-text-editor\" data-id=\"e7b6601\" data-element_type=\"widget\" data-e-type=\"widget\" data-widget_type=\"text-editor.default\">\n\t\t\t\t<div class=\"elementor-widget-container\">\n\t\t\t\t\t\t\t\t\t<h2>Storage and layout mistakes<\/h2>\n<h3>1. Installing for the drawings, not the planned storage<\/h3>\n<p>Since its 2002 edition, NFPA 13, the sprinkler standard of the National Fire Protection Association (NFPA), has called for an owner&#8217;s certificate telling the installer the intended use of the building, the materials in it and the maximum storage height. According to the National Fire Sprinkler Association (NFSA) summary of the 2025 edition, the standard now adds a storage plan covering maximum storage height, commodities and arrangement, and confirms that water supply analysis is the owner&#8217;s responsibility.<\/p>\n<p>The common mistake is a design for a generic &#8220;warehouse&#8221;, followed by taller racks or plastic pallets. NFPA 25 requires the owner not to change the occupancy, use, process or stored materials without evaluating whether the fire protection systems can protect the new condition, as NFSA summarizes. Marking the maximum storage height on racks is good practice.<\/p>\n<h3>2. Obstructions and lost clearance below sprinklers<\/h3>\n<p>Lights, ducts, cable trays, conveyors and mezzanines get added after the sprinklers, or goods are pushed into the space below them, and low sprinklers and in-rack piping take forklift strikes. NFSA describes ESFR and control mode specific application (CMSA) sprinklers as particularly sensitive to obstructions. Each sprinkler&#8217;s listing sets the clearance it needs: the <a href=\"https:\/\/www.tyco-fire.com\/Products-and-Solutions\/Sprinklers-Nozzles-and-Accessories\/Storage\/model_esfr22_sprinklers_fsp\/model-esfr-22-sprinklers\" rel=\"noopener\" target=\"_blank\">datasheet for the TYCO ESFR-22 (TFP321, December 2024)<\/a>, for example, requires at least 914 mm (36 in) of clearance to the commodity; check that distance at acceptance. The fix is a coordination drawing approved before installation, guards where forklifts operate, and a fresh inspection after every fit-out.<\/p>\n<h3>3. Blocked hose cabinets, valves and the fire department connection<\/h3>\n<p>Pallets get stacked in front of fire hose cabinets, the fire department connection (FDC) ends up behind a loading bay where trucks park, and valve signs go missing. It is good practice to paint keep-clear zones in front of this equipment and check them on weekly walk-throughs.<\/p>\t\t\t\t\t\t\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t\t\t<div class=\"elementor-element elementor-element-068bded elementor-widget elementor-widget-text-editor\" data-id=\"068bded\" data-element_type=\"widget\" data-e-type=\"widget\" data-widget_type=\"text-editor.default\">\n\t\t\t\t<div class=\"elementor-widget-container\">\n\t\t\t\t\t\t\t\t\t<h2>Water-side mistakes<\/h2>\n<h3>4. Control valves left closed or unsupervised<\/h3>\n<p>NFPA&#8217;s report on U.S. experience with sprinklers (October 2026, 2020\u20132024 data) found that the most common reason sprinklers failed to operate was the system being shut off before the fire, and that ineffective operation often involved getting water to the fire. The International Building Code model text (<a href=\"https:\/\/codes.iccsafe.org\/content\/IFC2018\/chapter-9-fire-protection-and-life-safety-systems\" rel=\"noopener\" target=\"_blank\">as published by the ICC<\/a>) requires valves controlling sprinkler water supplies, pumps, tanks and waterflow switches to be electrically supervised by a listed fire alarm control unit, with limited exceptions; confirm the rule in the adopted edition of the Saudi Fire Protection Code (SBC 801).<\/p>\n<p>NFPA 25 (2026 edition) sets valve inspections from weekly to quarterly, depending on whether a valve is locked or electrically supervised, and a valve status test after reopening, as our <a href=\"https:\/\/azeidkgroup.com\/en\/sa\/media-center\/nfpa-25-itm-water-based-systems-guide\/\">NFPA 25 guide<\/a> explains. Typical faults are supervisory switches not wired to the panel and valves shut for tie-ins and never reopened. A valve register, locks and impairment tags help; our <a href=\"https:\/\/azeidkgroup.com\/en\/sa\/media-center\/fire-protection-valves-network-components-guide\/\">valves and network components guide<\/a> explains what each valve does.<\/p>\n<h3>5. Pumps and water supplies that do not match the demand<\/h3>\n<p>Pumps are sometimes picked from a catalog near the calculated demand, or tanks sized for a smaller first phase, and storage later rises without a pump or tank check. NFPA 20 requires churn pressure between 101% and 140% of rated pressure and 150% of rated flow at no less than 65% of rated pressure, as the Hydraulic Institute summarizes. Compare the pump curve with system demand plus hose allowance for the full duration, and size the test header and flow meter for the 150% test. Our <a href=\"https:\/\/azeidkgroup.com\/en\/sa\/media-center\/fire-pumps-selection-design-approvals-guide\/\">fire pump selection guide<\/a> covers the criteria.<\/p>\t\t\t\t\t\t\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t\t\t<div class=\"elementor-element elementor-element-3288631 elementor-widget elementor-widget-text-editor\" data-id=\"3288631\" data-element_type=\"widget\" data-e-type=\"widget\" data-widget_type=\"text-editor.default\">\n\t\t\t\t<div class=\"elementor-widget-container\">\n\t\t\t\t\t\t\t\t\t<h2>Detection and alarm mistakes<\/h2>\n<h3>6. Spot smoke detectors on high-bay roofs<\/h3>\n<p>The 2025 edition of NFPA 72 allows the prescriptive spacing method for spot smoke detectors only for ceilings up to 12.2 m (40 ft); above that, a performance analysis and design is required, according to CSE magazine. Smoke can also stratify under a hot roof before reaching the detectors, and the International Building Code model text requires access to every fire alarm device for inspection, maintenance and testing, which is hard at 14 m without a personnel lift.<\/p>\n<p>Common alternatives are beam detectors and aspirating systems testable from closer to the floor, flame detectors for flammable liquids, and heat detectors where dust, steam or forklift exhaust would cause unwanted alarms, as our <a href=\"https:\/\/azeidkgroup.com\/en\/sa\/media-center\/fire-detector-types-selection\/\">fire detector selection guide<\/a> explains.<\/p>\t\t\t\t\t\t\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t\t\t<div class=\"elementor-element elementor-element-9755647 elementor-widget elementor-widget-text-editor\" data-id=\"9755647\" data-element_type=\"widget\" data-e-type=\"widget\" data-widget_type=\"text-editor.default\">\n\t\t\t\t<div class=\"elementor-widget-container\">\n\t\t\t\t\t\t\t\t\t<h2>Commissioning mistakes: shortened acceptance tests<\/h2>\n<p>Drawings do not prove a system works; tests do. The core tests:<\/p>\n<div class=\"az-table-wrap\"><table>\n<thead><tr><th>Test<\/th><th>What it proves<\/th><th>Typical value or record<\/th><\/tr><\/thead>\n<tbody>\n<tr><td>Hydrostatic test of sprinkler piping<\/td><td>Tightness of pipe and joints<\/td><td>200 psi (13.8 bar) for 2 hours, or 50 psi (3.4 bar) above static pressure where static exceeds 150 psi (10.3 bar)<\/td><\/tr>\n<tr><td>Air test of dry systems<\/td><td>Air tightness<\/td><td>40 psi (2.7 bar) for 24 hours, with a drop of no more than 1.5 psi (0.1 bar)<\/td><\/tr>\n<tr><td>Underground flushing<\/td><td>Debris removed before connection<\/td><td>Flow set by pipe size; underground piping certificate<\/td><\/tr>\n<tr><td>Main drain test<\/td><td>Baseline supply pressure<\/td><td>Reading recorded for later comparison<\/td><\/tr>\n<tr><td>Fire pump field acceptance<\/td><td>Pump, driver and controller match the certified curve<\/td><td>Manufacturer&#8217;s representatives present; six manual and six automatic starts<\/td><\/tr>\n<tr><td>Fire alarm acceptance test<\/td><td>Every device and output works<\/td><td>100% of devices tested; record of completion<\/td><\/tr>\n<\/tbody>\n<\/table><\/div>\n<p>The pressure and air values come from the Philadelphia aboveground piping certificate and the Idaho checklist (NFPA 13, 2019 edition); pump details are in our <a href=\"https:\/\/azeidkgroup.com\/en\/sa\/media-center\/fire-pump-acceptance-testing-commissioning\/\">fire pump acceptance testing guide<\/a>. Then run an integrated test of waterflow, valve supervisory and pump running signals and commands such as air handling shutdown.<\/p>\t\t\t\t\t\t\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t\t\t<div class=\"elementor-element elementor-element-fb32448 elementor-widget elementor-widget-text-editor\" data-id=\"fb32448\" data-element_type=\"widget\" data-e-type=\"widget\" data-widget_type=\"text-editor.default\">\n\t\t\t\t<div class=\"elementor-widget-container\">\n\t\t\t\t\t\t\t\t\t<h2>Pre-handover checklist<\/h2>\n<ol>\n<li>File the owner&#8217;s certificate and storage plan, and mark the maximum storage height on site.<\/li>\n<li>Walk the racks with the sprinkler drawings: obstructions, clearance and guards.<\/li>\n<li>Confirm every control valve is open, locked or supervised, labeled and reporting.<\/li>\n<li>Compare the pump curve, test results and water supply analysis with the hydraulic demand.<\/li>\n<li>Check detector types and heights against NFPA 72 limits and test access.<\/li>\n<li>Collect signed hydrostatic, air, flushing, drain, pump and alarm test certificates.<\/li>\n<li>Fix the hydraulic design information sign on the riser, and stock spare sprinklers with their wrench.<\/li>\n<li>Hand over as-built drawings, manuals and the impairment procedure, and name who reviews future changes.<\/li>\n<\/ol>\t\t\t\t\t\t\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t\t\t<div class=\"elementor-element elementor-element-9bbb379 elementor-widget elementor-widget-text-editor\" data-id=\"9bbb379\" data-element_type=\"widget\" data-e-type=\"widget\" data-widget_type=\"text-editor.default\">\n\t\t\t\t<div class=\"elementor-widget-container\">\n\t\t\t\t\t\t\t\t\t<h2>After handover: keeping the system matched to the building<\/h2>\n<p>Most later problems start with a small change: an extra rack, a mezzanine, a new machine or new packaging. Tie every such change to a prior engineering review, and run NFPA 25 and NFPA 72 inspections at the intervals the adopted edition and Civil Defense set.<\/p>\n<h3>What drives the cost of correction<\/h3>\n<ul>\n<li>When the mistake is found: on drawings or after racks and ceilings are in.<\/li>\n<li>Lowering sprinklers, adding in-rack sprinklers or changing sprinkler type.<\/li>\n<li>Upgrading pump capacity, tank volume or pipe sizes.<\/li>\n<li>Retesting, reapproval and downtime.<\/li>\n<\/ul>\t\t\t\t\t\t\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t\t\t<div class=\"elementor-element elementor-element-6062617 elementor-widget elementor-widget-text-editor\" data-id=\"6062617\" data-element_type=\"widget\" data-e-type=\"widget\" data-widget_type=\"text-editor.default\">\n\t\t\t\t<div class=\"elementor-widget-container\">\n\t\t\t\t\t\t\t\t\t<h2>How AZEIDK helps<\/h2>\n<p>AZEIDK&#8217;s <a href=\"https:\/\/azeidkgroup.com\/en\/sa\/solutions\/fire-fighting-systems\/\">fire fighting systems solutions<\/a> cover fire fighting networks, fire pumps, automatic sprinklers, hose reels and cabinets, and valves and pipes, with supply, installation, testing and commissioning, and system readiness support for handover and operation. Our <a href=\"https:\/\/azeidkgroup.com\/en\/sa\/services\/assessment-of-existing-systems-scope-of-work-definition\/\">assessment of existing systems<\/a> inspects a warehouse or factory whose use has changed and identifies technical gaps and priorities, while our <a href=\"https:\/\/azeidkgroup.com\/en\/sa\/services\/documentation-final-handover\/\">documentation and final handover<\/a> service compiles as-built drawings, test reports and available equipment certificates into a structured handover package.<\/p>\n<p>Brands we supply include Jack Pump fire pumps, American Fire Control (AFC) network components and Victaulic sprinklers; we recommend verifying each model&#8217;s approval in its datasheet.<\/p>\t\t\t\t\t\t\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t\t\t<div class=\"elementor-element elementor-element-36ace50 elementor-widget elementor-widget-text-editor\" data-id=\"36ace50\" data-element_type=\"widget\" data-e-type=\"widget\" data-widget_type=\"text-editor.default\">\n\t\t\t\t<div class=\"elementor-widget-container\">\n\t\t\t\t\t\t\t\t\t<h2>FAQ<\/h2>\n<div class=\"az-faq\"><details class=\"az-faq__item\"><summary><h3>What is the most common fire system installation mistake in warehouses?<\/h3><\/summary><p>Among the most damaging are storage changes without a design review, new obstructions below sprinklers, and control valves left closed or unsupervised; NFPA data shows a system shut off before the fire is the most common reason sprinklers fail to operate. Supervise valves, mark the maximum storage height and review changes first.<\/p><\/details><details class=\"az-faq__item\"><summary><h3>Who is responsible for reviewing the system when storage changes after handover?<\/h3><\/summary><p>The owner. As NFSA summarizes NFPA 25, the owner must not change the occupancy, use or stored materials without evaluating whether the fire protection systems can protect the new condition, and must correct it if it is not adequate. Commission an engineering review before new racks or new goods arrive.<\/p><\/details><details class=\"az-faq__item\"><summary><h3>Which tests are needed before a warehouse fire system is handed over?<\/h3><\/summary><p>Typically a hydrostatic test of sprinkler piping, an air test for dry systems, underground flushing, a main drain test, the fire pump field acceptance test, a 100% fire alarm device test with a record of completion, and an integrated test of signals and commands. The authority having jurisdiction (AHJ) and adopted edition set the details.<\/p><\/details><details class=\"az-faq__item\"><summary><h3>Why do spot smoke detectors not suit many high-bay warehouses?<\/h3><\/summary><p>Because the 2025 edition of NFPA 72 limits their prescriptive spacing method to ceilings up to 12.2 m, smoke can stratify under a hot roof before reaching them, and testing them at great height is difficult. Beam detectors, aspirating systems or flame detectors are often used instead, depending on the hazard.<\/p><\/details><details class=\"az-faq__item\"><summary><h3>Is the first-phase fire pump enough for a warehouse extension?<\/h3><\/summary><p>Not necessarily. An extension or higher storage can raise the hydraulic demand, so redo the calculations and compare them with the pump&#8217;s latest flow test curve and the tank capacity for the full duration. If the curve does not cover the new demand with a margin, upgrade the pump or supply before the extension opens.<\/p><\/details><\/div>\t\t\t\t\t\t\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t\t\t<div class=\"elementor-element elementor-element-963d450 elementor-widget elementor-widget-text-editor\" data-id=\"963d450\" data-element_type=\"widget\" data-e-type=\"widget\" data-widget_type=\"text-editor.default\">\n\t\t\t\t<div class=\"elementor-widget-container\">\n\t\t\t\t\t\t\t\t\t<div class=\"az-source\"><strong>References:<\/strong> <a href=\"https:\/\/www.nfpa.org\/education-and-research\/research\/nfpa-research\/fire-statistical-reports\/us-experience-with-sprinklers\" rel=\"noopener\" target=\"_blank\">NFPA, U.S. Experience with Sprinklers (2026)<\/a>, the <a href=\"https:\/\/nfsa.org\/2024\/07\/23\/changes-in-the-2025-edition-of-nfpa-13-technotes\/\" rel=\"noopener\" target=\"_blank\">NFSA summary of 2025 NFPA 13 changes<\/a>, <a href=\"https:\/\/nfsa.org\/2020\/03\/10\/nfpa-25-and-the-building-owner\/\" rel=\"noopener\" target=\"_blank\">NFSA on NFPA 25 and the building owner<\/a>, <a href=\"https:\/\/www.csemag.com\/what-you-need-to-know-about-the-2025-edition-of-nfpa-72\/\" rel=\"noopener\" target=\"_blank\">CSE magazine on the 2025 edition of NFPA 72<\/a>, the <a href=\"https:\/\/www.pumps.org\/2023\/06\/08\/ensure-fire-pumps-meet-performance-mechanical-standards\/\" rel=\"noopener\" target=\"_blank\">Hydraulic Institute on fire pump performance requirements<\/a>.<\/div>\t\t\t\t\t\t\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t\t\t<div class=\"elementor-element elementor-element-dd2d030 elementor-widget elementor-widget-text-editor\" data-id=\"dd2d030\" data-element_type=\"widget\" data-e-type=\"widget\" data-widget_type=\"text-editor.default\">\n\t\t\t\t<div class=\"elementor-widget-container\">\n\t\t\t\t\t\t\t\t\t<p class=\"az-cta\"><strong>Handing over a warehouse or factory soon, or changing how you store?<\/strong> Send us the drawings, storage data and test results, and our engineers will review system readiness before handover or after the change. <a href=\"https:\/\/azeidkgroup.com\/en\/sa\/contact\/\">Contact the AZEIDK team<\/a><\/p>\t\t\t\t\t\t\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t","protected":false},"excerpt":{"rendered":"<p>Fire system installation mistakes in warehouses and factories: storage changes, obstructions, closed valves, high-bay detection, pumps and acceptance tests.<\/p>\n","protected":false},"author":2,"featured_media":16313,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"_acf_changed":false,"footnotes":""},"categories":[221,219],"tags":[],"azeidk_region":[223],"class_list":["post-12496","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-azeidk-articles","category-azeidk-blog"],"acf":[],"_links":{"self":[{"href":"https:\/\/azeidkgroup.com\/en\/wp-json\/wp\/v2\/posts\/12496","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/azeidkgroup.com\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/azeidkgroup.com\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/azeidkgroup.com\/en\/wp-json\/wp\/v2\/users\/2"}],"replies":[{"embeddable":true,"href":"https:\/\/azeidkgroup.com\/en\/wp-json\/wp\/v2\/comments?post=12496"}],"version-history":[{"count":4,"href":"https:\/\/azeidkgroup.com\/en\/wp-json\/wp\/v2\/posts\/12496\/revisions"}],"predecessor-version":[{"id":18136,"href":"https:\/\/azeidkgroup.com\/en\/wp-json\/wp\/v2\/posts\/12496\/revisions\/18136"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/azeidkgroup.com\/en\/wp-json\/wp\/v2\/media\/16313"}],"wp:attachment":[{"href":"https:\/\/azeidkgroup.com\/en\/wp-json\/wp\/v2\/media?parent=12496"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/azeidkgroup.com\/en\/wp-json\/wp\/v2\/categories?post=12496"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/azeidkgroup.com\/en\/wp-json\/wp\/v2\/tags?post=12496"},{"taxonomy":"azeidk_region","embeddable":true,"href":"https:\/\/azeidkgroup.com\/en\/wp-json\/wp\/v2\/azeidk_region?post=12496"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}