{"id":12471,"date":"2026-06-11T18:11:58","date_gmt":"2026-06-11T18:11:58","guid":{"rendered":"https:\/\/azeidk.com\/?p=12471"},"modified":"2026-10-29T19:03:52","modified_gmt":"2026-10-29T19:03:52","slug":"civil-defense-fire-safety-approval-saudi-arabia","status":"publish","type":"post","link":"https:\/\/azeidkgroup.com\/en\/sa\/media-center\/civil-defense-fire-safety-approval-saudi-arabia\/","title":{"rendered":"Civil Defense Fire Safety Approval in Saudi Arabia: Step by Step"},"content":{"rendered":"\t\t<div data-elementor-type=\"wp-post\" data-elementor-id=\"12471\" class=\"elementor elementor-12471 elementor-12489\" data-elementor-post-type=\"post\">\n\t\t\t\t<div class=\"elementor-element elementor-element-4df74bd e-con-full az-el-article e-flex e-con e-parent\" data-id=\"4df74bd\" data-element_type=\"container\" data-e-type=\"container\">\n\t\t\t\t<div class=\"elementor-element elementor-element-733b439 elementor-widget elementor-widget-text-editor\" data-id=\"733b439\" data-element_type=\"widget\" data-e-type=\"widget\" data-widget_type=\"text-editor.default\">\n\t\t\t\t<div class=\"elementor-widget-container\">\n\t\t\t\t\t\t\t\t\t<p class=\"az-intro\">Civil Defense fire safety approval in Saudi Arabia is not a single certificate but a sequence: design review within the building permit, inspections during construction, the occupancy certificate from the municipality, then the Civil Defense facility license on the Salamah portal and its renewal. This guide explains each step, who handles it and what to prepare.<\/p>\t\t\t\t\t\t\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t\t\t<div class=\"elementor-element elementor-element-9a67d3d elementor-widget elementor-widget-text-editor\" data-id=\"9a67d3d\" data-element_type=\"widget\" data-e-type=\"widget\" data-widget_type=\"text-editor.default\">\n\t\t\t\t<div class=\"elementor-widget-container\">\n\t\t\t\t\t\t\t\t\t<div class=\"az-keybox\"><h2>Key takeaways<\/h2>\n<ul>\n<li>Design compliance with the Saudi Building Code is checked within the building permit application on the Balady platform, and the issued permit data is sent to bodies including Civil Defense.<\/li>\n<li>Inspections follow construction stages, and a building may not be occupied before the municipal occupancy certificate.<\/li>\n<li>The activity&#8217;s risk level sets the Salamah path: direct, with a safety tools invoice or technical report, or indirect, with a safety company contract, maintenance contracts and an inspection.<\/li>\n<li>In August 2026 the Insurance Authority announced that third-party insurance will become a license requirement for activities subject to mandatory insurance.<\/li>\n<li>Renewals and changes of activity reopen the file, so keep drawings, test certificates and maintenance records ready for the life of the facility.<\/li>\n<\/ul><\/div>\t\t\t\t\t\t\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t\t\t<div class=\"elementor-element elementor-element-14e63a0 elementor-widget elementor-widget-text-editor\" data-id=\"14e63a0\" data-element_type=\"widget\" data-e-type=\"widget\" data-widget_type=\"text-editor.default\">\n\t\t\t\t<div class=\"elementor-widget-container\">\n\t\t\t\t\t\t\t\t\t<h2>The approval stages at a glance<\/h2>\n<p>The General Directorate of Civil Defense monitors fire prevention and protection requirements at all stages of construction, maintenance, operation and storage, under Article 10 of the <a href=\"https:\/\/momah.gov.sa\/sites\/default\/files\/2025-10\/allayht%20altnfydhyt%20lnzam%20ttbyq%20kwd%20albna%20als%60wdy.pdf\" rel=\"noopener\" target=\"_blank\">Implementing Regulation of the Saudi Building Code Application Law<\/a>. The platform and parties change from stage to stage:<\/p>\n<div class=\"az-table-wrap\"><table>\n<thead><tr><th>Stage<\/th><th>Platform or party<\/th><th>Output<\/th><\/tr><\/thead>\n<tbody>\n<tr><td>Occupancy and licensing path<\/td><td>Owner and consultant; Salamah investor journey service<\/td><td>Clear design basis and licensing path<\/td><\/tr>\n<tr><td>Design review and building permit<\/td><td>Balady: design engineering office, technical inspection company, municipality<\/td><td>Design approval certificate, then building permit<\/td><\/tr>\n<tr><td>Construction and inspection<\/td><td>Supervising engineering office, contractor, inspector<\/td><td>Stage inspections and test records<\/td><\/tr>\n<tr><td>Testing and handover<\/td><td>Contractor, supervising office, owner<\/td><td>Test and commissioning certificates, as-built drawings<\/td><\/tr>\n<tr><td>Occupancy certificate<\/td><td>Balady: engineering office and municipality<\/td><td>Occupancy certificate, then compliance certificate<\/td><\/tr>\n<tr><td>Civil Defense license<\/td><td>Salamah<\/td><td>Facility license<\/td><\/tr>\n<tr><td>Renewal and amendment<\/td><td>Salamah<\/td><td>Renewed or amended license<\/td><\/tr>\n<\/tbody>\n<\/table><\/div>\t\t\t\t\t\t\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t\t\t<div class=\"elementor-element elementor-element-612c3cd elementor-widget elementor-widget-text-editor\" data-id=\"612c3cd\" data-element_type=\"widget\" data-e-type=\"widget\" data-widget_type=\"text-editor.default\">\n\t\t\t\t<div class=\"elementor-widget-container\">\n\t\t\t\t\t\t\t\t\t<h2>Step 1: Confirm occupancy and licensing path before design<\/h2>\n<p>Requirements start from the occupancy classification in the Saudi General Building Code (SBC 201) and the facility&#8217;s actual activity, as our <a href=\"https:\/\/azeidkgroup.com\/en\/sa\/media-center\/saudi-civil-defense-requirements-buildings-facilities\/\">guide to Civil Defense requirements for buildings<\/a> explains. It is good practice to confirm the licensing path now: the Salamah investor journey service shows whether the activity is direct or indirect, which decides whether you will need a safety company contract and an inspection before the license.<\/p>\n<p>Check the other authorities involved too. A hotel&#8217;s tourism license, for example, requires a valid Civil Defense permit, as our <a href=\"https:\/\/azeidkgroup.com\/en\/sa\/media-center\/hotels-hospitality-fire-life-safety-guide\/\">hotel fire safety guide<\/a> notes, and activities subject to mandatory insurance need the third-party policy.<\/p>\t\t\t\t\t\t\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t\t\t<div class=\"elementor-element elementor-element-48ff4ea elementor-widget elementor-widget-text-editor\" data-id=\"48ff4ea\" data-element_type=\"widget\" data-e-type=\"widget\" data-widget_type=\"text-editor.default\">\n\t\t\t\t<div class=\"elementor-widget-container\">\n\t\t\t\t\t\t\t\t\t<h2>Step 2: Design review within the building permit<\/h2>\n<p>Article 13 of the Implementing Regulation bars issuing a permit to build, renovate, alter, demolish, change use or extend until the documents and plans are verified against the code and approved by the relevant authorities.<\/p>\n<p>Balady applies this in the <a href=\"https:\/\/momah.gov.sa\/ar\/node\/5104\" rel=\"noopener\" target=\"_blank\">building permit service<\/a> described by the Ministry of Municipalities and Housing. The owner authorizes a design engineering office to prepare and upload the drawings; the request is assigned automatically through the insurer to a technical inspection company that checks it against the Saudi Building Code; then a municipal officer reviews it and a design approval certificate is issued. Approval of relevant external bodies is a condition where the activity requires it, and once the permit is issued its data is sent to linked bodies including Civil Defense.<\/p>\n<p>It is good practice for the consultant to submit a fire protection design basis listing the applicable sections of the Saudi Fire Protection Code (SBC 801) and the referenced standard editions, as our <a href=\"https:\/\/azeidkgroup.com\/en\/sa\/media-center\/saudi-building-code-sbc-801-fire-protection\/\">SBC 801 guide<\/a> recommends. A comment settled on paper costs far less than a change on site.<\/p>\t\t\t\t\t\t\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t\t\t<div class=\"elementor-element elementor-element-5119dea elementor-widget elementor-widget-text-editor\" data-id=\"5119dea\" data-element_type=\"widget\" data-e-type=\"widget\" data-widget_type=\"text-editor.default\">\n\t\t\t\t<div class=\"elementor-widget-container\">\n\t\t\t\t\t\t\t\t\t<h2>Step 3: Inspection during construction and testing before handover<\/h2>\n<p>As amended, the Implementing Regulation has inspections follow the construction stages in sequence; work may move from one stage to the next without the relevant authorities&#8217; approval, but they may suspend the building permit at any stage. The permit holder or representative must notify the inspector when work is ready and provide the documents and drawings the inspection needs.<\/p>\n<p>Fire systems need acceptance tests under the standards the code references, such as those of the National Fire Protection Association (NFPA), as our <a href=\"https:\/\/azeidkgroup.com\/en\/sa\/media-center\/fire-pump-acceptance-testing-commissioning\/\">fire pump acceptance testing guide<\/a> explains for pumps, and every fire alarm device is tested and its records signed, as our <a href=\"https:\/\/azeidkgroup.com\/en\/sa\/media-center\/nfpa-72-fire-alarm-code-guide\/\">NFPA 72 guide<\/a> describes. It is good practice to assemble the handover file before requesting any inspection:<\/p>\n<ol>\n<li>Approved and as-built drawings for fire alarm, firefighting and special systems.<\/li>\n<li>Design basis, hydraulic and battery calculations, and the sequence of operation.<\/li>\n<li>Acceptance and commissioning test certificates for each system, signed by the contractor and supervising office.<\/li>\n<li>Product datasheets with their listing or approval certificates, and SABER conformity where required.<\/li>\n<li>Zone and control valve schedules with locations and status.<\/li>\n<li>Evacuation plan, operating instructions and any maintenance contract.<\/li>\n<\/ol>\t\t\t\t\t\t\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t\t\t<div class=\"elementor-element elementor-element-54df37f elementor-widget elementor-widget-text-editor\" data-id=\"54df37f\" data-element_type=\"widget\" data-e-type=\"widget\" data-widget_type=\"text-editor.default\">\n\t\t\t\t<div class=\"elementor-widget-container\">\n\t\t\t\t\t\t\t\t\t<h2>Step 4: The occupancy certificate<\/h2>\n<p>Article 16 of the Implementing Regulation states that a building may not be occupied before it has an occupancy certificate from the municipality. In the Balady <a href=\"https:\/\/momah.gov.sa\/ar\/e-services\/issuing-occupancy-certificate\" rel=\"noopener\" target=\"_blank\">occupancy certificate service<\/a>, the owner selects the building permit and the engineering office, the office completes the data and prepares the report, and the municipality approves the certificate. Non-residential buildings require a contract with an engineering office, and a compliance certificate is then issued proactively.<\/p>\n<p>The occupancy certificate covers the building, while the Civil Defense license is obtained for the facility and its activity on Salamah, so an operating facility usually needs both.<\/p>\t\t\t\t\t\t\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t\t\t<div class=\"elementor-element elementor-element-4d0b3b2 elementor-widget elementor-widget-text-editor\" data-id=\"4d0b3b2\" data-element_type=\"widget\" data-e-type=\"widget\" data-widget_type=\"text-editor.default\">\n\t\t\t\t<div class=\"elementor-widget-container\">\n\t\t\t\t\t\t\t\t\t<h2>Step 5: The Civil Defense license on Salamah<\/h2>\n<p>Facilities obtain, renew, amend and cancel Civil Defense licenses on Salamah, as our <a href=\"https:\/\/azeidkgroup.com\/en\/sa\/media-center\/salamah-platform-civil-defense-license-digital-news-en\/\">Salamah portal update<\/a> explains. According to the undated <a href=\"https:\/\/elm.sa\/ar\/our-business\/digital-products\/Documents\/En\/Salamah%20EN.pdf\" rel=\"noopener\" target=\"_blank\">portal fact sheet<\/a> published by Elm, the path depends on the activity&#8217;s risk level:<\/p>\n<div class=\"az-table-wrap\"><table>\n<thead><tr><th>Path<\/th><th>Activities<\/th><th>What is submitted<\/th><th>Inspection<\/th><\/tr><\/thead>\n<tbody>\n<tr><td>Direct<\/td><td>Low and medium risk<\/td><td>Safety tools invoice or technical report, depending on the activity, entered in the application<\/td><td>Licensed directly; low-risk licenses issued instantly<\/td><\/tr>\n<tr><td>Indirect<\/td><td>High risk<\/td><td>Contract with a safety company and maintenance contracts<\/td><td>Civil Defense inspects before issuing the license<\/td><\/tr>\n<\/tbody>\n<\/table><\/div>\n<p>Safety companies approved on the portal issue safety tools invoices and installation certificates and provide maintenance contracts, approved engineering and technical services offices issue technical reports, and the portal lists approved companies. After initial approval, the applicant receives a text message with a verification code to give to the safety company.<\/p>\n<p>On 16 August 2026, the <a href=\"https:\/\/www.ia.gov.sa\/en\/media-center\/news\/122\" rel=\"noopener\" target=\"_blank\">Insurance Authority announced<\/a>, with Civil Defense, that a third-party cooperative insurance policy for crowded places and high-risk activities will become a key requirement for the Civil Defense license of activities subject to mandatory insurance, applied in phases under Council of Ministers Resolution No. 103.<\/p>\t\t\t\t\t\t\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t\t\t<div class=\"elementor-element elementor-element-f7b0263 elementor-widget elementor-widget-text-editor\" data-id=\"f7b0263\" data-element_type=\"widget\" data-e-type=\"widget\" data-widget_type=\"text-editor.default\">\n\t\t\t\t<div class=\"elementor-widget-container\">\n\t\t\t\t\t\t\t\t\t<h2>Step 6: Renewal, amendment and change of activity<\/h2>\n<p>Salamah supports renewing, amending and extending a license and transferring its ownership. The Elm fact sheet states that a license is valid for one year from issue and that renewal can be requested one month before expiry; because the sheet is undated, confirm current periods on the portal.<\/p>\n<p>A change of activity or an extension reopens the requirements. Change-of-use and extension permits fall under Article 13, and Article 7 applies code requirements to existing buildings as far as feasible, based on a technical report from an approved engineering office. In every case, <a href=\"https:\/\/azeidkgroup.com\/en\/sa\/media-center\/fire-systems-maintenance-contracts-saudi-arabia\/\">fire system maintenance contracts<\/a> and their records stay part of the file, because oversight extends to maintenance and operation.<\/p>\t\t\t\t\t\t\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t\t\t<div class=\"elementor-element elementor-element-05cd931 elementor-widget elementor-widget-text-editor\" data-id=\"05cd931\" data-element_type=\"widget\" data-e-type=\"widget\" data-widget_type=\"text-editor.default\">\n\t\t\t\t<div class=\"elementor-widget-container\">\n\t\t\t\t\t\t\t\t\t<h2>Common mistakes that delay approval, and what drives cost<\/h2>\n<ul>\n<li>Designing fire protection after the architectural drawings are approved, so routes and system locations clash.<\/li>\n<li>Fitting out before knowing the Salamah path and insurance requirements.<\/li>\n<li>Leaving acceptance tests and their records until the inspection date.<\/li>\n<li>Submitting drawings that do not match what was built.<\/li>\n<li>Changing the activity or splitting a unit without a change-of-use permit and a systems review.<\/li>\n<li>Waiting until the license nearly expires before reviewing maintenance records.<\/li>\n<\/ul>\n<p>Approval cost depends on the occupancy group, building area, the activity and its risk level, the number of required systems, how early fire protection enters the design, the number of comment rounds and, in existing buildings, the condition of the systems.<\/p>\t\t\t\t\t\t\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t\t\t<div class=\"elementor-element elementor-element-e526246 elementor-widget elementor-widget-text-editor\" data-id=\"e526246\" data-element_type=\"widget\" data-e-type=\"widget\" data-widget_type=\"text-editor.default\">\n\t\t\t\t<div class=\"elementor-widget-container\">\n\t\t\t\t\t\t\t\t\t<h2>How AZEIDK helps<\/h2>\n<p>AZEIDK&#8217;s <a href=\"https:\/\/azeidkgroup.com\/en\/sa\/services\/civil-defense-approval-support\/\">Civil Defense approval support<\/a> covers reviewing the requirements and documents the project needs, coordinating available drawings and technical reports, identifying compliance observations and assigning responsibility for them, supporting technical communication with stakeholders within the agreed scope, and organizing the follow-up file without guaranteeing any specific approval outcome, which rests with the competent authorities.<\/p>\n<p>It is complemented by <a href=\"https:\/\/azeidkgroup.com\/en\/sa\/services\/engineering-design-calculations\/\">engineering design and calculations<\/a>, <a href=\"https:\/\/azeidkgroup.com\/en\/sa\/services\/documentation-final-handover\/\">documentation and final handover<\/a> and, after occupation, <a href=\"https:\/\/azeidkgroup.com\/en\/sa\/services\/annual-maintenance-contracts\/\">annual maintenance contracts<\/a>, backed by 16+ years in the Saudi market.<\/p>\t\t\t\t\t\t\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t\t\t<div class=\"elementor-element elementor-element-626730b elementor-widget elementor-widget-text-editor\" data-id=\"626730b\" data-element_type=\"widget\" data-e-type=\"widget\" data-widget_type=\"text-editor.default\">\n\t\t\t\t<div class=\"elementor-widget-container\">\n\t\t\t\t\t\t\t\t\t<h2>FAQ<\/h2>\n<div class=\"az-faq\"><details class=\"az-faq__item\"><summary><h3>Does Civil Defense approve building drawings before the permit?<\/h3><\/summary><p>In the Balady building permit service, a technical inspection company checks the design against the Saudi Building Code, the municipality approves it, relevant external bodies approve where the activity requires it, and the issued permit data is sent to Civil Defense. Check early with the design office whether your activity needs a separate approval.<\/p><\/details><details class=\"az-faq__item\"><summary><h3>What is the difference between the occupancy certificate and the Civil Defense license?<\/h3><\/summary><p>The municipality issues the occupancy certificate, and under Article 16 of the Implementing Regulation a building may not be occupied without it. The Civil Defense license is obtained for the facility on Salamah, on a path set by the activity&#8217;s risk level, and is renewed when it expires, so an operating facility usually needs both.<\/p><\/details><details class=\"az-faq__item\"><summary><h3>How do I know if my activity is direct or indirect?<\/h3><\/summary><p>Use the Salamah investor journey service, which shows the path for your activity. According to the portal fact sheet, low- and medium-risk activities are licensed directly with a safety tools invoice or technical report, while high-risk activities need a safety company contract and maintenance contracts, followed by an inspection before the license.<\/p><\/details><details class=\"az-faq__item\"><summary><h3>Do I need a contract with an approved safety company?<\/h3><\/summary><p>For high-risk activities, yes: the indirect path requires a contract with a safety company and maintenance contracts. Direct activities need a safety tools invoice or technical report, depending on the activity; invoices come from safety companies approved on the portal and reports from approved offices. Salamah lists the approved companies.<\/p><\/details><details class=\"az-faq__item\"><summary><h3>How long is a Civil Defense license valid?<\/h3><\/summary><p>The Salamah fact sheet published by Elm states that a license is valid for one full year from issue and that renewal can be requested one month before expiry. Because the sheet is undated, confirm the period on the portal when the license is issued, and put the expiry date in your maintenance calendar.<\/p><\/details><details class=\"az-faq__item\"><summary><h3>Does every activity need third-party insurance?<\/h3><\/summary><p>No. The policy covers crowded places and high-risk activities subject to mandatory insurance, applied in phases under Council of Ministers Resolution No. 103. The Insurance Authority gives examples such as chemical warehouses, general warehouses holding a variety of goods and tire warehouses, so check your activity before applying for issue or renewal.<\/p><\/details><\/div>\t\t\t\t\t\t\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t\t\t<div class=\"elementor-element elementor-element-b36389c elementor-widget elementor-widget-text-editor\" data-id=\"b36389c\" data-element_type=\"widget\" data-e-type=\"widget\" data-widget_type=\"text-editor.default\">\n\t\t\t\t<div class=\"elementor-widget-container\">\n\t\t\t\t\t\t\t\t\t<div class=\"az-source\"><strong>References:<\/strong> the <a href=\"https:\/\/momah.gov.sa\/ar\/node\/5104\" rel=\"noopener\" target=\"_blank\">building permit service<\/a>, the <a href=\"https:\/\/momah.gov.sa\/ar\/e-services\/issuing-occupancy-certificate\" rel=\"noopener\" target=\"_blank\">occupancy certificate service<\/a> and the <a href=\"https:\/\/momah.gov.sa\/sites\/default\/files\/2025-10\/allayht%20altnfydhyt%20lnzam%20ttbyq%20kwd%20albna%20als%60wdy.pdf\" rel=\"noopener\" target=\"_blank\">Implementing Regulation of the Saudi Building Code Application Law<\/a> (Ministry of Municipalities and Housing, in Arabic), the <a href=\"https:\/\/elm.sa\/ar\/our-business\/digital-products\/Documents\/En\/Salamah%20EN.pdf\" rel=\"noopener\" target=\"_blank\">Salamah portal fact sheet<\/a> (Elm, undated), and the <a href=\"https:\/\/www.ia.gov.sa\/en\/media-center\/news\/122\" rel=\"noopener\" target=\"_blank\">Insurance Authority announcement of the third-party policy<\/a> (16 August 2026).<\/div>\t\t\t\t\t\t\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t\t\t<div class=\"elementor-element elementor-element-ea6dd86 elementor-widget elementor-widget-text-editor\" data-id=\"ea6dd86\" data-element_type=\"widget\" data-e-type=\"widget\" data-widget_type=\"text-editor.default\">\n\t\t\t\t<div class=\"elementor-widget-container\">\n\t\t\t\t\t\t\t\t\t<p class=\"az-cta\"><strong>Preparing for a Civil Defense license or renewal?<\/strong> Send our engineers your activity, drawings and latest test reports, and we will review the file and identify what is missing before you apply. <a href=\"https:\/\/azeidkgroup.com\/en\/sa\/contact\/\">Contact the AZEIDK team<\/a><\/p>\t\t\t\t\t\t\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t","protected":false},"excerpt":{"rendered":"<p>Civil Defense fire safety approval in Saudi Arabia, step by step: design review in the building permit, occupancy certificate, Salamah license and renewal.<\/p>\n","protected":false},"author":2,"featured_media":16316,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"_acf_changed":false,"footnotes":""},"categories":[221,219],"tags":[],"azeidk_region":[223],"class_list":["post-12471","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-azeidk-articles","category-azeidk-blog"],"acf":[],"_links":{"self":[{"href":"https:\/\/azeidkgroup.com\/en\/wp-json\/wp\/v2\/posts\/12471","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/azeidkgroup.com\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/azeidkgroup.com\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/azeidkgroup.com\/en\/wp-json\/wp\/v2\/users\/2"}],"replies":[{"embeddable":true,"href":"https:\/\/azeidkgroup.com\/en\/wp-json\/wp\/v2\/comments?post=12471"}],"version-history":[{"count":3,"href":"https:\/\/azeidkgroup.com\/en\/wp-json\/wp\/v2\/posts\/12471\/revisions"}],"predecessor-version":[{"id":18000,"href":"https:\/\/azeidkgroup.com\/en\/wp-json\/wp\/v2\/posts\/12471\/revisions\/18000"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/azeidkgroup.com\/en\/wp-json\/wp\/v2\/media\/16316"}],"wp:attachment":[{"href":"https:\/\/azeidkgroup.com\/en\/wp-json\/wp\/v2\/media?parent=12471"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/azeidkgroup.com\/en\/wp-json\/wp\/v2\/categories?post=12471"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/azeidkgroup.com\/en\/wp-json\/wp\/v2\/tags?post=12471"},{"taxonomy":"azeidk_region","embeddable":true,"href":"https:\/\/azeidkgroup.com\/en\/wp-json\/wp\/v2\/azeidk_region?post=12471"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}