{"id":12454,"date":"2026-06-03T19:45:58","date_gmt":"2026-06-03T19:45:58","guid":{"rendered":"https:\/\/azeidk.com\/?p=12454"},"modified":"2026-10-29T19:03:52","modified_gmt":"2026-10-29T19:03:52","slug":"fire-systems-maintenance-contracts-saudi-arabia","status":"publish","type":"post","link":"https:\/\/azeidkgroup.com\/en\/sa\/media-center\/fire-systems-maintenance-contracts-saudi-arabia\/","title":{"rendered":"Fire System Maintenance Contracts in Saudi Arabia: Key Clauses"},"content":{"rendered":"\t\t<div data-elementor-type=\"wp-post\" data-elementor-id=\"12454\" class=\"elementor elementor-12454 elementor-12442\" data-elementor-post-type=\"post\">\n\t\t\t\t<div class=\"elementor-element elementor-element-1d33127 e-con-full az-el-article e-flex e-con e-parent\" data-id=\"1d33127\" data-element_type=\"container\" data-e-type=\"container\">\n\t\t\t\t<div class=\"elementor-element elementor-element-1b258d3 elementor-widget elementor-widget-text-editor\" data-id=\"1b258d3\" data-element_type=\"widget\" data-e-type=\"widget\" data-widget_type=\"text-editor.default\">\n\t\t\t\t<div class=\"elementor-widget-container\">\n\t\t\t\t\t\t\t\t\t<p class=\"az-intro\">A fire system maintenance contract in Saudi Arabia should define the systems covered, the standard and edition behind the inspection, testing and maintenance (ITM) schedule, the records handed to the owner, how findings are handled and the agreed response times. The contract delegates tasks, not responsibility: the owner stays responsible under National Fire Protection Association (NFPA) 25, and Civil Defense monitors fire protection during operation too.<\/p>\t\t\t\t\t\t\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t\t\t<div class=\"elementor-element elementor-element-534e3ca elementor-widget elementor-widget-text-editor\" data-id=\"534e3ca\" data-element_type=\"widget\" data-e-type=\"widget\" data-widget_type=\"text-editor.default\">\n\t\t\t\t<div class=\"elementor-widget-container\">\n\t\t\t\t\t\t\t\t\t<div class=\"az-keybox\"><h2>Key takeaways<\/h2>\n<ul>\n<li>Under the 2026 edition of NFPA 25, the owner or designated representative corrects deficiencies and impairments, and ITM is done by personnel qualified for each task.<\/li>\n<li>On Salamah, licensing a high-risk activity requires a safety company contract and maintenance contracts before inspection, per the portal fact sheet.<\/li>\n<li>Build the visit schedule from the standard&#8217;s tables for each component, not a fixed visit count.<\/li>\n<li>Response time and repair time are contract terms; the standard requires deficiencies to be corrected within a time frame approved by the authority having jurisdiction (AHJ).<\/li>\n<li>In the 2025-cycle NFPA 72 committee text, the system owner keeps ITM records until the next test and for 1 year thereafter.<\/li>\n<\/ul><\/div>\t\t\t\t\t\t\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t\t\t<div class=\"elementor-element elementor-element-23249fc elementor-widget elementor-widget-text-editor\" data-id=\"23249fc\" data-element_type=\"widget\" data-e-type=\"widget\" data-widget_type=\"text-editor.default\">\n\t\t\t\t<div class=\"elementor-widget-container\">\n\t\t\t\t\t\t\t\t\t<h2>Why owners need a precisely written contract<\/h2>\n<p>The 2026 edition of NFPA 25, as corrected by <a href=\"https:\/\/docinfofiles.nfpa.org\/files\/AboutTheCodes\/25\/Errata_25_26_1.pdf\" rel=\"noopener\" target=\"_blank\">Errata 25-26-1<\/a>, requires the owner or designated representative to correct or repair deficiencies and impairments (4.1.6.1). The <a href=\"https:\/\/docinfofiles.nfpa.org\/files\/AboutTheCodes\/25\/25_A2025_INM_AAA_SD_SRReport.pdf\" rel=\"noopener\" target=\"_blank\">committee Second Draft report<\/a> shows the owner must also notify the AHJ, the fire department where required and the alarm-receiving facility of impairments and shutdowns (4.1.4). A contractor does only what is contracted, so the contract should say what it covers.<\/p>\n<p>In the Kingdom, Civil Defense monitors fire protection requirements through maintenance and operation under Article 10 of the <a href=\"https:\/\/momah.gov.sa\/sites\/default\/files\/2025-10\/allayht%20altnfydhyt%20lnzam%20ttbyq%20kwd%20albna%20als%60wdy.pdf\" rel=\"noopener\" target=\"_blank\">Implementing Regulation of the Saudi Building Code Application Law<\/a>. According to the <a href=\"https:\/\/elm.sa\/ar\/our-business\/digital-products\/Documents\/En\/Salamah%20EN.pdf\" rel=\"noopener\" target=\"_blank\">Salamah portal fact sheet<\/a> published by Elm, safety companies approved on the portal provide maintenance contracts, which the indirect path for high-risk activities requires before the Civil Defense inspection, as our <a href=\"https:\/\/azeidkgroup.com\/en\/sa\/media-center\/civil-defense-fire-safety-approval-saudi-arabia\/\">Civil Defense approval guide<\/a> explains.<\/p>\t\t\t\t\t\t\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t\t\t<div class=\"elementor-element elementor-element-3f49d66 elementor-widget elementor-widget-text-editor\" data-id=\"3f49d66\" data-element_type=\"widget\" data-e-type=\"widget\" data-widget_type=\"text-editor.default\">\n\t\t\t\t<div class=\"elementor-widget-container\">\n\t\t\t\t\t\t\t\t\t<h2>Key clauses in a maintenance contract<\/h2>\n<div class=\"az-table-wrap\"><table>\n<thead><tr><th>Clause<\/th><th>What it should define<\/th><th>Why it matters<\/th><\/tr><\/thead>\n<tbody>\n<tr><td>Parties and premises<\/td><td>Owner, contractor and its Salamah approval where needed, buildings covered<\/td><td>Links the contract to the license file<\/td><\/tr>\n<tr><td>System inventory<\/td><td>Systems, quantities, locations and explicit exclusions<\/td><td>Prevents disputes over scope<\/td><\/tr>\n<tr><td>Standards basis<\/td><td>Editions of NFPA 25, NFPA 72 and others, manufacturer instructions, Civil Defense requirements<\/td><td>The Saudi Fire Protection Code (SBC 801) and Civil Defense set the edition<\/td><\/tr>\n<tr><td>Schedule annex<\/td><td>Each task, its frequency and reference<\/td><td>Visit numbers follow from it<\/td><\/tr>\n<tr><td>Task split<\/td><td>Site staff tasks and contractor tasks<\/td><td>Weekly and monthly tasks need an owner<\/td><\/tr>\n<tr><td>Qualifications<\/td><td>Technician qualifications per task<\/td><td>Required by NFPA 25 (4.1.1.3)<\/td><\/tr>\n<tr><td>Findings and repairs<\/td><td>Classification, time frames, repair pricing and approval<\/td><td>Turns reports into action<\/td><\/tr>\n<tr><td>Response<\/td><td>Call-out times, out-of-hours work, impairment role<\/td><td>Measurable and reviewable<\/td><\/tr>\n<tr><td>Records<\/td><td>Report format and delivery; records belong to the owner<\/td><td>Needed at inspection and renewal<\/td><\/tr>\n<tr><td>Term and exit<\/td><td>Duration, renewal, condition survey at start, records at exit<\/td><td>Protects the owner when changing contractor<\/td><\/tr>\n<\/tbody>\n<\/table><\/div>\t\t\t\t\t\t\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t\t\t<div class=\"elementor-element elementor-element-37d9897 elementor-widget elementor-widget-text-editor\" data-id=\"37d9897\" data-element_type=\"widget\" data-e-type=\"widget\" data-widget_type=\"text-editor.default\">\n\t\t\t\t<div class=\"elementor-widget-container\">\n\t\t\t\t\t\t\t\t\t<h2>Scope: each system to its standard<\/h2>\n<p>Name the ITM standard for each system and refer to the manufacturer&#8217;s instructions:<\/p>\n<ul>\n<li>Water-based systems (sprinklers, standpipes, pumps, tanks, valves) under NFPA 25; see our <a href=\"https:\/\/azeidkgroup.com\/en\/sa\/media-center\/nfpa-25-itm-water-based-systems-guide\/\">NFPA 25 ITM guide<\/a>.<\/li>\n<li>Fire alarm (panel, loops, detectors, manual call points, notification appliances) under NFPA 72 Chapter 14; see our <a href=\"https:\/\/azeidkgroup.com\/en\/sa\/media-center\/nfpa-72-fire-alarm-code-guide\/\">NFPA 72 guide<\/a>.<\/li>\n<li>Special suppression: clean agent (see our <a href=\"https:\/\/azeidkgroup.com\/en\/sa\/media-center\/nfpa-2001-clean-agent-standard-guide\/\">NFPA 2001 guide<\/a>), foam and kitchen systems, each to its standard.<\/li>\n<li>Portable extinguishers under NFPA 10; see our <a href=\"https:\/\/azeidkgroup.com\/en\/sa\/media-center\/nfpa-10-portable-fire-extinguishers-guide\/\">NFPA 10 guide<\/a>.<\/li>\n<li>Smoke control, emergency lighting, fire doors and low-current interfaces: state whether they are in scope.<\/li>\n<\/ul>\t\t\t\t\t\t\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t\t\t<div class=\"elementor-element elementor-element-4850b51 elementor-widget elementor-widget-text-editor\" data-id=\"4850b51\" data-element_type=\"widget\" data-e-type=\"widget\" data-widget_type=\"text-editor.default\">\n\t\t\t\t<div class=\"elementor-widget-container\">\n\t\t\t\t\t\t\t\t\t<h2>The ITM schedule: where frequencies come from<\/h2>\n<p>Instead of writing &#8220;monthly visit&#8221;, attach an annex listing each task, its frequency and reference, and derive the visits from it. Examples from the 2026 NFPA 25 tables (committee Second Draft report) and the NFPA 72 Chapter 14 text in 2025-cycle committee documents:<\/p>\n<div class=\"az-table-wrap\"><table>\n<thead><tr><th>Component<\/th><th>Task<\/th><th>Frequency<\/th><th>Reference<\/th><\/tr><\/thead>\n<tbody>\n<tr><td>Control valves<\/td><td>Inspection<\/td><td>Weekly (not locked or supervised), monthly (locked or supervised), quarterly (electrically supervised)<\/td><td>NFPA 25, 13.3.2.1<\/td><\/tr>\n<tr><td>Control valves<\/td><td>Operation and position test<\/td><td>Annually<\/td><td>NFPA 25, 13.3.3.1<\/td><\/tr>\n<tr><td>Fire department connections<\/td><td>Inspection<\/td><td>Quarterly<\/td><td>NFPA 25, 13.8.1<\/td><\/tr>\n<tr><td>Sprinklers, pipe and hangers<\/td><td>Visual inspection<\/td><td>Annually<\/td><td>NFPA 25, 5.2.1 to 5.2.3<\/td><\/tr>\n<tr><td>Fire pumps<\/td><td>No-flow run<\/td><td>Weekly (diesel), weekly or monthly (electric)<\/td><td>NFPA 25, 8.3.1<\/td><\/tr>\n<tr><td>Fire pumps<\/td><td>Flow performance test<\/td><td>Annually<\/td><td>NFPA 25, 8.3.3<\/td><\/tr>\n<tr><td>Standpipes<\/td><td>Flow test<\/td><td>Every 5 years<\/td><td>NFPA 25, 6.3.1<\/td><\/tr>\n<tr><td>Smoke detectors<\/td><td>Sensitivity test<\/td><td>Within 1 year of installation, then every alternate year; up to 5 years after the second calibration test if within range<\/td><td>NFPA 72, 14.4.4.3<\/td><\/tr>\n<\/tbody>\n<\/table><\/div>\n<p>The NFPA 25 annex notes that many daily, weekly and monthly tasks, such as checking valve positions and pressures, can be done by building staff, so say who does them and who reviews the records. NFPA 72 Tables 14.3.1 and 14.4.3.2 cover the other alarm components. All are minimums; manufacturers and the AHJ may require more.<\/p>\t\t\t\t\t\t\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t\t\t<div class=\"elementor-element elementor-element-c7bfa11 elementor-widget elementor-widget-text-editor\" data-id=\"c7bfa11\" data-element_type=\"widget\" data-e-type=\"widget\" data-widget_type=\"text-editor.default\">\n\t\t\t\t<div class=\"elementor-widget-container\">\n\t\t\t\t\t\t\t\t\t<h2>Reports and records: what is handed over and who keeps it<\/h2>\n<p>In the NFPA 72 Chapter 14 text quoted in the 2025-cycle <a href=\"https:\/\/docinfofiles.nfpa.org\/files\/AboutTheCodes\/72\/72_A2024_SIG_TCs_SD_PCresponses.pdf\" rel=\"noopener\" target=\"_blank\">NFPA 72 public comment responses report<\/a>, the owner receives as-built drawings, operation and maintenance manuals and a written sequence of operation after acceptance and keeps them for the life of the system, and keeps ITM records until the next test and for 1 year thereafter (14.6.2.1), on paper or electronically.<\/p>\n<p>According to the <a href=\"https:\/\/nfsa.org\/2025\/11\/06\/a-guide-to-documentation-and-owner-retention\/\" rel=\"noopener\" target=\"_blank\">National Fire Sprinkler Association (NFSA)<\/a>, the 2020 edition of NFPA 25 requires each record to be kept for one year after the next occurrence of that task, and acceptance records for the life of the system; confirm it in your adopted edition. Each report should ideally include:<\/p>\n<ul>\n<li>Visit date, items inspected or tested, and the reference for each task.<\/li>\n<li>Measured results, such as main drain pressures and pump curves, not just &#8220;OK&#8221;.<\/li>\n<li>Classified findings with the proposed action and time frame.<\/li>\n<li>Impairments, who was notified, and when protection was restored.<\/li>\n<\/ul>\t\t\t\t\t\t\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t\t\t<div class=\"elementor-element elementor-element-129c55d elementor-widget elementor-widget-text-editor\" data-id=\"129c55d\" data-element_type=\"widget\" data-e-type=\"widget\" data-widget_type=\"text-editor.default\">\n\t\t\t\t<div class=\"elementor-widget-container\">\n\t\t\t\t\t\t\t\t\t<h2>Findings and response times: what the standard sets and what the contract sets<\/h2>\n<p>The 2026 edition of NFPA 25 requires deficiencies to be corrected within an AHJ-approved time frame, with an approved Chapter 15 impairment program until impairments are repaired (4.1.6.2); its annex cites a generally accepted practice of 30 days for critical and 90 days for noncritical deficiencies. How fast a technician arrives after a call is a contract term, not a code requirement. Our <a href=\"https:\/\/azeidkgroup.com\/en\/sa\/media-center\/preventive-vs-corrective-fire-maintenance\/\">preventive vs corrective maintenance guide<\/a> explains classification and impairment handling.<\/p>\n<div class=\"az-table-wrap\"><table>\n<thead><tr><th>Item<\/th><th>Source<\/th><th>How to write it in the contract<\/th><\/tr><\/thead>\n<tbody>\n<tr><td>Deficiency correction time<\/td><td>NFPA 25 (4.1.6.2): AHJ-approved time frame<\/td><td>A time frame per class, within what the AHJ accepts<\/td><\/tr>\n<tr><td>Impairments<\/td><td>NFPA 25: notification (4.1.4) and Chapter 15<\/td><td>Contractor role in tags, notification and interim measures<\/td><\/tr>\n<tr><td>Call-out response time<\/td><td>Agreement of the parties<\/td><td>Arrival time per priority level and how it is measured<\/td><\/tr>\n<tr><td>Repair time<\/td><td>Agreement, within the standard&#8217;s time frame<\/td><td>Starts at owner approval, with a cap on parts lead time<\/td><\/tr>\n<tr><td>Recalled components<\/td><td>NFPA 25 (4.1.6.1.1): written notice to the owner<\/td><td>Contractor gives written notice on discovery<\/td><\/tr>\n<\/tbody>\n<\/table><\/div>\t\t\t\t\t\t\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t\t\t<div class=\"elementor-element elementor-element-d5694b1 elementor-widget elementor-widget-text-editor\" data-id=\"d5694b1\" data-element_type=\"widget\" data-e-type=\"widget\" data-widget_type=\"text-editor.default\">\n\t\t\t\t<div class=\"elementor-widget-container\">\n\t\t\t\t\t\t\t\t\t<h2>Pricing and common contract mistakes<\/h2>\n<p>Contracts usually combine a fixed fee for preventive visits with variable pricing for repairs and spares. Price depends on the number, size, age and condition of systems, long-interval tests due in the term, access, out-of-hours work, documentation, and AHJ and insurer requirements.<\/p>\n<ul>\n<li>A fixed visit count that misses weekly and monthly tasks and five-year tests.<\/li>\n<li>Response time undefined, or defined without a way to measure it.<\/li>\n<li>Reports listing findings with no classification and no close-out.<\/li>\n<li>Records held only by the contractor and lost when it changes.<\/li>\n<li>Starting without a condition survey, so earlier faults are disputed later.<\/li>\n<\/ul>\n<p>See our article on <a href=\"https:\/\/azeidkgroup.com\/en\/sa\/media-center\/maintenance-risk\/\">the risks of deferred fire system maintenance<\/a>.<\/p>\t\t\t\t\t\t\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t\t\t<div class=\"elementor-element elementor-element-b264526 elementor-widget elementor-widget-text-editor\" data-id=\"b264526\" data-element_type=\"widget\" data-e-type=\"widget\" data-widget_type=\"text-editor.default\">\n\t\t\t\t<div class=\"elementor-widget-container\">\n\t\t\t\t\t\t\t\t\t<h2>Checklist before signing<\/h2>\n<ol>\n<li>Attach a full system inventory.<\/li>\n<li>State the standard editions and manufacturer instructions behind the schedule.<\/li>\n<li>Require a schedule annex with each task, frequency and reference.<\/li>\n<li>Split tasks between site staff and the contractor in writing.<\/li>\n<li>Agree classification, correction time frames and repair pricing.<\/li>\n<li>Set measurable response times per priority level.<\/li>\n<li>Define the report format and that records belong to the owner.<\/li>\n<li>Check the contractor&#8217;s Salamah approval if your license needs a maintenance contract.<\/li>\n<li>Start with a condition survey before responsibility begins.<\/li>\n<\/ol>\t\t\t\t\t\t\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t\t\t<div class=\"elementor-element elementor-element-67aea0d elementor-widget elementor-widget-text-editor\" data-id=\"67aea0d\" data-element_type=\"widget\" data-e-type=\"widget\" data-widget_type=\"text-editor.default\">\n\t\t\t\t<div class=\"elementor-widget-container\">\n\t\t\t\t\t\t\t\t\t<h2>How AZEIDK helps<\/h2>\n<p>AZEIDK&#8217;s <a href=\"https:\/\/azeidkgroup.com\/en\/sa\/services\/annual-maintenance-contracts\/\">annual maintenance contracts<\/a> include preparing a schedule of periodic maintenance visits and inspections in accordance with the contractual scope; inspecting fire alarm control panels, detectors, and associated notification devices; reviewing fire suppression system components and fire pumps according to the system type; conducting periodic functional tests and documenting the results; and providing reports detailing observations and recommended corrective actions.<\/p>\n<p>For systems not maintained for a while, we start with an <a href=\"https:\/\/azeidkgroup.com\/en\/sa\/services\/assessment-of-existing-systems-scope-of-work-definition\/\">assessment of existing systems and scope of work definition<\/a>, and complaints and technical issues can be submitted and followed up through the <a href=\"https:\/\/azeidkgroup.com\/en\/sa\/azeidk-care\/\">AZEIDK Care Center<\/a>, backed by 17+ branches and service regions.<\/p>\t\t\t\t\t\t\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t\t\t<div class=\"elementor-element elementor-element-c06dc96 elementor-widget elementor-widget-text-editor\" data-id=\"c06dc96\" data-element_type=\"widget\" data-e-type=\"widget\" data-widget_type=\"text-editor.default\">\n\t\t\t\t<div class=\"elementor-widget-container\">\n\t\t\t\t\t\t\t\t\t<h2>FAQ<\/h2>\n<div class=\"az-faq\"><details class=\"az-faq__item\"><summary><h3>What should a fire system maintenance contract include?<\/h3><\/summary><p>It should include an inventory of systems covered and excluded, the standard editions behind the ITM schedule, a schedule annex, the task split, technician qualifications, finding classification and correction time frames, call-out response times, how repairs and spares are priced, the report format and who owns the records.<\/p><\/details><details class=\"az-faq__item\"><summary><h3>How many maintenance visits are needed per year?<\/h3><\/summary><p>The standard sets task frequencies, not visit counts. In NFPA 25 they range from daily or weekly, such as inspecting some control valves and running a diesel fire pump without flow, to annual and five-yearly. Derive the visit count from the schedule, and define what site staff do between visits.<\/p><\/details><details class=\"az-faq__item\"><summary><h3>Does Civil Defense require a maintenance contract for licensing?<\/h3><\/summary><p>According to the Salamah portal fact sheet, licensing a high-risk activity requires a contract with a safety company and maintenance contracts before the Civil Defense inspection. Low- and medium-risk activities are licensed with a safety tools invoice or technical report, but maintenance still matters because Civil Defense monitors maintenance and operation.<\/p><\/details><details class=\"az-faq__item\"><summary><h3>Does the code set a response time for fire system faults?<\/h3><\/summary><p>NFPA 25 does not set how fast a technician must arrive. It requires deficiencies to be corrected within a time frame approved by the AHJ, and impairments to be managed under Chapter 15 until repaired. Write the response time into the contract for each priority level, with a way to measure it.<\/p><\/details><details class=\"az-faq__item\"><summary><h3>How long should fire system maintenance records be kept?<\/h3><\/summary><p>In the 2025-cycle NFPA 72 text, the owner keeps ITM records until the next test and for 1 year thereafter, and as-built drawings and manuals for the system&#8217;s life. The NFSA reports that the 2020 edition of NFPA 25 keeps records one year after the next occurrence of the task, and acceptance records for the system&#8217;s life.<\/p><\/details><details class=\"az-faq__item\"><summary><h3>Does a maintenance contract transfer responsibility to the contractor?<\/h3><\/summary><p>No. The contract delegates tasks; responsibility stays with the owner or designated representative under NFPA 25, including correcting deficiencies and reporting impairments. The owner should review every report, approve repairs and confirm that findings are closed, rather than just signing the contract.<\/p><\/details><\/div>\t\t\t\t\t\t\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t\t\t<div class=\"elementor-element elementor-element-6c44e0a elementor-widget elementor-widget-text-editor\" data-id=\"6c44e0a\" data-element_type=\"widget\" data-e-type=\"widget\" data-widget_type=\"text-editor.default\">\n\t\t\t\t<div class=\"elementor-widget-container\">\n\t\t\t\t\t\t\t\t\t<div class=\"az-source\"><strong>References:<\/strong> the <a href=\"https:\/\/docinfofiles.nfpa.org\/files\/AboutTheCodes\/25\/25_A2025_INM_AAA_SD_SRReport.pdf\" rel=\"noopener\" target=\"_blank\">NFPA 25 2026 Second Draft report<\/a>, <a href=\"https:\/\/docinfofiles.nfpa.org\/files\/AboutTheCodes\/25\/Errata_25_26_1.pdf\" rel=\"noopener\" target=\"_blank\">NFPA Errata 25-26-1<\/a>, the <a href=\"https:\/\/docinfofiles.nfpa.org\/files\/AboutTheCodes\/72\/72_A2024_SIG_TCs_SD_PCresponses.pdf\" rel=\"noopener\" target=\"_blank\">NFPA 72 2025-cycle public comment responses report<\/a>, the <a href=\"https:\/\/nfsa.org\/2025\/11\/06\/a-guide-to-documentation-and-owner-retention\/\" rel=\"noopener\" target=\"_blank\">NFSA guide to documentation and owner retention<\/a>, the <a href=\"https:\/\/elm.sa\/ar\/our-business\/digital-products\/Documents\/En\/Salamah%20EN.pdf\" rel=\"noopener\" target=\"_blank\">Salamah portal fact sheet<\/a> (Elm, undated), and the <a href=\"https:\/\/momah.gov.sa\/sites\/default\/files\/2025-10\/allayht%20altnfydhyt%20lnzam%20ttbyq%20kwd%20albna%20als%60wdy.pdf\" rel=\"noopener\" target=\"_blank\">Implementing Regulation of the Saudi Building Code Application Law<\/a> (in Arabic).<\/div>\t\t\t\t\t\t\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t\t\t<div class=\"elementor-element elementor-element-f3e780d elementor-widget elementor-widget-text-editor\" data-id=\"f3e780d\" data-element_type=\"widget\" data-e-type=\"widget\" data-widget_type=\"text-editor.default\">\n\t\t\t\t<div class=\"elementor-widget-container\">\n\t\t\t\t\t\t\t\t\t<p class=\"az-cta\"><strong>Reviewing a maintenance contract before signing or renewal?<\/strong> Send us your system list, draft contract and latest inspection report, and we will propose a scope and schedule. <a href=\"https:\/\/azeidkgroup.com\/en\/sa\/contact\/\">Contact the AZEIDK team<\/a><\/p>\t\t\t\t\t\t\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t","protected":false},"excerpt":{"rendered":"<p>What a fire system maintenance contract in Saudi Arabia should include: NFPA 25 and NFPA 72 scope, frequencies from the tables, records and response times.<\/p>\n","protected":false},"author":2,"featured_media":16322,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"_acf_changed":false,"footnotes":""},"categories":[221,219],"tags":[],"azeidk_region":[223],"class_list":["post-12454","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-azeidk-articles","category-azeidk-blog"],"acf":[],"_links":{"self":[{"href":"https:\/\/azeidkgroup.com\/en\/wp-json\/wp\/v2\/posts\/12454","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/azeidkgroup.com\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/azeidkgroup.com\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/azeidkgroup.com\/en\/wp-json\/wp\/v2\/users\/2"}],"replies":[{"embeddable":true,"href":"https:\/\/azeidkgroup.com\/en\/wp-json\/wp\/v2\/comments?post=12454"}],"version-history":[{"count":3,"href":"https:\/\/azeidkgroup.com\/en\/wp-json\/wp\/v2\/posts\/12454\/revisions"}],"predecessor-version":[{"id":18003,"href":"https:\/\/azeidkgroup.com\/en\/wp-json\/wp\/v2\/posts\/12454\/revisions\/18003"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/azeidkgroup.com\/en\/wp-json\/wp\/v2\/media\/16322"}],"wp:attachment":[{"href":"https:\/\/azeidkgroup.com\/en\/wp-json\/wp\/v2\/media?parent=12454"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/azeidkgroup.com\/en\/wp-json\/wp\/v2\/categories?post=12454"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/azeidkgroup.com\/en\/wp-json\/wp\/v2\/tags?post=12454"},{"taxonomy":"azeidk_region","embeddable":true,"href":"https:\/\/azeidkgroup.com\/en\/wp-json\/wp\/v2\/azeidk_region?post=12454"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}